Washington's domestic pump and pump and irrigation specialty plumber exam: 45 open-book questions in 90 minutes from Chapters 2, 3, 6 and 16 of the 2015 UPC with Washington amendments. 70% to pass.

Questions
45
Time limit
90 min
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10UPC Chapter 2: Definitions

An irrigation booster pump raises the pressure in a sprinkler system above the pressure of the potable supply feeding it. If water then flows back into the potable piping, which type of backflow is this?

Requirements at a glance

AgencyWashington State Department of Labor & Industries (L&I) Plumber Certification; exams by PSI
Exam45 questions, 90 minutes, 70% to pass, open book
Books allowed2015 UPC with Washington amendments (sold by WABO). Highlighting, notes and permanent tabs before the exam; no writing in it during the exam
FeesL&I's application fee plus PSI's exam fee (see the exam details above).
TimingApproval is good for 1 year. Wait 14 days after a fail. Pay the certificate fee within 90 days of passing.

Plumbers applying to L&I for a pump and irrigation (PL03) or limited volume domestic pump (PL03A) specialty certificate: pumps, pressure and storage tanks, filtration and treatment equipment and related piping.

How to get licensed, step by step

  1. Apply to L&I

    Apply to L&I for the pump and irrigation (PL03) or limited volume domestic pump (PL03A) specialty exam with proof of your experience.

    Washington L&I: Plumber examination (opens in a new tab)

  2. Study

    Tab UPC Chapters 2, 3, 6 and 16 of your 2015 UPC with Washington amendments: every question comes from them.

    PSI Washington Plumbing Candidate Information Bulletin (opens in a new tab)

  3. Schedule with PSI

    After L&I approves you, PSI emails you. Schedule online or at 855-746-8173.

    PSI: schedule Washington plumbing exams (opens in a new tab)

  4. Pass and certify

    70% to pass. Pay your certificate fee within 90 days.

    Washington L&I: Plumber examination (opens in a new tab)

How to prepare

  • Chapter 6 (water supply and distribution) is about half the exam: pressure, tanks, backflow protection, materials and sizing.
  • Chapter 3 general regulations: pipe protection, hangers and supports, trenching and testing.
  • Open book only helps if you can find things fast: tab definitions (Chapter 2) and the Chapter 6 tables.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2015 UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Uniform Plumbing Code (UPC), 2015 (IAPMO), with Washington State amendmentsEssential

    Allowed in the room for the pump exam. Tab Chapters 2, 3, 6 and 16; permanent tabs only.

    WABO (opens in a new tab)

Official reference list (as published by the testing agency)
  • Uniform Plumbing Code (UPC), 2015 (IAPMO), with Washington State amendments (allowed in the exam room)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
UPC Chapter 2: Definitions4
UPC Chapter 3: General Regulations11
UPC Chapter 6: Water Supply and Distribution21
UPC Chapter 16: Nonpotable Rainwater Catchment Systems9

Exam day details

  • Administered by PSI, for the Washington State Department of Labor & Industries (L&I) Plumber Certification.
  • Fee: L&I's application and exam fee plus PSI's exam fee; PSI's bulletin prints only the three-part fee ($84) and the $52 retest portion fee.
  • One open-book part: 45 questions, 90 minutes, 70% to pass. Questions come from UPC Chapters 2 (definitions), 3 (general regulations), 6 (water supply and distribution) and 16 with Washington amendments.
  • Bring the 2015 UPC with Washington amendments (sold by WABO). It may be highlighted, underlined, annotated and tabbed with permanent tabs before the exam, but not written in during it; no loose papers.
  • The exam is based on the 2015 Uniform Plumbing Code with Washington State Building Code Council amendments, even though Washington now enforces the 2021 UPC (WAC 51-56). Study the 2015 edition.
  • Pump and irrigation work can also need an electrical pump and irrigation specialty (03) certificate; L&I issues a combined document to those who hold both.
  • Apply to L&I first; approval is good for 1 year. 70% to pass. After a fail you reapply to L&I and wait 14 days. Pay your certificate fee within 90 days of passing.
  • L&I describes the exam's subject areas but not how many questions come from each; our topic weights are estimates.

Frequently asked questions

What's on the Washington pump specialty plumber exam?

45 questions from UPC Chapters 2, 3, 6 and 16 with Washington amendments. Our estimated split: UPC Chapter 2: Definitions 4; UPC Chapter 3: General Regulations 11; UPC Chapter 6: Water Supply and Distribution 21; UPC Chapter 16: Nonpotable Rainwater Catchment Systems 9.

Is the Washington pump exam open book?

Yes. It is the only open-book plumber specialty exam besides medical gas: bring the 2015 UPC with Washington amendments. Permanent tabs only, and you may not write in it during the exam.

Which UPC edition is the Washington plumber exam on?

The 2015 Uniform Plumbing Code with Washington amendments, per L&I and PSI. Washington enforces the 2021 UPC on job sites, but the exam has not changed editions. The exam is closed book; PSI hands out Tables 702.1, 610.3, 610.4 and 610.10.

Free questions with answers

Show all 10 free questions and answers
  1. An irrigation booster pump raises the pressure in a sprinkler system above the pressure of the potable supply feeding it. If water then flows back into the potable piping, which type of backflow is this?

    Answer: Backpressure backflow

    The UPC defines backpressure backflow as backflow caused by a pressure increased above the supply pressure, which may be due to pumps, boilers, gravity or other sources of pressure. Backsiphonage is the opposite case: flow back into the supply caused by a pressure less than atmospheric in the supply pipe.

    Reference: 2015 Uniform Plumbing Code, Section 204.0, Definitions (Backpressure Backflow)

  2. A pump contractor is replacing piping in an older house where a strict code layout is impractical. Under Section 301.2.5, how can a deviation from the code be allowed?

    Answer: The AHJ may permit it if the proposal is first submitted for review

    Section 301.2.5 gives the Authority Having Jurisdiction discretionary power to permit deviations in existing buildings being altered, repaired or renovated, provided the proposal is first submitted for a determination so that health and safety are protected. Neither the contractor nor the owner can grant the deviation.

    Reference: 2015 Uniform Plumbing Code, Section 301.2.5

  3. A county building department approves an alternate pipe material for a pump installation under Section 301.3. What effect does that approval have in a neighboring city?

    Answer: None outside the approving jurisdiction's boundaries

    Section 301.3 lets the Authority Having Jurisdiction approve equivalent alternate materials and methods, but the exercise of that discretionary approval has no effect beyond its jurisdictional boundaries. The installer would need separate approval from the neighboring city.

    Reference: 2015 Uniform Plumbing Code, Section 301.3

  4. A nonpotable process water line runs through several rooms of a building. Under Section 601.3.2, how often must its color and required information appear?

    Answer: Every 20 feet, and at least once per room

    Section 601.3.2 requires the background color and required information to be shown every 20 feet but not less than once per room, visible from the floor level. Nonpotable systems also show the liquid conveyed and the direction of normal flow.

    Reference: 2015 Uniform Plumbing Code, Section 601.3.2

  5. A lawn irrigation system has no pump, no connection for pumping equipment and no chemical injection. Under Washington's amendment to Section 603.5.6, when may a double check valve assembly (DC) protect its potable supply?

    Answer: Only when the water purveyor and the AHJ approve it

    The unamended UPC Section 603.5.6 lists only the AVB, PVB, SVB and RP for irrigation systems without pumps or chemical injection. Washington adds a fifth option: a double check valve assembly may be allowed when approved by both the water purveyor and the Authority Having Jurisdiction (AHJ).

    Reference: WAC 51-56-0600 (Washington amendments to the 2015 UPC), Section 603.5.6, item (5) (WA amendment)

  6. A 1-1/4 inch PE water line is bent in the trench without fittings. Applying Section 605.6.2, what are the minimum bend radius and the closest a bend may start to a valve?

    Answer: 37.5 inches, and 12.5 inches

    Section 605.6.2 requires PE bends of not less than 30 pipe diameters (or the coil radius when bending with the coil) and no bend closer than 10 pipe diameters to a fitting or valve. For 1-1/4 inch pipe: 30 x 1.25 = 37.5 inches and 10 x 1.25 = 12.5 inches. Using 30 and 10 inches applies the multipliers to 1-inch pipe; 6.25 inches uses 5 diameters.

    Reference: 2015 Uniform Plumbing Code, Section 605.6.2

  7. A pump contractor installs a rainwater cistern with a city-water makeup line that tops off the tank in dry weeks. Under Section 1602.4, how must the potable makeup connection be protected?

    Answer: By an air gap or a reduced-pressure principle backflow preventer

    Section 1602.4 prohibits any unprotected connection between a rainwater catchment system and a potable supply. Potable or reclaimed makeup water is allowed only when the makeup connection is protected by an air gap or a reduced-pressure principle backflow preventer. A double check or vacuum breaker does not meet this section.

    Reference: 2015 Uniform Plumbing Code, Section 1602.4

  8. Washington amends Section 1602.1, which requires rainwater catchment systems that supply water closets, irrigation and similar uses to be approved by the AHJ. What exception does the Washington amendment add?

    Answer: Exterior irrigation piping

    WAC 51-56-1600 amends Section 1602.1 and adds a single exception for exterior irrigation piping. The other choices are not part of the Washington exception; tank-size thresholds appear elsewhere in Chapter 16 and are not this amendment.

    Reference: 2015 Uniform Plumbing Code with WAC 51-56 amendments, Section 1602.1, Exception (WA amendment, WAC 51-56-1600)

  9. A booster pump (not a fire pump) draws from a building supply on a well system. Under Section 609.8, which installation is correct?

    Answer: Low-pressure cutoff within 5 feet of the inlet, set at 10 psi or more

    Section 609.8 requires a booster pump connected to a building supply or underground water pipe to have a low-pressure cutoff switch on the inlet side, installed not more than 5 feet from the inlet and set for not less than 10 psi. A pressure gauge goes between the shutoff valve and the pump. Fire pumps are excluded.

    Reference: 2015 Uniform Plumbing Code, Section 609.8

  10. A pump contractor installs a building supply from a well house to a home. Under Section 609.1, how deep must the yard piping be buried?

    Answer: At least 12 inches below average frost depth, with 12 inches of cover

    Section 609.1 requires building supply yard piping to be at least 12 inches below the average local frost depth, and the cover must be at least 12 inches below finish grade. Burying only to frost depth or only 12 inches deep does not meet both conditions.

    Reference: 2015 Uniform Plumbing Code, Section 609.1