Requirements at a glance
| Agency | Wyoming Department of Fire Prevention and Electrical Safety (State Fire Marshal); exam by ICC through Pearson VUE |
|---|---|
| Exam | 100 questions, 5 hours, 75% to pass |
| Experience | 16,000 hours including 8,000 as a licensed journeyman, plus 576 hours of approved classroom training. |
| Books allowed | NEC or NEC Handbook (2023 per ICC's August 2025 bulletin), Ugly's (any edition), Ferm's Fast Finder, Tom Henry's Key Word Index |
| Fees | $115 per exam to Pearson VUE; the license is $200 for 3 years. |
Electricians applying to the Wyoming State Fire Marshal for a master electrician license. You need 16,000 hours, including 8,000 as a licensed journeyman, plus 576 hours of approved classroom training.
Official links
- Wyoming State Fire Marshal: electrical licensing (opens in a new tab)
- Apply and pay for your license (Wyoming electrical licensing portal) (opens in a new tab)
- Register with ICC at Pearson VUE (opens in a new tab)
- ICC Wyoming Electrical Contractor/Trades Bulletin (PDF) (opens in a new tab)
- 041-5 Wyo. Code R. § 3 (examinations and passing scores) (opens in a new tab)
How to get licensed, step by step
Check your experience
Make sure you meet the State Fire Marshal's requirements for the master electrician license: 16,000 hours including 8,000 as a licensed journeyman, plus 576 hours of approved classroom training.
Wyoming State Fire Marshal: electrical licensing (opens in a new tab)
Apply and get approved
Apply through the Wyoming electrical licensing portal. Wait for your approval notice, then allow 24 to 48 hours before you schedule so ICC can process your record.
Apply and pay for your license (Wyoming electrical licensing portal) (opens in a new tab)ICC Wyoming Electrical Contractor/Trades Bulletin (PDF) (opens in a new tab)
Register and pay with Pearson VUE
Create a Pearson VUE account for ICC, pick the Wyoming exam, pay $115 and book a seat at a test center.
Pass the exam
Bring your tabbed references. Your result shows right after the exam. If you fail, you must wait 10 days before you retest, and each attempt costs a new fee.
Register with ICC at Pearson VUE (opens in a new tab)041-5 Wyo. Code R. § 3 (examinations and passing scores) (opens in a new tab)
How to prepare
- ICC's August 2025 bulletin still lists the 2023 NEC, but Wyoming has adopted the 2026 NEC. Check ICC's exam catalog for your exam before you buy a book.
- Tab your books before exam day. There's no time to look up every answer, so know where Articles 90, 100, 110, 210 to 250, 300 to 392, 430 and Chapter 9 sit.
- Wiring methods and materials (19), services and service equipment (16) and branch circuits and conductors (16) are half the exam. Feeders and control devices are only 7 questions together.
- General knowledge (12) and special occupancies, equipment and conditions (12) include load calculations, Chapter 5 to 7 articles and fire alarm basics. You need 75%, so don't skip them.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2023 Edition (or the NEC Handbook)Essential
Bring your own; the exam is based on the code provisions only. ICC's August 2025 bulletin lists the 2023 edition even though Wyoming adopted the 2026 NEC, so check ICC's exam catalog before you buy.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Ugly's Electrical References (any edition)
Allowed in the exam room. Formulas for Ohm's law, voltage drop, motors and transformers.
Ferm's Fast Finder Index or Tom Henry's Key Word Index
Both are allowed, and a good index saves time on the questions you must look up.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC) or NEC Handbook (code provisions only are tested), 2023 Edition per ICC's August 2025 bulletin
- Ugly's Electrical References (any edition)
- Optional: Ferm's Fast Finder Index or Tom Henry's Key Word Index
What's on the exam
Official content outline from the International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Knowledge | 12 | |
| Services and Service Equipment | 16 | |
| Feeders | 4 | |
| Branch Circuits and Conductors | 16 | |
| Wiring Methods and Materials | 19 | |
| Equipment and Devices | 10 | |
| Control Devices | 3 | |
| Motors and Generators | 8 | |
| Special Occupancies, Equipment, and Conditions | 12 |
Exam day details
- Administered by the International Code Council (ICC), delivered by Pearson VUE, for the Wyoming Department of Fire Prevention and Electrical Safety (State Fire Marshal).
- Fee: $115 per exam, paid to Pearson VUE when you schedule. State license fees are separate.
- 100 questions in 5 hours; 75% to pass (041-5 Wyo. Code R. § 3).
- Open book. ICC's August 2025 bulletin lists the 2023 NEC as the reference, even though Wyoming has adopted the 2026 NEC for enforcement. Check ICC's exam catalog for your exam before you buy a book.
- Apply to the State Fire Marshal and get approved first, then register with ICC through Pearson VUE. ICC suggests waiting 24 to 48 hours after approval before you schedule.
- Questions are four-option multiple choice and there is no penalty for guessing. Your result shows right after the exam.
- You must wait 10 days before retaking a failed exam. Each attempt needs a new fee.
- ICC exam number 701. Wiring methods and materials (19), services and service equipment (16) and branch circuits and conductors (16) are half the exam.
Frequently asked questions
What's on the Wyoming master electrician exam?
ICC's August 2025 outline, 100 questions: wiring methods and materials 19, services and service equipment 16, branch circuits and conductors 16, general knowledge 12, special occupancies, equipment and conditions 12, equipment and devices 10, motors and generators 8, feeders 4 and control devices 3.
Which NEC edition do I bring to the Wyoming electrical exam?
ICC's August 2025 bulletin lists the 2023 NEC, although Wyoming has adopted the 2026 NEC for enforcement. The NEC Handbook, Ugly's (any edition), Ferm's Fast Finder and Tom Henry's Key Word Index are also allowed. Check ICC's exam catalog before you buy a book.
Who gives the Wyoming electrical exams?
ICC, through Pearson VUE. The State Fire Marshal approves your application first; then you register and pay Pearson VUE $115 and test at a Pearson VUE center.
Free questions with answers
Show all 10 free questions and answers
A 20-ampere, 120-volt branch circuit uses 12 AWG copper (6,530 circular mils, K = 12.9 for copper) with the load 100 feet from the panel. What is the approximate voltage drop at 20 amperes?
Answer: 7.9 volts
VD = 2 x K x I x L / CM = 2 x 12.9 x 20 x 100 / 6,530 = 7.9 V, about 6.6 percent of 120 V (the 3 percent branch circuit recommendation in the Informational Note to 210.19 is exceeded). 3.95 V forgets the return conductor, and 15.8 V doubles twice.
Reference: NFPA 70, National Electrical Code, 2023, Chapter 9, Table 8 (12 AWG area); voltage-drop formula
As a general rule, how many services may supply a building or other structure under Article 230?
Answer: One service
Section 230.2 states that a building or other structure served shall be supplied by only one service unless one of the listed exceptions (such as fire pumps, emergency systems, capacity requirements or different voltages) applies.
Reference: NFPA 70, National Electrical Code, 2023, 230.2
What is the minimum rating of the service disconnecting means for a one-family dwelling?
Answer: 100 amperes, 3-wire
Section 230.79(C) requires the service disconnecting means for a one-family dwelling to have a rating of not less than 100 A, 3-wire. The 60 A rating in 230.79(B) is only for installations with two 2-wire branch circuits.
Reference: NFPA 70, National Electrical Code, 2023, 230.79(C)
A 3-phase, 4-wire feeder serves a balanced-load plant with a maximum unbalanced load of 350 A on the neutral, all linear loads. After applying the permitted demand to the neutral, what neutral load is used for sizing?
Answer: 305 amperes
The first 200 A of unbalanced load stays at 100%, and the portion over 200 A is reduced to 70%: 200 + (150 x 0.70) = 200 + 105 = 305 A. 245 A applies 70% to the whole load, 350 A takes no reduction, and 200 A drops the part above 200 A.
Reference: NFPA 70, National Electrical Code, 2023, 220.61(B) feeder or service neutral load (70% of the portion over 200 A)
A branch circuit supplies 18 A of continuous load and 6 A of noncontinuous load. Using 75 C terminations and copper THWN conductors, what is the smallest conductor permitted?
Answer: 10 AWG
Minimum ampacity = (18 x 1.25) + 6 = 22.5 + 6 = 28.5 A (210.19(A)(1)). From the 75 C column of Table 310.16, 12 AWG is 25 A (too small) and 10 AWG is 35 A, so 10 AWG is the smallest permitted. 8 AWG would be oversized.
Reference: NFPA 70, National Electrical Code, 2023, 210.19(A)(1) and Table 310.16
Type NM cable is run through bored holes in wood studs. What is the minimum distance from the nearest edge of the stud to the edge of the hole, if no steel plate is used for protection?
Answer: 1-1/4 inches
Section 300.4(A)(1) requires holes bored through wood framing members to be at least 1-1/4 in from the nearest edge of the member; otherwise the cable must be protected by a steel plate or bushing at least 1/16 in thick. Same distance applies to cables or raceways run parallel to framing members (300.4(D)).
Reference: NFPA 70, National Electrical Code, 2023, 300.4(A)(1)
What is the maximum height above the floor of the grip of the operating handle of the highest switch used as a general-use snap switch in a dwelling?
Answer: 6 feet 7 inches
Section 404.8(A) requires the grip of the operating handle of the highest switch, when in its highest position, to be not more than 2.0 m (6 ft 7 in) above the floor or working platform. Exceptions apply to busway disconnects and certain switch groups.
Reference: NFPA 70, National Electrical Code, 2023, 404.8(A)
A 3-phase, 460-volt, 25-hp motor has a full-load current of 34 amperes from Table 430.250. What is the minimum ampere rating of the motor disconnecting means?
Answer: 39.1 amperes
Section 430.110(A) requires a disconnecting means with an ampere rating of at least 115% of the motor's full-load current from the table: 34 x 1.15 = 39.1 A. 34 A omits the 115%, 42.5 A is the 125% conductor factor, and 59.5 A is the 175% fuse factor.
Reference: NFPA 70, National Electrical Code, 2023, 430.110(A) and Table 430.250
A 3-phase, 460-volt, 40-hp motor has a full-load current of 52 amperes from Table 430.250. What is the minimum ampacity of the branch circuit conductors?
Answer: 65 amperes
Section 430.22(A) requires conductors for a single continuous-duty motor to have an ampacity of at least 125% of motor full-load current from the table: 52 x 1.25 = 65 A. The nameplate current is not used to size the conductors (430.6(A)(1)). 91 A applies 175%.
Reference: NFPA 70, National Electrical Code, 2023, 430.22(A) and Table 430.250
In a Class I, Division 1 location, ignitable concentrations of flammable gases or vapors
Answer: can exist under normal operating conditions, or frequently because of maintenance, repair or leakage
Section 500.5(B)(1) defines a Class I, Division 1 location as one where ignitable concentrations of flammable gases or vapors can exist under normal operating conditions, or frequently because of repair or maintenance or leakage. Division 2 describes locations where such concentrations occur only under abnormal conditions (500.5(B)(2)).
Reference: NFPA 70, National Electrical Code, 2023, 500.5(B)(1)
Sources
- ICC: Wyoming Electrical Contractor/Trades Bulletin (8/2025, PDF) (opens in a new tab)
- Wyoming State Fire Marshal: Electrical licensing (opens in a new tab)
- 041-5 Wyo. Code R. § 3 (examinations and passing scores) (opens in a new tab)
Questions last verified October 29, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.