Wisconsin licensing exam

Wisconsin Commercial Plumbing Inspector Exam: Practice Test & Licensing Guide

The Wisconsin DSPS commercial plumbing inspector exam in two parts (82 and 96 questions): the Wisconsin plumbing code, SPS 381 to 387 and Wis. Stat. 145. Open book, 3 hours per part, 70% in each part.

Questions
178
Time limit
6 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Plan Review, Testing and Inspection (SPS 382.20 to 382.22)

A registration form for a reduced pressure principle assembly is submitted to the department. Which item is NOT one of the items SPS 382.20 (13) (b) requires on the form?

Requirements at a glance

AgencyWisconsin Department of Safety and Professional Services (DSPS)
ExperienceNo experience requirement to sit; exam waived for a current Wisconsin Master Plumber or Journeyman Plumber (SPS 305.625)
ExamPart 1: 82 questions and Part 2: 96 questions, 3 hours each, 70% in each part
Books allowedOne binder (Wis. Stat. 106 and 145, SPS 302, 305, 325, 381 to 387, notes), NFPA 13D and NFPA 24 (2019), POWTS component manuals and the Multi-Purpose Piping Systems Design Manual
Fees$90 per part at Pearson VUE, plus the credential fee ($40 plus $15 application, 24 CE hours, renews June 30)

Inspectors applying to DSPS for a commercial plumbing inspector credential (SPS 305.625), including those who inspect plumbing for cities of the first to third class. There is no experience requirement to sit the exam.

How to get licensed, step by step

  1. Apply to DSPS

    Apply in LicensE for the commercial plumbing inspector credential, then pay and pass both parts.

    Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)LicensE: apply for your credential (opens in a new tab)

  2. Schedule your exam

    Once your qualifications are met, DSPS sends an exam authorization. Schedule with Pearson VUE or, for electrical exams, a DSPS exam site. If you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.

    DSPS: trades exam information and fee schedule (opens in a new tab)Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)

  3. Take the exam

    Part 1: 82 questions and Part 2: 96 questions, 3 hours each, 70% in each part. Bring only the items DSPS lists; sticky notes, loose paper and removable tabs are not allowed.

    Wisconsin Admin. Code chapter SPS 382 (plumbing) (opens in a new tab)Wisconsin Statutes chapter 145 (plumbing) (opens in a new tab)DSPS permitted trades exam materials (PDF) (opens in a new tab)

  4. Results and licensing

    After you pass, wait 2 days, then submit your license application in LicensE. DSPS sends one exam authorization at a time, so a retake needs a new authorization. On two-part exams a failed part is retaken alone and all parts must be passed within 1 year.

    LicensE: apply for your credential (opens in a new tab)

How to prepare

  • Expect plan review, testing and inspection rules (SPS 382.20 to 382.22) alongside drain, vent, water supply and POWTS content.
  • Wisconsin's plumbing code is its own (SPS 382 to 384), not the IPC or UPC. Learn the Wisconsin drain, vent and water sizing tables and the POWTS rules in SPS 383.
  • The exam has two parts, each passed at 70%; a failed part is retaken alone and all parts must be passed within 1 year.
  • Every Wisconsin trades exam is open book, but DSPS limits what you can bring (a binder plus the listed books), and tabs must come with a bound book. Practice finding answers fast in your own binder.
  • DSPS publishes no content outline or topic weights, so our topic split is an estimate built from the reference lists DSPS prints. Counts and times come from DSPS's exam table.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the Wisconsin plumbing code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • One binder with Wis. Stat. chapters 106 and 145, SPS 302, SPS 305, SPS 325, SPS 381 to 387 and your printed notes
  • NFPA 13D and NFPA 24 (2019 editions), the POWTS component manuals and the Multi-Purpose Piping Systems Design Manual

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Commercial Plumbing Inspector Credentials and Law (SPS 305.625, Wis. Stat. 145)8
Definitions and Basic Plumbing Principles (SPS 381, SPS 382.10)8
Plan Review, Testing and Inspection (SPS 382.20 to 382.22)10
Drain and Vent Systems (SPS 382.30 to 382.35)14
Stormwater, Clearwater, Sanitation Facilities and Discharge (SPS 382.36 to 382.38)10
Water Supply and Cross Connection Control (SPS 382.40 and 382.41)12
Special Installations, Hangers and Treatment Standards (SPS 382.50 to 382.70)8
Plumbing Products (SPS 384)10
Private Onsite Wastewater Treatment Systems (SPS 383 and 385)10
Pipe Sizing and Plan Reading10

Exam day details

  • Administered by the Wisconsin Department of Safety and Professional Services (DSPS); exams are given by Pearson VUE or at a DSPS exam site.
  • Fee: $90 per part at Pearson VUE ($25 per part at a DSPS exam site). The credential application fee is separate.
  • Part 1 has 82 questions and Part 2 has 96, with 3 hours for each part (DSPS exam table, not checked against Pearson). Open book; 70% in each part.
  • The exam is waived (SPS 305.625) if you currently hold a Wisconsin Master Plumber or Journeyman Plumber license.
  • Wisconsin has its own plumbing code (SPS 382 to 384), not the International Plumbing Code. Our questions follow the Wisconsin text.
  • NFPA 13D, NFPA 24, the POWTS component manuals and the Multi-Purpose Piping Systems Design Manual are not freely readable, so our questions stay in SPS 381 to 387 and Wis. Stat. 145.
  • Open book: bring one binder (three-hole-punched printed notes and printed code), plus the other references DSPS lists for your exam. Loose paper, removable tabs, sticky notes and paperclips are not allowed; practice exams do not count as notes.
  • You can test at a Pearson VUE center or a DSPS exam site, but once you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
  • The passing score is 70%. For two-part exams you need 70% in each part, a failed part is retaken alone, and all parts must be passed within 1 year (SPS 305.09(6)).
  • DSPS sends one exam authorization at a time. After you pass, wait 2 days, then apply for the license in LicensE.
  • DSPS publishes no content outline or topic weights (SPS 305.09(5) says the exams are based on a job analysis), so our topic split is an estimate built from the reference lists DSPS prints.

Note: DSPS publishes the question counts, time limits and permitted references but no content outline or topic weights, so our topic split is an estimate. Counts come from DSPS's exam table and were not checked against Pearson.

Frequently asked questions

How is the commercial plumbing inspector exam structured?

Two parts, 82 and 96 questions, 3 hours each. You need 70% in each part, and a failed part is retaken alone.

Can I skip the exam?

Yes, if you currently hold a Wisconsin Master Plumber or Journeyman Plumber license.

Which code does it use?

Wisconsin's plumbing code (SPS 381 to 387) with Wis. Stat. chapter 145, not the IPC.

Free questions with answers

Show all 10 free questions and answers
  1. A registration form for a reduced pressure principle assembly is submitted to the department. Which item is NOT one of the items SPS 382.20 (13) (b) requires on the form?

    Answer: The test date and name of the tester who will conduct the first annual test

    SPS 382.20 (13) (b) lists the facility name and address, the location inside the building, a description with size, model, serial number and manufacturer, and the owner or agent's name and contact information. Tester information is not on the registration form.

    Reference: Wis. Admin. Code SPS 382, SPS 382.20 (13) (b)

  2. A first class city has a certified supervisor overseeing plumbing inspections. An employee under that supervisor inspects plumbing for dwellings under ch. SPS 325 only. According to SPS 305.625 (1) (b) 2., which certification satisfies the requirement for that employee?

    Answer: Commercial plumbing inspector or UDC-plumbing inspector certification

    SPS 305.625 (1) (b) 2. allows an employee inspecting for the purpose of ch. SPS 325 to hold either a commercial plumbing inspector certification or a UDC-plumbing inspector certification under SPS 305.63. The commercial building certification is for chs. SPS 361 to 366.

    Reference: Wis. Admin. Code SPS 305, SPS 305.625 (1) (b) 2.

  3. A drain pipe runs horizontally under the basement floor of a store, below the lowest fixture, and leaves the fully enclosed part of the building. Where does the building drain end and the building sewer begin under SPS 381.01 (39) and (44)?

    Answer: At the point where the piping leaves the fully enclosed portion of the building

    SPS 381.01 (39) defines the building drain as horizontal piping within or under the fully enclosed portion of the building, and (44) defines the building sewer as the part not within or under it that conveys discharge to the sewer, POWTS or other point. The change occurs where the piping leaves the enclosed portion.

    Reference: Wis. Admin. Code SPS 381, SPS 381.01 (39), (44)

  4. A sewage ejector will lift waste from a basement toilet room and discharge through a pressurized building sewer. Under SPS 382.30 (4) (b) 2., what is the smallest permitted diameter for that pressurized sewer if the unit is a standard (non-grinder) sewage pump or ejector?

    Answer: 2 inches

    SPS 382.30 (4) (b) 2. b. requires pressurized building sewers to be at least 2 inches for sewage ejectors and sewage pumps, and 1-1/4 inches only for sewage grinder pumps. The sewer must also hold a velocity of at least 2 feet per second.

    Reference: Wis. Admin. Code SPS 382, SPS 382.30 (4) (b) 2.

  5. For stormwater volume analysis, SPS 382.36 (5) (b) calls for a minimum design storm and a check storm. Which pair is correct?

    Answer: A minimum 2-year, 24-hour storm, with no property damage at the 100-year, 24-hour storm (Type II distribution)

    SPS 382.36 (5) (b) bases volume on an analysis for at least a two-year, 24-hour storm and requires the design to avoid property damage at the 100-year, 24-hour storm with a Type II distribution. The 10-year, 24-hour figure is the peak-flow basis for piping upstream of detention in sub. (3) (a).

    Reference: Wis. Admin. Code SPS 382, SPS 382.36 (5) (b)

  6. A designer checks flow pressure at the outlet of a fixture supply serving a one-piece tank-type water closet. Under SPS 382.40 (7) (d) 1. b., what is the minimum flow pressure?

    Answer: 20 psig

    SPS 382.40 (7) (d) 1. gives a general minimum of 8 psig at fixture supply outlets, 15 psig for siphonic and washdown urinals, washdown closets, siphonic flushometer closets and campsite hose connections, 20 psig for one-piece tank-type closets, pressure balance valves and thermostatic mixing valves, and 25 psig for blowout urinals and closets.

    Reference: Wis. Admin. Code SPS 382, SPS 382.40 (7) (d) 1.

  7. When sizing hangers for drain piping under SPS 382.60 (1) (a), how must the pipe be considered?

    Answer: As full of water

    SPS 382.60 (1) (a) requires hangers, anchors and supports to be strong enough to support the piping and its contents, and drain piping is considered as being full of water. Underground piers may be concrete, masonry, plastic or pressure-treated wood.

    Reference: Wis. Admin. Code SPS 382, SPS 382.60 (1) (a)

  8. A product approval was issued by the department in 2023 under SPS 384.10 (2). When does that approval expire?

    Answer: At the end of the 60th month after the date of issuance

    SPS 384.10 (2) (h) says approvals issued after November 1, 1985 expire at the end of the 60th month after issuance. The 30-month period in (g) applied to approvals issued before November 1, 1985. A modified product also voids the approval under (f) unless it is reviewed and reaffirmed.

    Reference: Wis. Admin. Code SPS 384, SPS 384.10 (2) (h)

  9. A POWTS is to be built on state-owned property. Under SPS 383.21 (2) (b) 2., where is the sanitary permit application submitted?

    Answer: To the department

    SPS 383.21 (2) (b) 2. directs sanitary permit applications for a POWTS on state-owned property to the department rather than the local governmental unit. All other applications go to the governmental unit where the POWTS is or will be located.

    Reference: Wis. Admin. Code SPS 383, SPS 383.21 (2) (b)

  10. A plan shows a drain serving fixtures totaling 18 drainage fixture units plus a sump pump that discharges continuously at 12 gallons per minute into the same drain. Using SPS 382.30 (3) (b), what total drainage load must be used for sizing that drain?

    Answer: 42 dfu

    Continuous-flow devices are figured at 2 dfu per gpm: 12 gpm x 2 = 24 dfu. Adding the 18 dfu of fixtures gives 18 + 24 = 42 dfu. Using 1 dfu per gpm (the intermittent-flow rule) would give 30 dfu, and leaving out the fixtures gives 24 dfu.

    Reference: Wis. Admin. Code SPS 382, SPS 382.30 (3) (b)

Sources

Questions last verified November 11, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.