Wisconsin licensing exam

Wisconsin Residential Master Electrician Exam: Practice Test & Licensing Guide

The Wisconsin DSPS residential master electrician exam: 50 open-book questions on the 2023 NEC, dwelling load calculations and SPS 316, 4 hours, 70% to pass.

Questions
50
Time limit
4 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Electrical Theory and Calculations

A new Wisconsin dwelling has 2,400 sq ft of floor area under SPS 316.220. Loads: general lighting at 3 VA per sq ft; two small-appliance circuits and one laundry circuit at 1,500 VA each; one 14 kW household range; a 5,500 W dryer on its own circuit; four fastened-in-place appliances (dishwasher 1,200 VA, disposal 800 VA, water heater 4,500 VA, compactor 1,000 VA); and 6,000 VA of electric baseboard heat. Using the standard method, what is the calculated service load in amperes at 240 volts?

Requirements at a glance

AgencyWisconsin Department of Safety and Professional Services (DSPS)
ExperienceSee DSPS for residential master requirements
Exam50 questions, 4 hours, 70% to pass
Books allowedOne binder (SPS 305, SPS 316, printed notes), the 2023 NEC codebook or handbook, and up to two bound reference books
Fees$95 at Pearson VUE ($30 at a DSPS site) per exam, plus the credential application fee; residential licenses need 18 CE hours

Electricians applying to DSPS for a residential master license to plan and supervise one- and two-family dwelling wiring.

How to get licensed, step by step

  1. Apply to DSPS

    Apply in LicensE for the residential master electrician credential. DSPS issues exam instructions once your qualifications are met.

    Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)LicensE: apply for your credential (opens in a new tab)

  2. Schedule your exam

    Once your qualifications are met, DSPS sends an exam authorization. Schedule with Pearson VUE or, for electrical exams, a DSPS exam site. If you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.

    DSPS: trades exam information and fee schedule (opens in a new tab)Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)

  3. Take the exam

    50 questions, 4 hours, 70% to pass. Bring only the items DSPS lists; sticky notes, loose paper and removable tabs are not allowed.

    Wisconsin Admin. Code chapter SPS 316 (electrical) (opens in a new tab)DSPS permitted trades exam materials (PDF) (opens in a new tab)

  4. Results and licensing

    After you pass, wait 2 days, then submit your license application in LicensE. DSPS sends one exam authorization at a time, so a retake needs a new authorization. On two-part exams a failed part is retaken alone and all parts must be passed within 1 year.

    LicensE: apply for your credential (opens in a new tab)

How to prepare

  • Practice dwelling load calculations (the standard and optional methods) and the licensing and supervision rules in SPS 305 and SPS 316.
  • The exam uses the 2023 NEC. SPS 316.007 adopts it, and Wisconsin's changes are in SPS 316.080 and following: know where SPS 316 differs from the model NEC.
  • Put SPS 305 and SPS 316 in your binder with three-hole-punched notes, and tab your NEC with tabs that come with the bound book.
  • Every Wisconsin trades exam is open book, but DSPS limits what you can bring (a binder plus the listed books), and tabs must come with a bound book. Practice finding answers fast in your own binder.
  • DSPS publishes no content outline or topic weights, so our topic split is an estimate built from the reference lists DSPS prints. Counts and times come from DSPS's exam table.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC and SPS 316. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • One binder with Wis. Admin. Code SPS 305 and SPS 316 and your printed notes
  • 2023 National Electrical Code (NEC) codebook or handbook; SPS 316.007 adopts the 2023 NEC, and Wisconsin changes are in SPS 316.080 and following
  • Up to two printed, bound reference books (for example Ugly's, Ferm's Fast Finder, Tom Henry or Mike Holt series)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Electrical Theory and Calculations14
General Requirements and Definitions (NEC Articles 90 to 110)6
Wiring and Protection (NEC Chapter 2)18
Wiring Methods and Materials (NEC Chapter 3)16
Equipment for General Use (NEC Chapter 4)14
Special Occupancies, Equipment and Conditions (NEC Chapters 5 to 7)8
Wisconsin Electrical Code and Licensing (SPS 316 and SPS 305)24

Exam day details

  • Administered by the Wisconsin Department of Safety and Professional Services (DSPS); exams are given by Pearson VUE or at a DSPS exam site.
  • Fee: $95 at Pearson VUE ($30 at a DSPS exam site). The credential application fee is separate.
  • 50 questions in 4 hours (DSPS exam table); open book; 70% to pass.
  • Open book: bring one binder (three-hole-punched printed notes and printed code), plus the other references DSPS lists for your exam. Loose paper, removable tabs, sticky notes and paperclips are not allowed; practice exams do not count as notes.
  • You can test at a Pearson VUE center or a DSPS exam site, but once you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
  • The passing score is 70%. For two-part exams you need 70% in each part, a failed part is retaken alone, and all parts must be passed within 1 year (SPS 305.09(6)).
  • DSPS sends one exam authorization at a time. After you pass, wait 2 days, then apply for the license in LicensE.
  • DSPS publishes no content outline or topic weights (SPS 305.09(5) says the exams are based on a job analysis), so our topic split is an estimate built from the reference lists DSPS prints.

Note: DSPS publishes the question counts, time limits and permitted references but no content outline or topic weights, so our topic split is an estimate. Counts come from DSPS's exam table and were not checked against Pearson.

Frequently asked questions

How many questions are on the Wisconsin residential master electrician exam?

50 questions in 4 hours, open book, with 70% to pass (DSPS exam table).

Which references can I bring?

One binder (SPS 305, SPS 316 and printed notes), a 2023 NEC codebook or handbook, and up to two bound reference books.

How much does it cost?

$95 at Pearson VUE or $30 at a DSPS exam site.

Free questions with answers

Show all 10 free questions and answers
  1. A new Wisconsin dwelling has 2,400 sq ft of floor area under SPS 316.220. Loads: general lighting at 3 VA per sq ft; two small-appliance circuits and one laundry circuit at 1,500 VA each; one 14 kW household range; a 5,500 W dryer on its own circuit; four fastened-in-place appliances (dishwasher 1,200 VA, disposal 800 VA, water heater 4,500 VA, compactor 1,000 VA); and 6,000 VA of electric baseboard heat. Using the standard method, what is the calculated service load in amperes at 240 volts?

    Answer: 133 A

    Lighting 7,200 + small appliance 3,000 + laundry 1,500 = 11,700 VA; Table 220.45 takes the first 3,000 at 100% and the rest at 35%: 3,000 + 3,045 = 6,045 VA. Range: Column C gives 8 kW, plus 5% for each kW over 12 (2 kW = 10%) = 8,800 VA. The dryer uses its 5,500 VA nameplate (more than 5,000). The four fastened-in-place appliances total 7,500 VA at 75% (220.53) = 5,625 VA. Heat is 6,000 VA at 100%. Sum = 6,045 + 8,800 + 5,500 + 5,625 + 6,000 = 31,970 VA; 31,970 / 240 = 133.2 A. 141 A skips the 75% factor, 130 A uses 8 kW for the range without the Note 1 increase, and 157 A skips the lighting demand factor. (SPS 316.220 only sets how floor area is measured.)

    Reference: NEC 2023, 220.41, Table 220.45, 220.51, 220.52, 220.53, 220.54 and Table 220.55

  2. Two 1,500-watt baseboard heaters run 6 hours a day for 30 days. At $0.14 per kilowatt-hour, what is the electricity cost?

    Answer: $75.60

    Energy in kWh is power times hours. Total power is 3 kW; 3 x 6 hours = 18 kWh per day; 18 x 30 = 540 kWh; 540 x $0.14 = $75.60. $25.20 prices one heater for 30 days at 4 hours a day, $37.80 prices only one heater, and $151.20 doubles the correct total.

    Reference: NEC 2023, Electrical theory (power and energy)

  3. Six AWG THHN copper conductors (90 degrees C insulation) supply a 50-ampere circuit. The breaker's terminals are not marked with a temperature rating. What is the highest ampacity that may be used for these conductors at the termination? (Table 310.16: 6 AWG is 55 A at 60 degrees C, 65 A at 75 degrees C and 75 A at 90 degrees C.)

    Answer: 55 amperes

    Equipment rated 100 A or less with unmarked terminals is evaluated at 60 degrees C, so the 60-degree column applies even though the insulation is rated 90 degrees: 55 A for 6 AWG copper. The 90-degree value (75 A) may be used only for adjustment and correction, not at the terminal. 65 A would need terminals listed for 75 degrees C. 50 A is the breaker rating, not the conductor limit.

    Reference: NEC 2023, 110.14(C)(1) and Table 310.16

  4. What is the minimum number of 20-ampere small-appliance branch circuits required for the kitchen countertop receptacles of a new dwelling?

    Answer: Two

    At least two 20-ampere small-appliance branch circuits are required for the receptacle outlets in the kitchen, pantry, breakfast room and dining room, and the countertop receptacles must be served by them. The same two circuits are the ones counted at 1,500 VA each in the load calculation under 220.52(A). One circuit would be overloaded, and the code does not require three or four.

    Reference: NEC 2023, 210.11(C)(1) and 210.52(B)(1)

  5. A 120/240-volt service drop crosses a house roof that has a slope of 6 inches in 12 inches. The conductors are not within the overhang area. What is the minimum clearance above the roof surface?

    Answer: 3 feet

    The basic clearance over a roof is 8 ft 6 in. (230.24(A)). Exception No. 2 reduces it to 3 feet where the voltage does not exceed 300 volts between conductors and the roof slope is 4 in 12 or greater. A 6 in 12 roof qualifies. 18 inches is the further reduction for conductors at the overhang that end at a through-the-roof raceway, 8 feet was the general roof clearance in older editions such as the 2017 NEC, and 10 feet is a ground clearance from 230.24(B).

    Reference: NEC 2023, 230.24(A) Exception No. 2

  6. A one-family dwelling has a 150-ampere, 120/240-volt single-phase service. Using the dwelling-service rule that allows 83% of the service rating, what is the smallest copper THWN service conductor (75 degrees C column: 2 AWG 115 A, 1 AWG 130 A, 1/0 150 A, 2/0 175 A)?

    Answer: 1 AWG

    For a one-family dwelling's 120/240-volt single-phase service rated 100 through 400 amperes, 310.12 permits conductors with ampacity not less than 83% of the service rating: 150 x 0.83 = 124.5 A. In the 75-degree C copper column, 2 AWG (115 A) falls short and 1 AWG (130 A) is the first size that meets 124.5 A. 1/0 AWG (150 A) is what the full-ampacity rule would give, and 2/0 AWG is oversized.

    Reference: NEC 2023, 310.12 and Table 310.16

  7. A run of EMT will hold four 10 AWG THHN and three 12 AWG THHN conductors. Using Chapter 9 areas (10 AWG THHN 0.0243 sq in; 12 AWG THHN 0.0133 sq in) and the 40% fill areas of EMT (1/2 inch 0.122 sq in; 3/4 inch 0.213 sq in; 1 inch 0.346 sq in; 1-1/4 inch 0.598 sq in), what is the smallest trade size?

    Answer: 3/4 inch

    More than two conductors are limited to 40% fill (Table 1). Conductor area = 4 x 0.0243 + 3 x 0.0133 = 0.0972 + 0.0399 = 0.1371 sq in. 1/2 inch EMT allows only 0.122 sq in, which is too small, while 3/4 inch allows 0.213 sq in, which fits. 1 inch and 1-1/4 inch would also work but are larger than the minimum.

    Reference: NEC 2023, Chapter 9, Table 1, Table 4 (EMT) and Table 5

  8. A central air conditioner nameplate shows a minimum circuit ampacity of 24 amperes and a maximum overcurrent protective device of 40 amperes. Which statement about the branch circuit is correct?

    Answer: The conductors need at least 24 amperes of ampacity and the breaker may not exceed 40 amperes

    The nameplate minimum circuit ampacity is already the conductor sizing value (it includes the 125% factor), so 24 amperes of ampacity is enough. The 40-ampere figure is a maximum: a smaller breaker, such as 30 amperes, may be used if it carries the starting current. Article 440 Part III is a specific exception to the small-conductor rules of 240.4, so the breaker may exceed the conductor's ampacity. Adding another 125% double-counts the factor.

    Reference: NEC 2023, 440.4(B) and 440.22(A)

  9. At a dwelling's permanently installed in-ground pool, how far horizontally from the inside walls of the pool must a wall switch be mounted, unless a solid fence or barrier separates them?

    Answer: At least 5 feet

    Section 680.22(C) requires switches, including time clocks, to be at least 1.5 meters (5 feet) horizontally from the inside walls of the pool, unless a permanent barrier separates them from the pool. The 3, 10 and 20-foot figures are not the switch distance in the section.

    Reference: NEC 2023, 680.22(C)

  10. A residential master electrician is wiring a new dwelling that requires a Wisconsin uniform building permit. When may the installation of electrical wiring begin?

    Answer: Only after the uniform building permit has been issued

    SPS 305.435(5)(a) says that for any installation requiring a uniform building permit under SPS 320.08, the residential master electrician may not commence installation of electrical wiring until the permit is issued. Filing an application or having approved plans is not enough, and a rough inspection comes after the work has begun.

    Reference: Wisconsin Administrative Code SPS 305 (Register September 2026), SPS 305.435(5)(a)

Sources

Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.