Requirements at a glance
| Agency | Washington State Department of Labor & Industries (L&I) Electrical Program; exams by PSI |
|---|---|
| Exam | NEC and Theory: 40 questions, 2 hours. WA Codes: 17 questions, 1 hour. 70% on each, open book |
| Books allowed | 2020 NEC, printed RCW 19.28 and WAC 296-46B in a three-ring binder, and any original copyrighted reference (Ugly's, Ferm's). Permanent tabs only, no handwritten notes |
| Fees | PSI fees are on the exam details above; L&I application and certificate fees are separate. |
| Timing | Pass all sections within 1 year. Wait 14 days after a fail; after 3 fails of a section, 3 months. |
Electrical trainees applying to L&I for the 02 residential specialty electrician certificate, which needs 4,000 hours of supervised residential experience.
Official links
- Washington L&I: Electrical exam information (opens in a new tab)
- PSI: schedule Washington electrical exams (opens in a new tab)
- PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)
- Chapter 19.28 RCW (electricians and electrical installations) (opens in a new tab)
- Chapter 296-46B WAC (electrical safety standards and certification) (opens in a new tab)
How to get licensed, step by step
Get approved (or register)
Apply to L&I with 4,000 documented hours of residential experience. L&I's eligibility notice gives you the Exam Unique ID you use to register with PSI.
Washington L&I: Electrical exam information (opens in a new tab)
Print the law and get your books
Print RCW 19.28 and WAC 296-46B, hole-punch them into a three-ring binder and tab them. Bring a 2020 NEC (not 2023) and any copyrighted references you like.
Chapter 19.28 RCW (electricians and electrical installations) (opens in a new tab)Chapter 296-46B WAC (electrical safety standards and certification) (opens in a new tab)
Schedule with PSI
Schedule online or at 855-834-8751. Book all sections of your exam for the same day.
PSI: schedule Washington electrical exams (opens in a new tab)PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)
Pass every section
70% on each section; you retest only the sections you fail. Your score appears on screen right away.
PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)
How to prepare
- Washington's exam tests the 2020 NEC, not the 2023 NEC used on job sites. Study and tab a 2020 code book.
- The WA Codes section (17 questions, 1 hour) is scored on its own. Tab WAC 296-46B's certification, supervision and permit sections (the -900s) and know RCW 19.28's basics.
- Wiring methods (7), overcurrent protection (5), grounding and bonding (5) and theory (6) are most of the NEC section.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2020 NEC and RCW 19.28 and WAC 296-46B. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2020 EditionEssential
Washington's exam uses the 2020 edition, not the 2023 NEC enforced on job sites. Permanent tabs only.
Chapter 19.28 RCW and Chapter 296-46B WAC (Washington electrical law and rules)Essential
Print them free and bring them hole-punched in a three-ring binder; every exam has a WA Codes section (17 questions, 20 for master).
Ugly's Electrical References (or another copyrighted quick reference)
Any original copyrighted reference is allowed in the room; handy for theory and formulas.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC), 2020 edition
- Chapter 19.28 RCW (Washington electrical law), current version
- Chapter 296-46B WAC (Washington electrical rules), current version
- Any original copyrighted electrical reference, e.g. Ugly's Electrical References or Ferm's Fast Finder (allowed in the exam room)
What's on the exam
Official content outline from PSI, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| NEC and Theory(40 items, 40 scored · 120 min) | ||
| Article 90: Introduction | 1 | |
| Articles 100-110: General Requirements | 2 | |
| Articles 200-225, 280-285: Wiring and Protection | 2 | |
| Article 230: Services | 3 | |
| Article 240: Overcurrent Protection | 5 | |
| Article 250: Grounding and Bonding | 5 | |
| Articles 300-398: Wiring Methods | 7 | |
| Articles 400-427, 455-480: Electrical Equipment | 1 | |
| Articles 430-450: Motors, HVAC, Generators and Transformers | 3 | |
| Articles 500-516: Hazardous Locations | 1 | |
| Articles 517-590: Special Occupancies | 1 | |
| Articles 600-695: Special Equipment | 1 | |
| Articles 700-702: Emergency and Standby Systems | 1 | |
| Articles 705-780: Special Conditions | 1 | |
| General Trade Knowledge and Theory | 6 | |
| WA Codes(17 items, 17 scored · 60 min) | ||
| Washington Laws and Rules (RCW 19.28 and WAC 296-46B) | 17 | |
The parts are timed and scored separately, and you must pass each one. Our simulations score each part the same way and give you the combined time (180 minutes).
Exam day details
- Administered by PSI, for the Washington State Department of Labor & Industries (L&I) Electrical Program.
- Fee: $65 to PSI for the 3-hour exam (PSI bills electrician exams by the hour ($45 for 1 hour up to $105 for 7 hours); retests are billed by the hour too). L&I's application fee is separate.
- Two sections: NEC and Theory (40 questions, 2 hours) and WA Codes (17 questions, 1 hour). 70% to pass each.
- Open book. Bring the 2020 NEC, printed copies of RCW 19.28 and WAC 296-46B in a three-ring binder, and any original copyrighted reference (Ugly's, Ferm's and so on). Highlighting, underlining and permanent tabs only: no handwritten notes, sticky notes or removable tabs. A silent, nonprogrammable calculator is allowed.
- The exam is based on the 2020 NEC, even though Washington has enforced the 2023 NEC on job sites since April 1, 2024 (and adopts the 2026 NEC on December 31, 2026). Rules that changed in 2023 can give a wrong answer here.
- Get L&I approval first and register with PSI using your Exam Unique ID. You have 1 year from approval to pass all sections.
- 70% on each section. Passed sections carry over: you retest only the sections you failed, within 1 year of your first attempt. Wait 14 days after a fail; after 3 fails of a section, wait 3 months between attempts.
- Up to 10 unscored experimental questions may be added; their time does not count against you.
Frequently asked questions
What's on the Washington residential electrician exam?
PSI's 02 electrician outline. NEC and Theory, 40 questions: Article 90: Introduction 1; Articles 100-110: General Requirements 2; Articles 200-225, 280-285: Wiring and Protection 2; Article 230: Services 3; Article 240: Overcurrent Protection 5; Article 250: Grounding and Bonding 5; Articles 300-398: Wiring Methods 7; Articles 400-427, 455-480: Electrical Equipment 1; Articles 430-450: Motors, HVAC, Generators and Transformers 3; Articles 500-516: Hazardous Locations 1; Articles 517-590: Special Occupancies 1; Articles 600-695: Special Equipment 1; Articles 700-702: Emergency and Standby Systems 1; Articles 705-780: Special Conditions 1; General Trade Knowledge and Theory 6. WA Codes: 17 questions on RCW 19.28 and WAC 296-46B.
What is the WA Codes section?
A separate 1-hour, 17-question section on Washington's electrical law (RCW 19.28) and rules (WAC 296-46B): certificates and supervision, permits and inspections, specialty scopes and Washington's amendments to the NEC. You need 70% on it by itself.
Which NEC edition is the Washington electrical exam on?
The 2020 NEC, plus the current RCW 19.28 and WAC 296-46B. PSI's bulletin and L&I's exam page both say 2020, even though Washington enforces the 2023 NEC on job sites. Bring a 2020 NEC.
Free questions with answers
Show all 10 free questions and answers
A residential (02) specialty electrician is wiring required receptacle and lighting outlets in a dwelling. Nonmetallic-sheathed cable is the normal limit for that wiring. For which of these may the 02 electrician use a different wiring method?
Answer: Wiring buried below grade or located in a wet location
WAC 296-46B-920(2)(a) limits receptacle and lighting outlet wiring in the 02 specialty to nonmetallic-sheathed cable, with exceptions for wiring subject to physical damage, embedded in masonry or concrete, buried below grade or in a wet location, run to unfinished space adaptable to future living areas, or where the installation standards do not allow NM cable. Ordinary finished living spaces get no exception.
Reference: Washington Administrative Code (WAC) chapter 296-46B, WAC 296-46B-920(2)(a)
Under the NEC's Article 90 scope, which chapters apply generally to all electrical installations unless a later chapter supplements or modifies them?
Answer: Chapters 1 through 4
Section 90.3 says Chapters 1, 2, 3 and 4 apply generally. Chapters 5, 6 and 7 apply to special occupancies, special equipment or other special conditions and may supplement or modify the general rules. Chapter 8 stands alone unless a rule is specifically referenced.
Reference: NFPA 70, National Electrical Code, 2020, 90.3
A 120/240-volt single-phase panelboard is mounted on a basement wall. A grounded concrete wall is on the opposite side of the working space, and the panel has no live parts opposite. What is the minimum depth of the working space in front of the panelboard?
Answer: 3 ft
Voltage to ground on a 120/240-volt system is 120 volts, so the 0-150 volt row of Table 110.26(A)(1) applies. For that row the minimum depth is 3 ft under all three conditions, so the grounded concrete wall does not increase it. The 3 1/2 ft and 4 ft figures belong to the 151-600 volt row.
Reference: NFPA 70, National Electrical Code, 2020, Table 110.26(A)(1)
Which of these dwelling-unit rooms is NOT on the list of areas where 210.12(A) requires arc-fault circuit-interrupter protection for 120-volt, 15- and 20-ampere branch circuits?
Answer: Bathrooms
Section 210.12(A) lists kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas and similar rooms or areas. Bathrooms are not on that list; they require GFCI protection under 210.8 instead.
Reference: NFPA 70, National Electrical Code, 2020, 210.12(A)
What is the minimum rating of the service disconnecting means for a one-family dwelling?
Answer: 100 A, 3-wire
Section 230.79(C) sets the minimum service disconnect rating for a one-family dwelling at 100 amperes, 3-wire. The 60-ampere minimum in 230.79(D) is for installations other than one-family dwellings, and 150 A or a 4-wire rating is not what the section requires.
Reference: NFPA 70, National Electrical Code, 2020, 230.79(C)
What is the maximum overcurrent protection for 12 AWG copper branch-circuit conductors, unless a specific rule allows otherwise?
Answer: 20 A
Section 240.4(D)(5) limits 12 AWG copper to 20 A overcurrent protection after correction and adjustment factors. 14 AWG is limited to 15 A (240.4(D)(3)) and 10 AWG copper to 30 A (240.4(D)(7)).
Reference: NFPA 70, National Electrical Code, 2020, 240.4(D)
A concrete-encased electrode in a house footing is made of reinforcing steel. What is the minimum length and size of rebar needed to count as the electrode?
Answer: At least 20 ft of one or more bars not less than 1/2 in. in diameter
Section 250.52(A)(3) describes the concrete-encased electrode as at least 20 ft of one or more steel reinforcing bars or rods not less than 1/2 in. in diameter (or 20 ft of bare copper conductor 4 AWG or larger), encased by at least 2 in. of concrete in direct contact with the earth. 10 ft and 1/4 in. do not meet it.
Reference: NFPA 70, National Electrical Code, 2020, 250.52(A)(3)
After the first support within 12 in. of a box, what is the maximum spacing for securing Type NM cable run along wood framing?
Answer: 4 1/2 ft
Section 334.30 requires NM cable to be secured by staples, straps or similar fittings within 12 in. of every cable entry into a box and at intervals not exceeding 4 1/2 ft. The 6 ft interval is for MC cable and 10 ft is the EMT support interval.
Reference: NFPA 70, National Electrical Code, 2020, 334.30
A 1 hp, 115-volt, single-phase motor has a full-load current of 16 A from Table 430.248. What is the minimum ampacity of the branch-circuit conductors for this single motor?
Answer: 20 A
Section 430.22 requires branch-circuit conductors for a single motor to have an ampacity of at least 125 percent of the motor full-load current: 16 x 1.25 = 20 A. 16 A omits the 125 percent factor, 24 A uses 150 percent, and 28 A uses 175 percent, which is a protective-device multiplier, not a conductor multiplier.
Reference: NFPA 70, National Electrical Code, 2020, 430.22; Table 430.248
Three resistors of 10, 15 and 20 ohms are connected in series across a 90-volt source. What is the circuit current?
Answer: 2 A
In series, resistances add: 10 + 15 + 20 = 45 ohms. Current = 90 / 45 = 2 A, and it is the same through every resistor in a series circuit. Using one resistor alone, 90 / 10 = 9 A, is a common mistake.
Reference: General electrical theory, Series circuits
Sources
- PSI: Washington Electrical Candidate Information Bulletin (10/30/2025) (opens in a new tab)
- Washington L&I: Electrical exam information (opens in a new tab)
Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.