Wisconsin licensing exam

Wisconsin Master Plumber Exam: Practice Test & Licensing Guide

The Wisconsin DSPS master plumber exam in two parts (110 and 132 questions): SPS 381 to 387, Wis. Stat. 145 and plumbing design. Open book, 4 hours per part, 70% in each part.

Questions
242
Time limit
8 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Intent, Basic Requirements and Administration (SPS 382 Subchapters I and II)

Under SPS 382.03 (3), when the department's interpretation of SPS 382 differs from a local inspector's interpretation, which one controls?

Requirements at a glance

AgencyWisconsin Department of Safety and Professional Services (DSPS)
Experience3 years of 1,000 hours as a Wisconsin journeyman plumber, or a civil or mechanical engineering degree
ExamPart 1: 110 questions and Part 2: 132 questions, 4 hours each, 70% in each part
Books allowedOne binder (Wis. Stat. 145, SPS 305, SPS 381 to 387 and others, notes), NFPA 13D, NFPA 24 (journeyman), POWTS manuals, the Multi-Purpose Piping Systems Design Manual and scale rulers
Fees$95 per part at Pearson VUE, plus the credential fee ($500 plus $20 application, 4-year term, renews March 31, 24 CE hours)

Plumbers applying to DSPS for a master license after 3 years of 1,000 hours as a Wisconsin journeyman, or with a civil or mechanical engineering degree.

How to get licensed, step by step

  1. Apply to DSPS

    Apply in LicensE with proof of your journeyman experience or degree. DSPS issues exam instructions once your qualifications are met.

    Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)LicensE: apply for your credential (opens in a new tab)

  2. Schedule your exam

    Once your qualifications are met, DSPS sends an exam authorization. Schedule with Pearson VUE or, for electrical exams, a DSPS exam site. If you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.

    DSPS: trades exam information and fee schedule (opens in a new tab)Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)

  3. Take the exam

    Part 1: 110 questions and Part 2: 132 questions, 4 hours each, 70% in each part. Bring only the items DSPS lists; sticky notes, loose paper and removable tabs are not allowed.

    Wisconsin Admin. Code chapter SPS 382 (plumbing) (opens in a new tab)Wisconsin Statutes chapter 145 (plumbing) (opens in a new tab)DSPS permitted trades exam materials (PDF) (opens in a new tab)

  4. Results and licensing

    After you pass, wait 2 days, then submit your license application in LicensE. DSPS sends one exam authorization at a time, so a retake needs a new authorization. On two-part exams a failed part is retaken alone and all parts must be passed within 1 year.

    LicensE: apply for your credential (opens in a new tab)

How to prepare

  • The master exam is longer and leans toward design, sizing and responsibility under Wis. Stat. 145.
  • Wisconsin's plumbing code is its own (SPS 382 to 384), not the IPC or UPC. Learn the Wisconsin drain, vent and water sizing tables and the POWTS rules in SPS 383.
  • The exam has two parts, each passed at 70%; a failed part is retaken alone and all parts must be passed within 1 year.
  • Every Wisconsin trades exam is open book, but DSPS limits what you can bring (a binder plus the listed books), and tabs must come with a bound book. Practice finding answers fast in your own binder.
  • DSPS publishes no content outline or topic weights, so our topic split is an estimate built from the reference lists DSPS prints. Counts and times come from DSPS's exam table.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the Wisconsin plumbing code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • One binder (PHCC binders are accepted) with Wis. Stat. chapter 145, SPS 305, SPS 381 to 387, Wis. Stat. 106, SPS 302, SPS 325 and your notes
  • NFPA 13D (2019 edition); NFPA 24 (2019 edition) on the journeyman list
  • POWTS component manuals (At-Grade Pressure Distribution, Holding Tank, In-Ground Soil Absorption, Mound, Pressure Distribution), the Multi-Purpose Piping Systems Design Manual and scale rulers

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Wisconsin Plumbing Licensing and Law (Wis. Stat. 145, SPS 305)12
Definitions and Standards (SPS 381)6
Intent, Basic Requirements and Administration (SPS 382 Subchapters I and II)8
Materials, Fixtures and Appliances (SPS 384)10
Drain and Vent Systems (SPS 382 Subchapter III)16
Water Supply and Distribution (SPS 382 Subchapter IV)16
Storm and Clear-Water Drainage, Special Systems and Installation (SPS 382.36, 382 Subchapters V and VI)8
Private Onsite Wastewater Treatment Systems (SPS 383 and 385)8
Pipe Sizing and Plan Reading16

Exam day details

  • Administered by the Wisconsin Department of Safety and Professional Services (DSPS); exams are given by Pearson VUE or at a DSPS exam site.
  • Fee: $95 per part at Pearson VUE. The credential application fee is separate.
  • Part 1 has 110 questions and Part 2 has 132, with 4 hours for each part (DSPS exam table, not checked against Pearson). Open book; 70% in each part.
  • Wisconsin has its own plumbing code (SPS 382 to 384), not the International Plumbing Code. Our questions follow the Wisconsin text.
  • NFPA 13D, NFPA 24, the POWTS component manuals and the Multi-Purpose Piping Systems Design Manual are not freely readable, so our questions stay in SPS 381 to 387 and Wis. Stat. 145.
  • Open book: bring one binder (three-hole-punched printed notes and printed code), plus the other references DSPS lists for your exam. Loose paper, removable tabs, sticky notes and paperclips are not allowed; practice exams do not count as notes.
  • You can test at a Pearson VUE center or a DSPS exam site, but once you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
  • The passing score is 70%. For two-part exams you need 70% in each part, a failed part is retaken alone, and all parts must be passed within 1 year (SPS 305.09(6)).
  • DSPS sends one exam authorization at a time. After you pass, wait 2 days, then apply for the license in LicensE.
  • DSPS publishes no content outline or topic weights (SPS 305.09(5) says the exams are based on a job analysis), so our topic split is an estimate built from the reference lists DSPS prints.

Note: DSPS publishes the question counts, time limits and permitted references but no content outline or topic weights, so our topic split is an estimate. Counts come from DSPS's exam table and were not checked against Pearson.

Frequently asked questions

How many questions are on the Wisconsin master plumber exam?

Part 1 has 110 questions and Part 2 has 132, each in 4 hours, according to DSPS's exam table.

What is the passing score?

70% in each part. A failed part is retaken alone, and all parts must be passed within 1 year.

Which code does the exam use?

Wisconsin's plumbing code (SPS 382 to 384) with Wis. Stat. chapter 145 and NFPA 13D (2019), not the IPC.

Free questions with answers

Show all 10 free questions and answers
  1. Under SPS 382.03 (3), when the department's interpretation of SPS 382 differs from a local inspector's interpretation, which one controls?

    Answer: The department's interpretation supersedes the differing interpretation of the lower level jurisdiction

    SPS 382.03 (3) says a department interpretation or decision supersedes a differing one by a lower level jurisdiction. A department decision can be appealed under s. 101.02 (6) (e), Stats.

    Reference: Wisconsin Administrative Code, SPS 382.03 (3)

  2. Under SPS 381.01 (205), which vent permits additional circulation of air in or between drain and vent systems?

    Answer: A relief vent

    SPS 381.01 (205) defines a relief vent as a vent which permits additional circulation of air in or between drain and vent systems. A vent header (268) joins 2 or more stack vents or vent stacks and extends to the outside air.

    Reference: Wisconsin Administrative Code, SPS 381.01 (205)

  3. A building sewer is pressurized by a sewage ejector (not a grinder pump). Under SPS 382.30 (4) (b) 2., what is its minimum diameter?

    Answer: 2 inches

    SPS 382.30 (4) (b) 2. b. sets pressurized building sewers at not less than 2 inches for sewage ejectors and sewage pumps and 1-1/4 inches for sewage grinder pumps; subd. 2. a. also requires a minimum flow velocity of 2 feet per second and compliance with the manufacturer's recommendations.

    Reference: Wisconsin Administrative Code, SPS 382.30 (4) (b) 2.

  4. A hot water circulation system serves a building. What is the maximum developed length of uncirculated hot water distribution piping under SPS 382.40 (5) (b) 1.?

    Answer: 25 feet

    With a circulation system used to maintain temperature, no uncirculated hot water piping may exceed 25 feet developed length. The 100 foot figure is the trigger for needing circulation in the first place.

    Reference: Wisconsin Administrative Code, SPS 382.40 (5) (b) 1.

  5. What minimum flow pressure at the outlet must water supply systems be designed to provide at fixture supplies in general, under SPS 382.40 (7) (d) 1.?

    Answer: 8 psig

    The general design minimum is 8 psig of flow pressure, with higher values for specific fixtures: 15 psig for siphonic and washdown urinals and washdown or siphonic flushometer water closets, 20 for one piece tank type water closets and pressure balance or thermostatic mixing valves, and 25 for blowout urinals and water closets.

    Reference: Wisconsin Administrative Code, SPS 382.40 (7) (d) 1.

  6. Stormwater plumbing systems upstream of detention must be designed for at minimum what storm event under SPS 382.36 (3) (a)?

    Answer: The 10-year, 24-hour storm event

    Plumbing upstream of detention is designed for the 10-year, 24-hour storm. Volume analysis uses a minimum two-year, 24-hour storm and must avoid property damage at the 100-year, 24-hour Type II event under sub. (5) (b).

    Reference: Wisconsin Administrative Code, SPS 382.36 (3) (a)

  7. A master plumber's continuing education course is attended for 100 minutes, and credit is given in 30-minute increments. How much credit does SPS 305.08 (1) (c) allow?

    Answer: 1.5 hours, since credit in other increments rounds down to the next half hour

    Thirty minutes equal 0.5 hour of credit, and credit for other increments is rounded down to the next half hour. 100 minutes = 3 x 30 + 10 minutes, so 3 x 0.5 = 1.5 hours.

    Reference: Wisconsin Administrative Code, SPS 305.08 (1) (c)

  8. What lead limit applies to the wetted surfaces of pipes, pipe fittings, plumbing fittings and fixtures under the SPS 381.01 (141) definition of lead-free?

    Answer: A weighted average of not more than 0.25 percent lead

    The weighted average of lead content on wetted surfaces may not exceed 0.25 percent, while solder and flux may not exceed 0.2 percent. SPS 384.30 (1m) (d) gives the area-weighted calculation method.

    Reference: Wisconsin Administrative Code, SPS 381.01 (141)

  9. Gravity flow piping between POWTS components is being pitched under SPS 383.43 (8) (a) 2. What flow velocity must the pitch produce?

    Answer: A computed velocity of at least one foot per second when flowing half full

    Gravity piping between components needs a computed velocity of at least 1 foot per second at half-full flow. The 2 fps figure applies to pressurization equipment and piping upstream of an in situ soil component.

    Reference: Wisconsin Administrative Code, SPS 383.43 (8) (a) 2.

  10. A paved parking lot of 20,000 square feet serves as a stormwater detention area at the maximum design depth allowed by SPS 382.36 (6) (g) 2. (no stricter local ordinance). About how many gallons can it detain? (7.48 gallons per cubic foot.)

    Answer: 74,800 gallons

    SPS 382.36 (6) (g) 2. limits paved surfaces or parking lots used as detention areas to a design depth of 6 inches unless local ordinance limits it further. Volume = 20,000 sq ft x 0.5 ft = 10,000 cubic feet; 10,000 x 7.48 = 74,800 gallons. 10,000 is the cubic feet before conversion, 897,600 uses 6 feet instead of 6 inches, and 6,233 divides by 12 twice.

    Reference: Wisconsin Administrative Code, SPS 382.36 (6) (g) 2.