Washington licensing exam

Washington Residential Specialty Plumber Exam: Practice Test & Licensing Guide

Washington's residential specialty plumber exam, three closed-book parts: 100 residential code and trade questions from the 2015 UPC with Washington amendments, plus 25-item waste and vent and 25-item water sizing drawing exercises. 70% on each part.

Questions
150
Time limit
4.5 hours
Passing score
70% per part
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Administration and Definitions

In a house, the building drain is the part of the lowest drainage piping that receives the discharge of soil, waste and other drainage pipes inside the building. Where does the building drain end and the building sewer begin?

Requirements at a glance

AgencyWashington State Department of Labor & Industries (L&I) Plumber Certification; exams by PSI
ExamResidential code and trade knowledge: 100 questions. Waste and vent drawings: 25 items. Water sizing drawings: 25 items. 90 minutes each, 70% on each, closed book
Books allowedNone: closed book. PSI provides UPC Tables 702.1, 610.3, 610.4 and 610.10 (not Table 703.2)
FeesL&I application $202.10 (paid again after a fail); PSI $84 for the three parts, $52 per retest portion.
TimingApproval is good for 1 year. Wait 14 days after a fail. Pay the certificate fee within 90 days of passing.

Plumber trainees applying to L&I for the residential specialty plumber certificate (3 years of residential plumbing experience).

How to get licensed, step by step

  1. Apply to L&I

    Send L&I your plumber certification application and the $202.10 fee with proof of experience. L&I approves you and PSI emails you.

    Washington L&I: Plumber examination (opens in a new tab)

  2. Study the 2015 UPC

    The exam is on the 2015 UPC with Washington amendments, even though job sites use the 2021 UPC. It is closed book, so learn the sizing tables, especially Table 703.2.

    PSI Washington Plumbing Candidate Information Bulletin (opens in a new tab)

  3. Schedule with PSI

    Pay PSI $84 and schedule all three parts.

    PSI: schedule Washington plumbing exams (opens in a new tab)

  4. Pass all three parts

    70% on each part. Then pay your certificate fee within 90 days.

    Washington L&I: Plumber examination (opens in a new tab)

How to prepare

  • Memorize UPC Table 703.2: it is not handed out.
  • Drawing parts use a house: add DFUs and WSFUs fixture by fixture and choose minimum pipe sizes.
  • Fixtures and water heaters are a big share of residential work: know clearances, relief valves, expansion tanks and strapping.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

  • Uniform Plumbing Code (UPC), 2015 (IAPMO), with Washington State amendmentsEssential

    Study copy only: the plumber exam is closed book. WABO sells the 2015 UPC with Washington amendments.

    WABO (opens in a new tab)

Official reference list (as published by the testing agency)
  • Uniform Plumbing Code (UPC), 2015 (IAPMO), with Washington State amendments (closed book: study only)
  • UPC Tables 702.1, 610.3, 610.4 and 610.10 (provided at the exam)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Residential Code and General Trade Knowledge(100 items, 100 scored · 90 min)
Administration and Definitions6
General Regulations12
Plumbing Fixtures and Fixture Fittings13
Water Heaters11
Water Supply and Distribution15
Sanitary Drainage15
Indirect Wastes5
Vents12
Traps and Interceptors7
Alternate Water Sources and Rainwater Catchment4
Waste and Vent Residential Drawings(25 items, 25 scored · 90 min)
Waste and Vent Sizing (Drawings)25
Water Sizing Residential Drawings(25 items, 25 scored · 90 min)
Water Pipe Sizing (Drawings)25

The parts are timed and scored separately, and you must pass each one. Our simulations score each part the same way and give you the combined time (270 minutes).

Exam day details

  • Administered by PSI, for the Washington State Department of Labor & Industries (L&I) Plumber Certification.
  • Fee: $84 to PSI for the three-part exam ($52 per retest portion), plus L&I's nonrefundable $202.10 application and exam fee, which you pay again after a fail.
  • Three parts, 90 minutes each: residential code and general trade knowledge (100 questions, UPC Chapters 1-10, 15, 16 and 17 with amendments), residential waste and vent drawings (25 items) and residential water sizing drawings (25 items). 70% to pass each.
  • Closed book. PSI provides UPC Tables 702.1, 610.3, 610.4 and 610.10 with the exam; Table 703.2 (maximum loading and length of drainage and vent piping) is not provided, so learn it.
  • The exam is based on the 2015 Uniform Plumbing Code with Washington State Building Code Council amendments, even though Washington now enforces the 2021 UPC (WAC 51-56). Study the 2015 edition.
  • The drawing parts show a house's fixtures and piping; you give fixture units and minimum pipe sizes. Our practice turns them into sizing questions.
  • Apply to L&I first; approval is good for 1 year. You must pass all 3 parts (70% each). After a fail you reapply to L&I, pay again and wait 14 days; L&I decides whether a part you passed is waived. Pay your certificate fee within 90 days of passing.
  • L&I lists the UPC chapters but not how many questions come from each; our topic weights are estimates.

Frequently asked questions

What's on the Washington residential plumber exam?

Three parts. Residential code and general trade knowledge, 100 questions from UPC Chapters 1-10, 15, 16 and 17 with Washington amendments (our estimated split: Administration and Definitions 6; General Regulations 12; Plumbing Fixtures and Fixture Fittings 13; Water Heaters 11; Water Supply and Distribution 15; Sanitary Drainage 15; Indirect Wastes 5; Vents 12; Traps and Interceptors 7; Alternate Water Sources and Rainwater Catchment 4). Residential waste and vent drawings, 25 items. Residential water sizing drawings, 25 items.

Which UPC edition is the Washington plumber exam on?

The 2015 Uniform Plumbing Code with Washington amendments, per L&I and PSI. Washington enforces the 2021 UPC on job sites, but the exam has not changed editions. The exam is closed book; PSI hands out Tables 702.1, 610.3, 610.4 and 610.10.

Do I have to retake every part if I fail one?

PSI's bulletin says journey level and residential candidates who fail any part retake all parts, but L&I decides whether a part you passed is waived based on previous attempts. Either way you reapply to L&I and pay the $202.10 fee again.

Free questions with answers

Show all 10 free questions and answers
  1. In a house, the building drain is the part of the lowest drainage piping that receives the discharge of soil, waste and other drainage pipes inside the building. Where does the building drain end and the building sewer begin?

    Answer: At the point 2 feet outside the building wall

    The UPC defines the building drain as the lowest piping that receives the discharge of drainage pipes inside the walls and conveys it to the building sewer beginning 2 feet outside the building wall. The property line and the first cleanout are not the dividing points.

    Reference: 2015 Uniform Plumbing Code, Chapter 2, Definitions: Building Drain

  2. A plumber is hanging 2-inch Schedule 40 PVC DWV pipe horizontally in a house crawl space. What is the maximum hanger spacing?

    Answer: 4 feet

    Table 313.3 allows solvent-cemented PVC and ABS DWV pipe a maximum of 4 feet between supports in horizontal runs, for all sizes. 6 feet applies to copper tube 1-1/2 inch and smaller, and 10 feet to 2-inch and larger copper.

    Reference: 2015 Uniform Plumbing Code, Table 313.3, Hangers and Supports

  3. A site-built shower receptor has a finished curb at the entry. How deep must the threshold be, measured from the top of the dam to the top of the drain?

    Answer: At least 2 inches and not more than 9 inches

    Section 408.5 requires the finished dam or threshold to be at least 2 inches and no more than 9 inches measured from the top of the dam to the top of the drain. The curb must also be at least 1 inch lower than the receptor sides and back.

    Reference: 2015 Uniform Plumbing Code, Section 408.5

  4. A gasketed door on a water heater closet in a bathroom is equipped with a self-closing device. What is true about the closing mechanism?

    Answer: It must not have a hold-open feature, and the door must latch each time it closes

    Section 504.1.1 requires self-closing doors to swing freely and to close and latch each time they are opened, with no hold-open feature in the closing mechanism.

    Reference: 2015 Uniform Plumbing Code, Section 504.1.1

  5. Where an atmospheric vacuum breaker is used to protect a hose connection, how high must it be installed above the highest point of use?

    Answer: At least 6 inches above the highest point of use

    Section 603.5.7 places an atmospheric vacuum breaker not less than 6 inches above the highest point of usage on the discharge side of the last valve. Deck-mounted units use a 1 inch critical level (603.5.13).

    Reference: 2015 Uniform Plumbing Code, Section 603.5.7

  6. A 4-inch building drain in a house cannot be installed at 1/4 inch per foot because of the depth of the sewer. Under what condition is 1/8 inch per foot permitted?

    Answer: When the Authority Having Jurisdiction first approves it

    Section 708.1 allows pipe 4 inches or larger a slope of not less than 1/8 inch per foot (1 percent) where 1/4 inch per foot is impractical because of sewer depth or structural features, but only when first approved by the Authority Having Jurisdiction.

    Reference: 2015 Uniform Plumbing Code, Section 708.1

  7. The vent system must be designed to keep a trap seal from being exposed to a pressure difference greater than what, on the outlet side of the trap?

    Answer: 1 inch water column

    Section 901.3 requires the vent system to prevent trap seals from being exposed to a pressure differential exceeding 1 inch water column on the outlet side of the trap.

    Reference: 2015 Uniform Plumbing Code, Section 901.3

  8. How many traps are permitted on a single trap arm?

    Answer: One

    Section 1001.2 permits not more than one trap on a trap arm. Section 1004.1 also prohibits double trapping any fixture.

    Reference: 2015 Uniform Plumbing Code, Section 1001.2

  9. A residential kitchen has a sink with a food waste disposer and a domestic dishwasher draining through the sink tailpiece. What DFU load does Table 702.1 assign to this group?

    Answer: 2 DFU

    Table 702.1 lists a domestic kitchen sink at 2 DFU "with or without food waste disposer, dishwasher, or both," so the whole group counts as 2 DFU. Adding 2 DFU for the dishwasher would double count it (4 DFU).

    Reference: 2015 Uniform Plumbing Code, Table 702.1

  10. For water pipe sizing, a plumber totals the supply load of one private bath: a 1.6 gpf gravity-tank toilet, a lavatory and a tub-shower. What is the WSFU total from Table 610.3?

    Answer: 7.5 WSFU

    Table 610.3 private values: 1.6 gpf gravity-tank water closet 2.5, lavatory 1.0, bath/shower combination 4.0. Total 2.5 + 1.0 + 4.0 = 7.5 WSFU.

    Reference: 2015 Uniform Plumbing Code, Table 610.3

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.