West Virginia licensing exam

West Virginia Contractor Licensing Act Exam: Practice Test & Licensing Guide

The Prov exam every West Virginia contractor passes: 90 open-book questions on the Contractor Licensing Act, Board rules, written contracts and the construction defect cure statute.

Questions
90
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10West Virginia Code 30-42, Contractor Licensing Act

What is the maximum penalty after hearing for failing to post the license or to include the license number as required by 30-42-6(b)?

Requirements at a glance

AgencyWest Virginia Contractor Licensing Board (Division of Labor); exams by Prov
When you need itContracting work of $5,000 or more residential or $25,000 or more commercial (W. Va. Code 30-42-3)
ExamsContractor Licensing Act exam: 90 questions, 3 hours, 70%, plus a trade exam where one exists
Books allowedThe West Virginia Contractor Licensing Act Study Guide (all questions come from it) or the older Business and Law Study Guide, 6th Edition
Fees$59.95 per Prov exam; $90 annual Board license fee (28 CSR 2, 5.5)

Everyone applying for a West Virginia contractor license, in addition to the trade exam for the classification where one exists.

How to get licensed, step by step

  1. Pick your classification

    Every contractor passes the Contractor Licensing Act exam plus a trade exam where one exists. Check the classification definitions in 28 CSR 2.

    West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)28 CSR 2 (Contractor Licensing Board rule) (opens in a new tab)

  2. Apply to the Board

    Apply through the Contractor Licensing Board at the Division of Labor, (304) 558-7890.

    West Virginia Contractor Licensing Board (Division of Labor) (opens in a new tab)

  3. Take your exams with Prov

    Register at provexam.com or call (866) 720-7768. 3 hours per exam, 70% to pass, score on the spot, no waiting period before a retake.

    Register for your exam with Prov (opens in a new tab)Contractor Licensing Board candidate bulletin (Prov) (opens in a new tab)

How to prepare

  • Code 30-42 is 37 questions and 28 CSR 4 (written contracts) is 24: learn what a contract for services must contain.
  • Code 21-11A (notice and opportunity to cure construction defects) is 19 questions: know the notice and response time limits.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the Contractor Licensing Act study guide. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • West Virginia Contractor Licensing Act Study Guide (Prov bookstore); all questions come from this book
  • The older West Virginia Business and Law Study Guide, 6th Edition, is also allowed because it contains the same statutes and rules

What's on the exam

Official content outline from Prov, Inc. (number of questions per topic):

TopicQuestions
West Virginia Code 30-42, Contractor Licensing Act37
28 CSR 2, Contractor Licensing Act Rules10
28 CSR 4, Written Contracts for Services24
West Virginia Code 21-11A, Notice and Opportunity to Cure Construction Defects19

Exam day details

  • Administered by Prov, Inc. for the West Virginia Contractor Licensing Board.
  • Fee: $59.95 to Prov per exam, whether first try or retake. Licensing board application and license fees are separate.
  • 90 questions in 3 hours; 70% to pass.
  • Open book: bring the references the bulletin lists (any older or newer edition of the same book is allowed, but the exam is scored on the edition shown in the bulletin). Prepare them only by highlighting and attaching permanent tabs; handwritten notes, moveable tabs and sticky notes are not allowed.
  • Computer-based at a Prov testing center or at home with Examroom remote proctoring. Only a simple 4-function calculator is allowed.
  • You get your score at the testing center. There is no waiting period between attempts and no limit on retakes; retake fees equal the first-try fee.
  • Change or cancel at least 3 business days before your test date or you forfeit the fee. You can ask for a review of your exam after failing it at least twice with a score within 10 points of 70%.

Frequently asked questions

What's on the West Virginia Contractor Licensing Act exam?

90 questions: Code 30-42 (the Act) 37, 28 CSR 4 (written contracts) 24, Code 21-11A (notice and opportunity to cure construction defects) 19 and 28 CSR 2 (Board rule) 10.

What book do I use?

The West Virginia Contractor Licensing Act Study Guide from the Prov bookstore; the bulletin says 100% of questions come from it. The older Business and Law Study Guide, 6th Edition, may also be used.

Do I take this exam for every contractor classification?

Yes. Every contractor passes this exam plus a trade exam for the classification where one exists.

Free questions with answers

Show all 10 free questions and answers
  1. What is the maximum penalty after hearing for failing to post the license or to include the license number as required by 30-42-6(b)?

    Answer: A warning, a reprimand, or a fine of not more than $200

    Section 6(b) limits the penalty for posting and license-number violations to a warning, a reprimand or a fine of not more than $200, after a hearing.

    Reference: W. Va. Code, Chapter 30, Article 42, 30-42-6(b)

  2. After passing the examination and before the license is issued, the applicant must certify by affidavit compliance with which set of requirements?

    Answer: Business franchise tax provisions, workers' compensation and employment security registration, and applicable wage bond requirements

    Section 5(e) lists three items: chapter 11 business franchise tax compliance, registration with the workers' compensation fund and employment security fund, and the wage bond rules of 21-5-14.

    Reference: W. Va. Code, Chapter 30, Article 42, 30-42-5(e)

  3. Which officials serve on the Contractor Licensing Board as ex-officio nonvoting members?

    Answer: The Tax and Revenue Secretary and the WorkForce West Virginia Commissioner, or designees

    Section 4(a) names the Tax and Revenue Secretary and the WorkForce West Virginia Commissioner (or designees) as nonvoting ex-officio members.

    Reference: W. Va. Code, Chapter 30, Article 42, 30-42-4(a)

  4. The qualifier whose trade classification examination score licensed an entity leaves the company. Within how many calendar days after notice of the severance must the entity name a replacement qualifier?

    Answer: 45 calendar days

    Rule 4.5 gives 45 calendar days; under 4.7 failure may lead to removal of the classification from the license or inactivation of the license. Since May 2026, 4.5 excuses an entity from replacing a departing business and law examination qualifier if it has done business in WV for at least one year and has had no workers' compensation or unemployment default listing or Board discipline in the past 12 months.

    Reference: W. Va. Code R. 28-2 (Contractor Licensing Board), 28 CSR 2, section 4.5

  5. Does the general building contractor classification cover electrical, plumbing and HVAC work on a commercial building?

    Answer: No, except on a residential structure those trades are outside its scope

    Rule 3.18: except for work on a residential structure as defined in 30-42-3, the general building contractor scope does not include electrical, plumbing, HVAC, piping or general engineering work. Supervising the whole project does not extend the classification to those trades.

    Reference: W. Va. Code R. 28-2 (Contractor Licensing Board), 28 CSR 2, section 3.18

  6. Under 28 CSR 4, a licensee must have a written contract before starting a construction project whose aggregate value is at least

    Answer: $10,000

    Rule 1.1 and 3 apply to construction projects with an aggregate value of $10,000 or more, matching 30-42-10(b).

    Reference: W. Va. Code R. 28-4 (Contractor Licensing Board), 28 CSR 4, sections 1.1, 3

  7. Under 28 CSR 4, the term "days" means

    Answer: Business days, unless otherwise stated

    Rule 2.6 defines days as business days unless otherwise stated. Note that the cure statute, 21-11A-4(7), defines day as a calendar day.

    Reference: W. Va. Code R. 28-4 (Contractor Licensing Board), 28 CSR 4, section 2.6

  8. Is there a required format for the written contract under 28 CSR 4?

    Answer: No, but it must include the provisions listed in rule 4.1

    Rule 4.1 says there is no required format but lists the minimum provisions. The Board's Appendix A form may be modified as long as the required provisions stay (rule 1.1).

    Reference: W. Va. Code R. 28-4 (Contractor Licensing Board), 28 CSR 4, sections 1.1, 4.1

  9. Which is NOT one of the three permitted contents of the contractor's 30-day written response under 21-11A-10(d)?

    Answer: An offer to repair the defect without first inspecting the home

    Section 10(d) allows: (1) a monetary settlement offer without inspection, (2) a proposal to inspect, or (3) a statement disputing the claim and refusing to remedy or settle. A repair offer comes after an inspection under 10(i).

    Reference: W. Va. Code, Chapter 21, Article 11A, 21-11A-10(d)

  10. After the inspection, within how many days must the contractor serve a written offer to remedy, an offer to settle, or a statement it will not proceed?

    Answer: 14 days following completion of the inspection

    Section 10(i) sets a fourteen-day deadline after the inspection is complete.

    Reference: W. Va. Code, Chapter 21, Article 11A, 21-11A-10(i)

Sources

Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.