Wisconsin licensing exam

Wisconsin Utility Contractor Exam: Practice Test & Licensing Guide

The Wisconsin DSPS utility contractor exam: 100 open-book questions on water services, private water mains and building sewers under Wis. Stat. 145 and SPS 381 to 387, 2 hours, 70% to pass.

Questions
100
Time limit
2 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Utility Contractor Licensing and Law (Wis. Stat. 145, SPS 305)

A pipelayer registered under Wis. Stat. 145.07 (11) is working on a building sewer. Under SPS 305.98 (1), which of these may NOT provide the general supervision?

Requirements at a glance

AgencyWisconsin Department of Safety and Professional Services (DSPS)
ExperienceAge 18 or older; DSPS lists no apprenticeship or experience requirement
Exam100 questions, 2 hours, 70% to pass
Books allowedOne binder (Wis. Stat. 145, SPS 305, SPS 381 to 387, SPS 302, notes; PHCC binders accepted), NFPA 24 (2019) and the Wisconsin POWTS Inspector Handbook
Fees$65 at Pearson VUE ($30 at a DSPS site), plus the credential fee ($500 plus $10 application, 4-year term, renews March 31)

Contractors who install water services, private water mains, building sewers and private interceptor sewers from the street main to the foundation wall. Applicants must be at least 18.

How to get licensed, step by step

  1. Apply to DSPS

    Apply in LicensE for the utility contractor credential. DSPS issues exam instructions once your application is reviewed.

    Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)LicensE: apply for your credential (opens in a new tab)

  2. Schedule your exam

    Once your qualifications are met, DSPS sends an exam authorization. Schedule with Pearson VUE or, for electrical exams, a DSPS exam site. If you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.

    DSPS: trades exam information and fee schedule (opens in a new tab)Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)

  3. Take the exam

    100 questions, 2 hours, 70% to pass. Bring only the items DSPS lists; sticky notes, loose paper and removable tabs are not allowed.

    Wisconsin Admin. Code chapter SPS 382 (plumbing) (opens in a new tab)Wisconsin Statutes chapter 145 (plumbing) (opens in a new tab)DSPS permitted trades exam materials (PDF) (opens in a new tab)

  4. Results and licensing

    After you pass, wait 2 days, then submit your license application in LicensE. DSPS sends one exam authorization at a time, so a retake needs a new authorization. On two-part exams a failed part is retaken alone and all parts must be passed within 1 year.

    LicensE: apply for your credential (opens in a new tab)

How to prepare

  • Focus on water services, private water mains, building sewers and private interceptor sewers from the street main to the foundation wall (SPS 305.97 and SPS 382).
  • Wisconsin's plumbing code is its own (SPS 382 to 384), not the IPC or UPC. Learn the Wisconsin drain, vent and water sizing tables and the POWTS rules in SPS 383.
  • Every Wisconsin trades exam is open book, but DSPS limits what you can bring (a binder plus the listed books), and tabs must come with a bound book. Practice finding answers fast in your own binder.
  • DSPS publishes no content outline or topic weights, so our topic split is an estimate built from the reference lists DSPS prints. Counts and times come from DSPS's exam table.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the Wisconsin plumbing code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • One binder (PHCC binders are accepted) with Wis. Stat. chapter 145, SPS 305, SPS 381 to 387, SPS 302 and your notes
  • NFPA 24 (2019 edition)
  • Wisconsin POWTS Inspector Handbook

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Utility Contractor Licensing and Law (Wis. Stat. 145, SPS 305)14
Definitions and Standards (SPS 381)8
Building Sewers and Private Interceptor Sewers (SPS 382)16
Water Services and Private Water Mains (SPS 382 Subchapter IV)16
Materials, Piping and Joints (SPS 384)10
Storm and Clear-Water Drainage (SPS 382)10
Excavation, Trenching, Bedding and Backfill (SPS 382)10
Private Onsite Wastewater Treatment Systems (SPS 383)6
Plan Reading and Pipe Sizing10

Exam day details

  • Administered by the Wisconsin Department of Safety and Professional Services (DSPS); exams are given by Pearson VUE or at a DSPS exam site.
  • Fee: $65 at Pearson VUE ($30 at a DSPS exam site). The credential application fee is separate.
  • 100 questions in 2 hours (DSPS exam table, not checked against Pearson); open book; 70% to pass.
  • Wisconsin has its own plumbing code (SPS 382 to 384), not the International Plumbing Code. Our questions follow the Wisconsin text.
  • NFPA 13D, NFPA 24, the POWTS component manuals and the Multi-Purpose Piping Systems Design Manual are not freely readable, so our questions stay in SPS 381 to 387 and Wis. Stat. 145.
  • Open book: bring one binder (three-hole-punched printed notes and printed code), plus the other references DSPS lists for your exam. Loose paper, removable tabs, sticky notes and paperclips are not allowed; practice exams do not count as notes.
  • You can test at a Pearson VUE center or a DSPS exam site, but once you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
  • The passing score is 70%. For two-part exams you need 70% in each part, a failed part is retaken alone, and all parts must be passed within 1 year (SPS 305.09(6)).
  • DSPS sends one exam authorization at a time. After you pass, wait 2 days, then apply for the license in LicensE.
  • DSPS publishes no content outline or topic weights (SPS 305.09(5) says the exams are based on a job analysis), so our topic split is an estimate built from the reference lists DSPS prints.

Note: DSPS publishes the question counts, time limits and permitted references but no content outline or topic weights, so our topic split is an estimate. Counts come from DSPS's exam table and were not checked against Pearson.

Frequently asked questions

What does a Wisconsin utility contractor license cover?

Installing water services, private water mains, building sewers (sanitary and storm) and private interceptor sewers from the street main to the foundation wall (SPS 305.97).

Is there an experience requirement?

Applicants must be 18. DSPS lists no apprenticeship route, so the exam is how you qualify.

What can I bring into the exam?

One binder (Wis. Stat. 145, SPS 305, SPS 381 to 387, SPS 302 and notes; PHCC binders are accepted), NFPA 24 (2019) and the Wisconsin POWTS Inspector Handbook.

Free questions with answers

Show all 10 free questions and answers
  1. A pipelayer registered under Wis. Stat. 145.07 (11) is working on a building sewer. Under SPS 305.98 (1), which of these may NOT provide the general supervision?

    Answer: A licensed journeyman plumber

    SPS 305.98 (1) allows a pipelayer to work under the general supervision of a licensed utility contractor, a licensed master plumber or a licensed master plumber-restricted service. A journeyman plumber is not on that list.

    Reference: Wisconsin Administrative Code SPS 305, SPS 305.98 (1)

  2. A sewer serves three buildings on a commercial campus and is not part of the municipal sewer system. What is it called under SPS 381.01?

    Answer: A private interceptor main sewer

    SPS 381.01 defines a private interceptor main sewer as a sewer serving 2 or more buildings and not part of the municipal sewer system. A building sewer serves one building, and a public sewer is owned and controlled by a public authority.

    Reference: Wisconsin Administrative Code SPS 381, SPS 381.01 (definition of private interceptor main sewer)

  3. A private interceptor main sewer will be 10 inches in diameter. Which requirement in SPS 382.30 (4) (c) 5. applies to it?

    Answer: It must follow the design criteria of s. NR 110.13

    SPS 382.30 (4) (c) 4. applies the Table 382.30-3 fixture limits only to private interceptor main sewers 6 inches or less. Under subd. 5., sewers 8 inches or larger conform to the municipal-sewer design criteria in s. NR 110.13, and (12) (e) 2. repeats that for installation.

    Reference: Wisconsin Administrative Code SPS 382, SPS 382.30 (4) (c) 4., 5.

  4. A private water main 2 inches in diameter connects to a public water main. Under SPS 382.40 (4) (a) 1. a., where is the corporation cock installed?

    Answer: At the connection to the public water main

    A private water main 2 inches or smaller takes its corporation cock right at the public main connection. For 2-1/2 inch and larger mains the cock may be up to 8 feet from the connection, and one control valve may then serve as both corporation cock and curb stop.

    Reference: Wisconsin Administrative Code SPS 382, SPS 382.40 (4) (a) 1.

  5. How must a new private water main or water service be tested under SPS 382.21 (2) (e)?

    Answer: Proven watertight at working pressure or more, with potable water, before covering

    Paragraph (e) requires inspection before the piping is covered and a watertight test under water pressure not less than the working pressure, using water from a potable source. The overflow and low air pressure tests are for drain systems.

    Reference: Wisconsin Administrative Code SPS 382, SPS 382.21 (2) (e)

  6. A bell-and-spigot cast iron joint in a water supply system is leaded under SPS 384.40 (5) (a) 2. How is it made?

    Answer: Packed with treated paper rope and poured with lead to a depth of 2-1/2 inches

    SPS 384.40 (5) (a) 2. requires bell and spigot joints in water supply systems to be firmly packed with treated paper rope, with molten lead poured in one operation to a depth of 2-1/2 inches. Oakum or hemp with lead at least 1 inch deep is the drain and vent rule in subd. 1., and bituminous and cement joints are prohibited by SPS 384.40 (1) (c).

    Reference: Wisconsin Administrative Code SPS 384, SPS 384.40 (5) (a) 2.

  7. A street has a combined sanitary-storm sewer. Under SPS 382.36 (4) (b) 2., how may stormwater, clearwater and sanitary wastewater from a building be handled?

    Answer: They may be combined in the building sewer

    Stormwater and clearwater piping may not normally connect to a sanitary drain system, but where a combined sanitary-storm sewer system is available, the three may be combined in the building sewer. Gravity stormwater and clearwater drains still stay separate until the storm building drain unless the department approves (subd. 3.).

    Reference: Wisconsin Administrative Code SPS 382, SPS 382.36 (4) (b) 2.

  8. How much backfill cover must be over the top of a building sewer before the trench is wheel-loaded, under SPS 382.30 (11) (e) 4.?

    Answer: At least 36 inches

    At least 36 inches of backfill cover must be provided over the top of the pipe before the pipe trench is wheel-loaded. The 12 inch figure is the depth of the initial backfill layer.

    Reference: Wisconsin Administrative Code SPS 382, SPS 382.30 (11) (e) 4.

  9. After a governmental unit receives all required information and fees for a sanitary permit application, within how many days must it review and decide, per SPS 383.21 (3) (c)?

    Answer: 30 days

    A governmental unit shall review and make a determination on the submission within 30 days after receiving all required information and fees under sub. (2) (c). A denial must be given in writing with the reasons and appeal rights.

    Reference: Wisconsin Administrative Code SPS 383, SPS 383.21 (3) (c)

  10. A private interceptor main sewer will serve 520 drainage fixture units and is to be laid at 1/8 inch per foot. Using Table 382.30-3 (the 6 inch or smaller range), what is the smallest diameter that can be used?

    Answer: 6 inches

    At 1/8 inch per foot Table 382.30-3 allows 180 DFU for 4 inch, 390 for 5 inch and 700 for 6 inch pipe. 520 DFU exceeds 390, so 6 inches is the smallest listed size.

    Reference: Wisconsin Administrative Code SPS 382, SPS 382.30 (4) (c) 4.; Table 382.30-3

Sources

Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.