Wisconsin licensing exam

Wisconsin UDC Plumbing Inspector Exam: Practice Test & Licensing Guide

The Wisconsin DSPS Uniform Dwelling Code plumbing inspector exam: 100 open-book questions on dwelling plumbing under SPS 325 and the Wisconsin plumbing code (SPS 381 to 387), 3 hours, 70% to pass.

Questions
100
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10UDC Administration and Plumbing Inspector Credentials (SPS 305.63, SPS 320, Wis. Stat. 145)

A town hires a contract inspector to review plumbing plans and perform rough and final plumbing inspections at new one- and 2-family dwellings. Which certification satisfies SPS 305.63 for that plumbing work?

Requirements at a glance

AgencyWisconsin Department of Safety and Professional Services (DSPS)
ExperienceNo experience requirement or exam waiver listed by DSPS (SPS 305.63)
Exam100 questions, 3 hours, 70% to pass
Books allowedOne binder (Wis. Stat. 145, SPS 305, SPS 320 to 325, SPS 381 to 387, notes) and NFPA 13D (2019)
Fees$90 at Pearson VUE ($25 at a DSPS site), plus the credential fee ($40 plus $15 application, 24 CE hours, renews June 30)

Municipal and contract inspectors applying to DSPS for a UDC plumbing inspector credential (SPS 305.63). DSPS lists no experience requirement and no exam waiver; you apply, pay and pass.

How to get licensed, step by step

  1. Apply to DSPS

    Apply in LicensE for the UDC plumbing inspector credential, then pay and pass the exam.

    Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)LicensE: apply for your credential (opens in a new tab)

  2. Schedule your exam

    Once your qualifications are met, DSPS sends an exam authorization. Schedule with Pearson VUE or, for electrical exams, a DSPS exam site. If you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.

    DSPS: trades exam information and fee schedule (opens in a new tab)Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)

  3. Results and licensing

    After you pass, wait 2 days, then submit your license application in LicensE. DSPS sends one exam authorization at a time, so a retake needs a new authorization. On two-part exams a failed part is retaken alone and all parts must be passed within 1 year.

    LicensE: apply for your credential (opens in a new tab)

How to prepare

  • SPS 325.01 sends dwelling plumbing to the Wisconsin Plumbing Code (SPS 381 to 387), so learn drain, vent and water supply rules in SPS 382.
  • NFPA 13D is not freely readable, so our questions stay in the SPS text.
  • Every Wisconsin trades exam is open book, but DSPS limits what you can bring (a binder plus the listed books), and tabs must come with a bound book. Practice finding answers fast in your own binder.
  • DSPS publishes no content outline or topic weights, so our topic split is an estimate built from the reference lists DSPS prints. Counts and times come from DSPS's exam table.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the UDC (SPS 320 to 325) and the Wisconsin plumbing code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Wisconsin Uniform Dwelling Code: Wisconsin Admin. Code SPS 305 and SPS 320 to 325Essential

    Put these chapters in your binder. The UDC Appendix is sold by DSPS and is not freely readable.

    Read free: SPS 320 (opens in a new tab)

  • Wisconsin plumbing code: Wis. Stat. 145 and SPS 381 to 387Essential

    Wisconsin's plumbing code is its own, not the IPC. Put these chapters in your binder.

    Read free: SPS 382 (opens in a new tab)

Official reference list (as published by the testing agency)
  • One binder with Wis. Stat. chapter 145, SPS 305, SPS 320 to 325 and SPS 381 to 387 and your printed notes
  • NFPA 13D (2019 edition)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
UDC Administration and Plumbing Inspector Credentials (SPS 305.63, SPS 320, Wis. Stat. 145)10
Definitions and Plumbing Standard (SPS 381, SPS 325.01)10
Plan Review, Testing and Inspection (SPS 382.20 to 382.22)14
Drain, Waste and Vent Systems (SPS 382.30 to 382.35)24
Water Supply and Cross Connection Control (SPS 382.40 and 382.41)16
Plumbing Products (SPS 384) and Sanitation Facilities (SPS 325.02)14
Private Onsite Wastewater Treatment Systems (SPS 383 and 385)12

Exam day details

  • Administered by the Wisconsin Department of Safety and Professional Services (DSPS); exams are given by Pearson VUE or at a DSPS exam site.
  • Fee: $90 at Pearson VUE ($25 at a DSPS exam site). The credential application fee is separate.
  • 100 questions in 3 hours (DSPS exam table, not checked against Pearson); open book; 70% to pass.
  • SPS 325.01 requires dwelling plumbing to follow the Wisconsin Plumbing Code, chs. SPS 381 to 387.
  • Wisconsin has its own plumbing code (SPS 382 to 384), not the International Plumbing Code. Our questions follow the Wisconsin text.
  • NFPA 13D, NFPA 24, the POWTS component manuals and the Multi-Purpose Piping Systems Design Manual are not freely readable, so our questions stay in SPS 381 to 387 and Wis. Stat. 145.
  • Our questions follow the Wisconsin SPS text. The UDC Appendix, NFPA 13D and the international model codes are not freely readable, so they are not in our bank.
  • Open book: bring one binder (three-hole-punched printed notes and printed code), plus the other references DSPS lists for your exam. Loose paper, removable tabs, sticky notes and paperclips are not allowed; practice exams do not count as notes.
  • You can test at a Pearson VUE center or a DSPS exam site, but once you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
  • The passing score is 70%. For two-part exams you need 70% in each part, a failed part is retaken alone, and all parts must be passed within 1 year (SPS 305.09(6)).
  • DSPS sends one exam authorization at a time. After you pass, wait 2 days, then apply for the license in LicensE.
  • DSPS publishes no content outline or topic weights (SPS 305.09(5) says the exams are based on a job analysis), so our topic split is an estimate built from the reference lists DSPS prints.

Note: DSPS publishes the question counts, time limits and permitted references but no content outline or topic weights, so our topic split is an estimate. Counts come from DSPS's exam table and were not checked against Pearson.

Frequently asked questions

Is the UDC plumbing inspector exam based on the IPC?

No. SPS 325.01 requires dwelling plumbing to meet the Wisconsin Plumbing Code, SPS 381 to 387.

Can I skip the exam?

DSPS lists no exam waiver for the UDC plumbing inspector. You apply, pay and pass.

How much does it cost?

$90 at Pearson VUE or $25 at a DSPS exam site. The credential is $40 plus a $15 application fee.

Free questions with answers

Show all 10 free questions and answers
  1. A town hires a contract inspector to review plumbing plans and perform rough and final plumbing inspections at new one- and 2-family dwellings. Which certification satisfies SPS 305.63 for that plumbing work?

    Answer: Certified UDC-plumbing inspector (or a certified commercial plumbing inspector)

    SPS 305.63 (1) (b) 4. lets a certified UDC-plumbing inspector or certified commercial plumbing inspector inspect one- and 2-family dwellings for chs. SPS 325, 382 and 384. The UDC-construction credential is limited to chs. SPS 320 to 322, the HVAC credential to ch. SPS 323, and the soil erosion credential to s. SPS 321.125.

    Reference: Wis. Admin. Code SPS 305, SPS 305.63 (1) (b) 4.

  2. An inspector checks a drain stack that is about 40 feet tall and receives horizontal branches. Under SPS 381.01, a vent stack is a vertical vent that provides air for a drain stack of at least how many branch intervals?

    Answer: 5 branch intervals, each being 8 feet or more between horizontal branch connections

    SPS 381.01 (269) defines a vent stack as a vertical vent pipe that provides air for a drain stack of 5 or more branch intervals, and (35) defines a branch interval as a vertical measurement of 8 feet or more between the connections of horizontal branches to a drainage stack.

    Reference: Wis. Admin. Code SPS 381, SPS 381.01 (35), (269)

  3. A plumber has roughed in drain piping under a basement floor slab that will be poured tomorrow. Under SPS 320.10 (3) (f), when is the inspection of that piping made?

    Answer: As part of the basement floor area rough inspection, before the underfloor work is concealed

    SPS 320.10 (3) (f) 1. a. lists the basement floor area as a rough inspection category, and its Note says that inspection includes any underfloor plumbing, electrical or HVAC (along with interior drain tile and base course). Rough work must be inspected after it is constructed and before it is concealed.

    Reference: Wis. Admin. Code SPS 320, SPS 320.10 (3) (f) 1. a. and Note

  4. An inspector observes air tests on two systems: a sanitary building sewer and the drain and vent piping inside the dwelling. What gauge pressures apply, each held at least 15 minutes without adding air?

    Answer: 3 psi on the building sewer and 5 psi on the drain and vent piping

    SPS 382.21 (2) (b) 2. sets the building sewer air test at a uniform 3 psi held 15 minutes, while (2) (g) 2. sets the drain and vent air test at 5 psi (or enough to balance 10 inches of mercury) held 15 minutes. In both, no additional air is added during the hold.

    Reference: Wis. Admin. Code SPS 382, SPS 382.21 (2) (b) 2., (g) 2.

  5. A sump pump that discharges continuously at 15 gallons per minute is tied into a dwelling's drain system. Under SPS 382.30 (3), what drainage fixture unit load does it add?

    Answer: 30 dfu, because continuous flow counts 2 dfu for each gallon per minute (2 x 15)

    SPS 382.30 (3) (b) says continuous flow devices such as pumps, ejectors and air conditioning equipment are computed at 2 fixture units per gallon per minute: 2 x 15 = 30 dfu. The 1 dfu per gpm figure in (3) (a) 2. is for intermittent flow devices not listed in Table 382.30-1.

    Reference: Wis. Admin. Code SPS 382, SPS 382.30 (3) (a) 2. and (b)

  6. A water service enters a dwelling from a public main. Where does SPS 382.40 (4) (b) 3. place the building control valve?

    Answer: Inside the building, within 3 feet of developed length from the service entry

    SPS 382.40 (4) (b) 3. a. requires the building control valve inside the building, within 3 feet of developed length from the point where the water service first enters. The curb stop is a separate valve, located outside the building between the corporation cock and the property line under (4) (b) 2.

    Reference: Wis. Admin. Code SPS 382, SPS 382.40 (4) (b) 2. and 3. a.

  7. A dwelling's hot water fixture is 140 feet of developed length from the water heater, and an uncirculated branch of 30 feet serves it. Under SPS 382.40 (5) (b), what must the designer do?

    Answer: Provide circulation or self-regulating heat cable, and keep uncirculated piping to 25 feet or less

    SPS 382.40 (5) (b) requires a circulation system or self-regulating electric heating cable where the developed length of hot water piping to a fixture exceeds 100 feet. With circulation, no uncirculated hot water piping may exceed 25 feet of developed length, so the 30 foot branch is too long; heat cable must reach within 25 feet of each fixture.

    Reference: Wis. Admin. Code SPS 382, SPS 382.40 (5) (b) 1. and 2.

  8. A homeowner wants to install a composting toilet in a one-family dwelling. Which chapter does SPS 325.02 name as the one the facility must comply with?

    Answer: Chapter SPS 391

    SPS 325.02 says the design, construction, installation and maintenance of sanitation facilities and devices such as composting toilets, incinerating toilets and privies serving one- and 2-family dwellings must comply with ch. SPS 391. Plumbing for the dwelling generally falls under chs. SPS 381 to 387 by SPS 325.01.

    Reference: Wis. Admin. Code SPS 325, SPS 325.02

  9. A county plumbing inspector and a department plumbing reviewer disagree about how a requirement of ch. SPS 384 applies to a product. Under SPS 384.01 (2), which controls?

    Answer: The department's interpretation, which supersedes a differing one by a lower jurisdiction

    SPS 384.01 (2) says a department interpretation of the requirements in ch. SPS 384, and a department decision on their application, supersede any differing interpretation or decision by a lower level jurisdiction. The note says a department decision may be appealed under s. 101.02 (6) (e), Stats.

    Reference: Wis. Admin. Code SPS 384, SPS 384.01 (2) and Note

  10. A county receives a complete sanitary permit application, with all required information and fees, for a POWTS on private land. Within how long must the governmental unit review it and make a determination under SPS 383.21 (3)?

    Answer: 30 days after receiving all required information and fees

    SPS 383.21 (3) (c) requires a governmental unit to review and make a determination on a sanitary permit application within 30 days after it receives all the required information and fees. A permit may not be issued until plans are approved under (3) (a).

    Reference: Wis. Admin. Code SPS 383, SPS 383.21 (3) (c)

Sources

Questions last verified November 11, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.