West Virginia Remodeling and Repair Contractor Exam: Practice Test & Licensing Guide

The Prov exam for West Virginia remodeling and repair contractors: 50 open-book questions on carpentry, finishes, masonry, concrete and safety, mostly from the 2018 IRC.

Questions
50
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Planning and Estimating

A homeowner asks a licensed remodeling and repair contractor for a quote. Which of these jobs fits the definition of the classification in 28 CSR 2 section 3.29?

Requirements at a glance

AgencyWest Virginia Contractor Licensing Board (Division of Labor); exams by Prov
When you need itContracting work of $5,000 or more residential or $25,000 or more commercial (W. Va. Code 30-42-3)
ExamsRemodeling and Repair contractor exam: 50 questions, 3 hours, 70%, plus the Contractor Licensing Act exam
Books allowedIRC 2018, Residential Carpentry and Repair study guide, Masonry and Sitework for the Residential Contractor
Fees$59.95 per Prov exam; $90 annual Board license fee (28 CSR 2, 5.5)

Contractors applying for the West Virginia Remodeling and Repair classification: general remodeling, additions and repairs to existing structures, including rough and finish carpentry. The scope is limited to projects that do not exceed $40,000.

How to get licensed, step by step

  1. Pick your classification

    Every contractor passes the Contractor Licensing Act exam plus a trade exam where one exists. Check the classification definitions in 28 CSR 2.

    West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)28 CSR 2 (Contractor Licensing Board rule) (opens in a new tab)

  2. Apply to the Board

    Apply through the Contractor Licensing Board at the Division of Labor, (304) 558-7890.

    West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)

  3. Take your exams with Prov

    Register at provexam.com or call (866) 720-7768. 3 hours per exam, 70% to pass, score on the spot, no waiting period before a retake.

    Register for your exam with Prov (opens in a new tab)Contractor Licensing Board candidate bulletin (Prov) (opens in a new tab)

How to prepare

  • The license covers projects up to $40,000. Carpentry is 10 of 50 questions; the 2018 IRC supplies about 56% of them.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Residential Code 2018 (ICC), about 56% of questions
  • Study Guide for Residential Carpentry and Repair, 2nd Edition, 2014 (Pearson), about 36%
  • Masonry and Sitework for the Residential Contractor, 2nd Edition (Pearson), about 6%

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
Planning and Estimating5
Sitework4
Concrete5
Masonry5
Carpentry10
Roofing, Siding & Insulation6
Doors & Windows & Stairs5
Finishes5
Safety5

Exam day details

  • Administered by Prov, Inc. for the West Virginia Contractor Licensing Board.
  • Fee: $59.95 to Prov per exam, whether first try or retake. Licensing board application and license fees are separate.
  • 50 questions in 3 hours; 70% to pass.
  • Pass the Contractor Licensing Act exam as well; every West Virginia contractor takes it.
  • Open book: bring the references the bulletin lists (any older or newer edition of the same book is allowed, but the exam is scored on the edition shown in the bulletin). Prepare them only by highlighting and attaching permanent tabs; handwritten notes, moveable tabs and sticky notes are not allowed.
  • Computer-based at a Prov testing center or at home with Examroom remote proctoring. Only a simple 4-function calculator is allowed.
  • You get your score at the testing center. There is no waiting period between attempts and no limit on retakes; retake fees equal the first-try fee.
  • Change or cancel at least 3 business days before your test date or you forfeit the fee. You can ask for a review of your exam after failing it at least twice with a score within 10 points of 70%.

Frequently asked questions

What's on the West Virginia remodeling and repair exam?

50 questions: carpentry 10, roofing, siding and insulation 6, planning and estimating 5, concrete 5, masonry 5, doors, windows and stairs 5, finishes 5, safety 5 and sitework 4.

What is the project limit for this license?

The bulletin says the scope of work is limited to projects where the cost does not exceed $40,000.

Free questions with answers

Show all 10 free questions and answers
  1. A homeowner asks a licensed remodeling and repair contractor for a quote. Which of these jobs fits the definition of the classification in 28 CSR 2 section 3.29?

    Answer: Adding a 12-by-14 foot bedroom to an existing house, including rough and finish carpentry, for a total cost of $36,000

    The definition covers general remodeling, additions and repairs to existing structures, including rough and finish carpentry, where the cost of the undertaking does not exceed $40,000. The new house is not work on an existing structure, and the $52,000 and $48,500 jobs exceed the $40,000 ceiling.

    Reference: 28 CSR 2 (WV Contractor Licensing Board rule), 3.29

  2. A new concrete walk and patio will sit within 10 feet of the foundation of a remodeled house, and a wall prevents the 6-inch fall in 10 feet. What slope does R401.3 require on those impervious surfaces?

    Answer: Not less than 2 percent away from the building

    The R401.3 exception says that where barriers prevent 6 inches of fall in 10 feet, drains or swales are used, and impervious surfaces within 10 feet of the foundation must slope not less than 2 percent away from the building. A level or inward slope would send water to the foundation; 6 percent is not the stated minimum.

    Reference: 2018 International Residential Code, R401.3, Exception

  3. A garage floor in a severe weathering region will have a steel-troweled finish. Under the footnote to Table R402.2, the total air content may be reduced to not less than 3 percent only if what else is done?

    Answer: The specified compressive strength is raised to at least 4,000 psi

    The footnote on Table R402.2 allows garage floors with a steel-troweled finish to reduce total air content (normally 5 to 7 percent) to not less than 3 percent if the specified compressive strength is increased to at least 4,000 psi. Thickness, vapor retarder and sealers are not part of that trade-off.

    Reference: 2018 International Residential Code, Table R402.2, footnote f

  4. A mason is laying the first course of a masonry wall over an uneven foundation. What range of bed joint thickness does R606.3.1 allow for that starting course?

    Answer: Not less than 1/4 inch and not more than 3/4 inch

    R606.3.1 says the bed joint of the starting course placed over foundations shall be not less than 1/4 inch and not more than 3/4 inch, which lets the mason level out the foundation top. Other courses use 3/8-inch joints.

    Reference: 2018 International Residential Code, R606.3.1

  5. How must the double top plate on a wood stud wall be arranged at its end joints under IRC R602.3.2?

    Answer: End joints offset at least 24 inches, with plates overlapping at corners and bearing partitions

    R602.3.2 caps wood stud walls with a double top plate overlapping at corners and intersections with bearing partitions, with end joints offset not less than 24 inches. Joints need not fall over studs. Plates are at least 2-inch nominal and as wide as the studs.

    Reference: 2018 International Residential Code, R602.3.2

  6. A plumber wants to notch a 2x4 stud (3 1/2 inches actual width) in an exterior bearing wall. What is the greatest notch depth allowed by R602.6?

    Answer: 7/8 inch (25 percent of the width)

    R602.6 allows a stud in an exterior wall or bearing partition to be notched to a depth not exceeding 25 percent of its width: 3.5 x 0.25 = 0.875 inch, or 7/8 inch. The 40 percent limit (1.4 inch) applies only to studs in nonbearing partitions.

    Reference: 2018 International Residential Code, R602.6

  7. What is the minimum roof slope on which asphalt shingles may be used under R905.2.2, and what is required between 2:12 and 4:12?

    Answer: 2 units vertical in 12 horizontal; double underlayment between 2:12 and 4:12

    R905.2.2 allows asphalt shingles only on slopes of 2:12 (17 percent) or greater, and requires double underlayment application per R905.1.1 for slopes from 2:12 up to 4:12 (33 percent). Below 2:12 another roof covering system must be used.

    Reference: 2018 International Residential Code, R905.2.2

  8. West Virginia amends IRC R311.7.5 in 87 CSR 4 section 4.1.i. What are the maximum riser height and minimum tread depth for stairs under the amended text?

    Answer: 8 1/4 inches maximum riser and 9 inches minimum tread

    The WV State Building Code rule amends the IRC stair provisions: R311.7.5.1 maximum riser height 8 1/4 inches and R311.7.5.2 minimum tread depth 9 inches. The unamended 2018 IRC values are 7 3/4 inch risers and 10 inch treads, which is the tempting wrong answer.

    Reference: 87 CSR 4 (WV State Building Code), 4.1.i; IRC R311.7.5.1 and R311.7.5.2

  9. Half-inch gypsum board is hung on walls framed 24 inches on center, using screws and no adhesive. What maximum fastener spacing does Table R702.3.5 give for screws?

    Answer: 12 inches

    Table R702.3.5 for 1/2-inch board applied to walls with framing at 24 inches on center without adhesive allows nails at 8 inches and screws at 12 inches. Screws at 16 inches apply when framing is at 16 inches on center. Walls and ceilings use different limits; ceilings take nails at 7 inches.

    Reference: 2018 International Residential Code, Table R702.3.5

  10. A firm is renovating a pre-1978 house under EPA's renovation rule. Which practice is prohibited on painted surfaces under 40 CFR 745.85(a)(3)?

    Answer: Open-flame burning or torching of painted surfaces

    40 CFR 745.85(a)(3) prohibits open-flame burning or torching of painted surfaces; prohibits high-speed paint removal machines (sanding, grinding, power planing, needle gun, abrasive blasting) unless equipped with shrouds or containment and a HEPA vacuum attachment; and permits heat guns only below 1,100 degrees Fahrenheit. The rule applies to target housing, which 40 CFR 745.103 defines as housing built before 1978 (with limited exceptions for elderly or disabled housing and 0-bedroom units).

    Reference: 40 CFR Part 745 Subpart E (EPA Lead RRP rule), 745.85(a)(3)