Requirements at a glance
| Agency | Wisconsin Department of Safety and Professional Services (DSPS) |
|---|---|
| Experience | An engineering degree, or 12 months as a journeyman, or 10,000 hours over 60 months; experience is reported on Form 8168 |
| Exam | 50 questions, 4 hours, 70% to pass |
| Books allowed | One binder (SPS 305, SPS 316, printed notes), the 2023 NEC codebook or handbook, and up to two bound reference books |
| Fees | $95 at Pearson VUE ($30 at a DSPS site) per exam, plus the credential application fee; master credential $200 plus $35 application, 4-year term (renews June 30, 24 CE hours) |
Electricians applying to DSPS for a master license with an engineering degree, 12 months as a journeyman, or 10,000 hours over 60 months.
Official links
- Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)
- DSPS: trades exam information and fee schedule (opens in a new tab)
- Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)
- Wisconsin Admin. Code chapter SPS 316 (electrical) (opens in a new tab)
- DSPS permitted trades exam materials (PDF) (opens in a new tab)
How to get licensed, step by step
Apply to DSPS
Apply in LicensE with proof of your journeyman license, degree or experience. DSPS issues exam instructions once your qualifications are met.
Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)LicensE: apply for your credential (opens in a new tab)
Schedule your exam
Once your qualifications are met, DSPS sends an exam authorization. Schedule with Pearson VUE or, for electrical exams, a DSPS exam site. If you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
DSPS: trades exam information and fee schedule (opens in a new tab)Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)
Take the exam
50 questions, 4 hours, 70% to pass. Bring only the items DSPS lists; sticky notes, loose paper and removable tabs are not allowed.
Wisconsin Admin. Code chapter SPS 316 (electrical) (opens in a new tab)DSPS permitted trades exam materials (PDF) (opens in a new tab)
Results and licensing
After you pass, wait 2 days, then submit your license application in LicensE. DSPS sends one exam authorization at a time, so a retake needs a new authorization. On two-part exams a failed part is retaken alone and all parts must be passed within 1 year.
How to prepare
- With only 50 questions, expect heavier load calculations and Wisconsin licensing and enforcement rules in SPS 305 and SPS 316.
- The exam uses the 2023 NEC. SPS 316.007 adopts it, and Wisconsin's changes are in SPS 316.080 and following: know where SPS 316 differs from the model NEC.
- Put SPS 305 and SPS 316 in your binder with three-hole-punched notes, and tab your NEC with tabs that come with the bound book.
- Every Wisconsin trades exam is open book, but DSPS limits what you can bring (a binder plus the listed books), and tabs must come with a bound book. Practice finding answers fast in your own binder.
- DSPS publishes no content outline or topic weights, so our topic split is an estimate built from the reference lists DSPS prints. Counts and times come from DSPS's exam table.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC and SPS 316. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2023 EditionEssential
DSPS lets you bring a 2023 NEC codebook or handbook. SPS 316.007 adopts the 2023 NEC; Wisconsin's changes are in SPS 316.080 and following.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Wisconsin Admin. Code chapters SPS 305 and SPS 316Essential
Both go in your binder. SPS 316 adopts the NEC and lists Wisconsin's changes; SPS 305 covers credential and exam rules.
Official reference list (as published by the testing agency)
- One binder with Wis. Admin. Code SPS 305 and SPS 316 and your printed notes
- 2023 National Electrical Code (NEC) codebook or handbook; SPS 316.007 adopts the 2023 NEC, and Wisconsin changes are in SPS 316.080 and following
- Up to two printed, bound reference books (for example Ugly's, Ferm's Fast Finder, Tom Henry or Mike Holt series)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Electrical Theory and Calculations | 14 | |
| General Requirements and Definitions (NEC Articles 90 to 110) | 6 | |
| Wiring and Protection (NEC Chapter 2) | 16 | |
| Wiring Methods and Materials (NEC Chapter 3) | 14 | |
| Equipment for General Use (NEC Chapter 4) | 14 | |
| Special Occupancies, Equipment and Conditions (NEC Chapters 5 to 7) | 12 | |
| Wisconsin Electrical Code and Licensing (SPS 316 and SPS 305) | 24 |
Exam day details
- Administered by the Wisconsin Department of Safety and Professional Services (DSPS); exams are given by Pearson VUE or at a DSPS exam site.
- Fee: $95 at Pearson VUE ($30 at a DSPS exam site). The credential application fee is separate.
- 50 questions in 4 hours (DSPS exam table); open book; 70% to pass.
- Open book: bring one binder (three-hole-punched printed notes and printed code), plus the other references DSPS lists for your exam. Loose paper, removable tabs, sticky notes and paperclips are not allowed; practice exams do not count as notes.
- You can test at a Pearson VUE center or a DSPS exam site, but once you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
- The passing score is 70%. For two-part exams you need 70% in each part, a failed part is retaken alone, and all parts must be passed within 1 year (SPS 305.09(6)).
- DSPS sends one exam authorization at a time. After you pass, wait 2 days, then apply for the license in LicensE.
- DSPS publishes no content outline or topic weights (SPS 305.09(5) says the exams are based on a job analysis), so our topic split is an estimate built from the reference lists DSPS prints.
Note: DSPS publishes the question counts, time limits and permitted references but no content outline or topic weights, so our topic split is an estimate. Counts come from DSPS's exam table and were not checked against Pearson.
Frequently asked questions
How many questions are on the Wisconsin master electrician exam?
50 questions in 4 hours, open book, with 70% to pass (DSPS exam table).
Is the master exam on the same NEC edition?
Yes. It uses the 2023 NEC with Wisconsin SPS 316 and SPS 305, and the same three reference items as the journeyman exam.
Can I switch between Pearson and a DSPS site?
Not once you choose Pearson. You cannot switch back to a DSPS exam site.
Free questions with answers
Show all 10 free questions and answers
A balanced three-phase, 480-volt motor-driven process load draws 45 kW at a power factor of 0.90. What is the line current?
Answer: 60.1 A
I = P / (1.732 x E x PF) = 45,000 / (1.732 x 480 x 0.90) = 45,000 / 748.2 = 60.1 A. Leaving the power factor out gives 54.1 A, multiplying by the power factor instead of dividing gives 48.7 A, and treating the load as single-phase (no 1.732) gives 104.2 A.
Reference: Electrical theory (three-phase power), Three-phase power: P = 1.732 x E x I x PF
A 112.5-kVA, three-phase transformer has a 480-volt delta primary and a 208Y/120-volt secondary. What is the full-load secondary line current?
Answer: 312 A
I = VA / (1.732 x E) = 112,500 / (1.732 x 208) = 112,500 / 360.3 = 312 A. The 135 A value is the primary current (112,500 / (1.732 x 480)). Leaving out the 1.732 gives 541 A, and using the 120-volt line-to-neutral voltage as the line voltage gives 937 A.
Reference: Electrical theory (three-phase transformer current), Three-phase current: I = VA / (1.732 x E)
A contractor is adding circuits to an existing building where no permit is required. Under SPS 316.003(6), when must the additions and alterations comply with SPS 316?
Answer: With the code in effect at the beginning of the project
SPS 316.003(6) requires additions and alterations to comply with all provisions of the chapter at the time of permit application or, if no permit is required, the beginning of the project. The date of original construction applies to existing installations and repairs, not to new additions, and the completion date is not the trigger.
Reference: Wis. Admin. Code SPS 316, SPS 316.003(6)
A new switchboard is rated 1,600 amperes, is 8 feet wide and contains overcurrent and switching devices. What does 110.26(C)(2) require for entrances to the working space?
Answer: One entrance at each end, at least 24 inches wide and 6.5 feet high
Section 110.26(C)(2) applies to equipment rated 1,200 amperes or more and over 6 feet wide that contains overcurrent, switching or control devices. It requires one entrance to and egress from the working space at each end, each at least 24 inches wide and 6-1/2 feet high. A single entrance is permitted only where there is a continuous and unobstructed way of egress travel or where the working space depth is twice (not 1.5 times) the depth required by 110.26(A)(1).
Reference: NFPA 70 National Electrical Code (NEC), 2023 edition, 110.26(C)(2)
A branch circuit supplies a noncontinuous load of 12 A and a continuous load of 28 A. Before any adjustment or correction factors, what is the minimum conductor ampacity under 210.19(A)(1)?
Answer: 47 A
Branch-circuit conductors must carry the noncontinuous load plus 125 percent of the continuous load: 12 + (28 x 1.25) = 12 + 35 = 47 A. Adding the loads without the 125 percent factor gives 40 A, applying 125 percent to everything gives 50 A, and 35 A counts only the continuous load.
Reference: NFPA 70 National Electrical Code (NEC), 2023 edition, 210.19(A)(1)
A 20-ampere branch circuit supplies two or more receptacle outlets in a shop. According to Table 210.21(B)(3), what receptacle rating is permitted?
Answer: 15 A or 20 A
Table 210.21(B)(3) permits receptacles rated 15 or 20 amperes on a 20-ampere circuit with two or more outlets. A 15-ampere circuit takes only 15-ampere receptacles, and a 30-ampere receptacle is not allowed on a 20-ampere circuit.
Reference: NFPA 70 National Electrical Code (NEC), 2023 edition, 210.21(B)(3) and Table 210.21(B)(3)
Under 300.3(B), how must the conductors of a single circuit, including the equipment grounding conductor, be installed?
Answer: In the same raceway, cable, trench or cord
Section 300.3(B) requires all conductors of the same circuit, and where used the grounded conductor and all equipment grounding conductors and bonding conductors, to be contained within the same raceway, auxiliary gutter, cable tray, cable, trench, cord or cable. Splitting phase conductors into separate metal raceways causes inductive heating and unbalanced impedance.
Reference: NFPA 70 National Electrical Code (NEC), 2023 edition, 300.3(B)
Under 300.12, how must metal or nonmetallic raceways be installed between outlet, junction or splicing points?
Answer: Mechanically continuous between boxes, cabinets, conduit bodies and fittings
Section 300.12 requires raceways, cable armor and cable sheaths to be mechanically continuous between cabinets, boxes, fittings or other enclosures or outlets. The requirement ensures the system holds together as a unit and, for metal raceways, supports the equipment grounding path.
Reference: NFPA 70 National Electrical Code (NEC), 2023 edition, 300.12
A motor controller is located in a plant aisle. Under 430.102(A), where must the controller disconnecting means be?
Answer: In sight from the motor controller location
Section 430.102(A) requires a disconnecting means in sight from the motor controller location (within 50 feet and visible), with exceptions for certain controllers and for locations where it would be impracticable or introduce additional hazards. It is a separate requirement from the motor disconnect in 430.102(B).
Reference: NFPA 70 National Electrical Code (NEC), 2023 edition, 430.102(A)
A building location has easily ignitible combustible dust suspended in the air under normal operating conditions in quantities sufficient to produce explosive or ignitible mixtures. How is the location classified under 500.5(C)?
Answer: Class II, Division 1
Class II locations are those made hazardous by combustible dust. Division 1 applies where the dust is suspended in the air under normal operating conditions in quantities sufficient to produce explosive or ignitible mixtures (or where mechanical failure could produce them), so this is Class II, Division 1. Class I covers flammable gases and vapors, and Class III covers ignitible fibers and flyings.
Reference: NFPA 70 National Electrical Code (NEC), 2023 edition, 500.5(C)(1)
Sources
- DSPS: trades exam information and fee schedule (opens in a new tab)
- Pearson VUE: Wisconsin DSPS Trades candidate handbook (opens in a new tab)
- Wisconsin Admin. Code chapter SPS 316 (electrical) (opens in a new tab)
Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.