Requirements at a glance
| Agency | Washington State Department of Labor & Industries (L&I) Electrical Program; exams by PSI |
|---|---|
| Exam | NEC and Theory: 34 questions, 2 hours. WA Codes: 17 questions, 1 hour. 70% on each, open book |
| Books allowed | 2020 NEC, printed RCW 19.28 and WAC 296-46B in a three-ring binder, and any original copyrighted reference (Ugly's, Ferm's). Permanent tabs only, no handwritten notes |
| Fees | PSI fees are on the exam details above; L&I application and certificate fees are separate. |
| Timing | Pass all sections within 1 year. Wait 14 days after a fail; after 3 fails of a section, 3 months. |
Electrical trainees applying to L&I for the 06 limited energy system certificate (fire alarm, security, data and telecom, sound, nurse call, lighting and building controls and other low-voltage circuits), which needs 4,000 hours of supervised experience.
Official links
- Washington L&I: Electrical exam information (opens in a new tab)
- PSI: schedule Washington electrical exams (opens in a new tab)
- PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)
- Chapter 19.28 RCW (electricians and electrical installations) (opens in a new tab)
- Chapter 296-46B WAC (electrical safety standards and certification) (opens in a new tab)
How to get licensed, step by step
Get approved (or register)
Apply to L&I with 4,000 documented hours of limited energy experience. L&I's eligibility notice gives you the Exam Unique ID you use to register with PSI.
Washington L&I: Electrical exam information (opens in a new tab)
Print the law and get your books
Print RCW 19.28 and WAC 296-46B, hole-punch them into a three-ring binder and tab them. Bring a 2020 NEC (not 2023) and any copyrighted references you like.
Chapter 19.28 RCW (electricians and electrical installations) (opens in a new tab)Chapter 296-46B WAC (electrical safety standards and certification) (opens in a new tab)
Schedule with PSI
Schedule online or at 855-834-8751. Book all sections of your exam for the same day.
PSI: schedule Washington electrical exams (opens in a new tab)PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)
Pass every section
70% on each section; you retest only the sections you fail. Your score appears on screen right away.
PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)
How to prepare
- Washington's exam tests the 2020 NEC, not the 2023 NEC used on job sites. Study and tab a 2020 code book.
- The WA Codes section (17 questions, 1 hour) is scored on its own. Tab WAC 296-46B's certification, supervision and permit sections (the -900s) and know RCW 19.28's basics.
- Articles 705-780 (including 725 Class 1, 2 and 3 circuits and 760 fire alarm) are the biggest NEC area (6), then wiring methods (5) and communications, Articles 800-830 (3). Know the 06 scope in WAC 296-46B-920.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2020 NEC and RCW 19.28 and WAC 296-46B. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2020 EditionEssential
Washington's exam uses the 2020 edition, not the 2023 NEC enforced on job sites. Permanent tabs only.
Chapter 19.28 RCW and Chapter 296-46B WAC (Washington electrical law and rules)Essential
Print them free and bring them hole-punched in a three-ring binder; every exam has a WA Codes section (17 questions, 20 for master).
Ugly's Electrical References (or another copyrighted quick reference)
Any original copyrighted reference is allowed in the room; handy for theory and formulas.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC), 2020 edition
- Chapter 19.28 RCW (Washington electrical law), current version
- Chapter 296-46B WAC (Washington electrical rules), current version
- Any original copyrighted electrical reference, e.g. Ugly's Electrical References or Ferm's Fast Finder (allowed in the exam room)
What's on the exam
Official content outline from PSI, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| NEC and Theory(34 items, 34 scored · 120 min) | ||
| Article 90: Introduction | 1 | |
| Articles 100-110: General Requirements | 2 | |
| Articles 200-225, 280-285: Wiring and Protection | 1 | |
| Article 240: Overcurrent Protection | 3 | |
| Article 250: Grounding and Bonding | 3 | |
| Articles 300-398: Wiring Methods | 5 | |
| Articles 400-427, 455-480: Electrical Equipment | 3 | |
| Articles 430-450: Motors, HVAC, Generators and Transformers | 1 | |
| Articles 500-516: Hazardous Locations | 2 | |
| Articles 600-695: Special Equipment | 1 | |
| Articles 705-780: Special Conditions | 6 | |
| Articles 800-830: Communications Systems | 3 | |
| General Trade Knowledge and Theory | 3 | |
| WA Codes(17 items, 17 scored · 60 min) | ||
| Washington Laws and Rules (RCW 19.28 and WAC 296-46B) | 17 | |
The parts are timed and scored separately, and you must pass each one. Our simulations score each part the same way and give you the combined time (180 minutes).
Exam day details
- Administered by PSI, for the Washington State Department of Labor & Industries (L&I) Electrical Program.
- Fee: $65 to PSI for the 3-hour exam (PSI bills electrician exams by the hour ($45 for 1 hour up to $105 for 7 hours); retests are billed by the hour too). L&I's application fee is separate.
- Two sections: NEC and Theory (34 questions, 2 hours) and WA Codes (17 questions, 1 hour). 70% to pass each.
- Open book. Bring the 2020 NEC, printed copies of RCW 19.28 and WAC 296-46B in a three-ring binder, and any original copyrighted reference (Ugly's, Ferm's and so on). Highlighting, underlining and permanent tabs only: no handwritten notes, sticky notes or removable tabs. A silent, nonprogrammable calculator is allowed.
- The exam is based on the 2020 NEC, even though Washington has enforced the 2023 NEC on job sites since April 1, 2024 (and adopts the 2026 NEC on December 31, 2026). Rules that changed in 2023 can give a wrong answer here.
- The 06 specialty is limited to signaling and power-limited (low-voltage) circuits: telecommunications, fire alarm, intrusion alarm, energy management and controls, sound and similar systems (WAC 296-46B-920). Special conditions (Articles 705-780, including 725 and 760) and communications (800-830) carry the most weight.
- Get L&I approval first and register with PSI using your Exam Unique ID. You have 1 year from approval to pass all sections.
- 70% on each section. Passed sections carry over: you retest only the sections you failed, within 1 year of your first attempt. Wait 14 days after a fail; after 3 fails of a section, wait 3 months between attempts.
- Up to 10 unscored experimental questions may be added; their time does not count against you.
Frequently asked questions
What's on the Washington limited energy (06) exam?
PSI's 06 electrician outline. NEC and Theory, 34 questions: Article 90: Introduction 1; Articles 100-110: General Requirements 2; Articles 200-225, 280-285: Wiring and Protection 1; Article 240: Overcurrent Protection 3; Article 250: Grounding and Bonding 3; Articles 300-398: Wiring Methods 5; Articles 400-427, 455-480: Electrical Equipment 3; Articles 430-450: Motors, HVAC, Generators and Transformers 1; Articles 500-516: Hazardous Locations 2; Articles 600-695: Special Equipment 1; Articles 705-780: Special Conditions 6; Articles 800-830: Communications Systems 3; General Trade Knowledge and Theory 3. WA Codes: 17 questions on RCW 19.28 and WAC 296-46B.
What work does the Washington 06 certificate cover?
Installation, repair and maintenance of signaling and power-limited circuits only: telecommunications, HVAC/R low-voltage wiring, fire alarm, intrusion alarm, energy management and automation controls, lighting controls, amplified sound and public address (WAC 296-46B-920). It needs 4,000 hours of supervised experience.
Which NEC edition is the Washington electrical exam on?
The 2020 NEC, plus the current RCW 19.28 and WAC 296-46B. PSI's bulletin and L&I's exam page both say 2020, even though Washington enforces the 2023 NEC on job sites. Bring a 2020 NEC.
Free questions with answers
Show all 10 free questions and answers
An 06 specialty electrician removes and reconnects a line voltage connection to a like-in-kind replacement component inside a control cabinet. Under WAC 296-46B-920, what is the maximum line voltage circuit for this work, which must also have a means of disconnect?
Answer: 120 volts, 20 amperes
WAC 296-46B-920(2)(e)(i) limits the line voltage circuit in this situation to 120 volts, 20 amperes maximum, with a means of disconnect, and the replacement must be like-in-kind or the manufacturer's authorized component. The 600-volt, 20-ampere figure belongs to the door, gate and similar systems (10) specialty's operator control panel rule, not the 06 specialty.
Reference: Chapter 296-46B WAC, WAC 296-46B-920(2)(e)(i)
A 120-volt fire alarm control unit with a hinged door is mounted on a wall where it will be examined and serviced while energized. What minimum depth of working space does Table 110.26(A)(1) require in front of it?
Answer: 3 feet
For equipment operating at 0 to 150 volts nominal to ground, Table 110.26(A)(1) requires 900 mm (3 ft) of working space depth for Conditions 1, 2 and 3. 3 1/2 ft and 4 ft are the Condition 2 and 3 depths for 151 to 600 volts. The working space must also be at least 30 in wide and allow the door to open 90 degrees.
Reference: NFPA 70, National Electrical Code, 2020, Table 110.26(A)(1)
A building's 277-volt fluorescent lighting circuits will be switched on and off each day by operating their circuit breakers, with no separate switch or lighting control relay. What marking must those breakers have?
Answer: SWD or HID
Section 240.83(D) requires circuit breakers used as switches in 120-volt and 277-volt fluorescent lighting circuits to be listed and marked SWD or HID; breakers used as switches in high-intensity discharge circuits must be marked HID. HACR is a marking for heating, air-conditioning and refrigeration equipment, and CL2 is a cable marking.
Reference: NFPA 70, National Electrical Code, 2020, 240.83(D)
An intersystem bonding termination device is installed at a building's service for communications and CATV bonding. Under 250.94(A), for at least how many intersystem bonding conductors must it have connection capacity?
Answer: Three
Section 250.94(A) requires the intersystem bonding termination device to be accessible and to consist of a set of terminals with the capacity for connecting not less than three intersystem bonding conductors, such as those for communications, CATV and antenna or broadband systems. It must be securely mounted and electrically connected as the section describes.
Reference: NFPA 70, National Electrical Code, 2020, 250.94(A)
A Class 2 thermostat cable serves a rooftop HVAC unit. May the installer cable-tie it to the EMT that carries the unit's power supply conductors?
Answer: Yes, since the cable only serves that unit's controls
Section 300.11(C) generally prohibits using raceways as a means of support for other raceways or cables, but 300.11(C)(2) permits a raceway that contains power supply conductors for electrically controlled equipment to support Class 2 cables used solely to connect to that equipment's control circuits. A thermostat cable for the unit fed by that EMT fits this exception.
Reference: NFPA 70, National Electrical Code, 2020, 300.11(C)(2)
A technician wants to run a flexible cord through a hole in a wall to power a camera system power supply in the next room. What does 400.12 say?
Answer: Not permitted; cords may not run through holes in walls
Section 400.12 lists uses not permitted for flexible cords, including as a substitute for the fixed wiring of a structure and run through holes in walls, structural ceilings, suspended ceilings, dropped ceilings or floors. Cord type, a bushing or a short length does not make this use acceptable; fixed wiring and a receptacle near the equipment are needed.
Reference: NFPA 70, National Electrical Code, 2020, 400.12
An intrusion alarm system is being installed at a grain elevator where combustible grain dust is present in hazardous amounts. Under Article 500, how is that area classified?
Answer: Class II
Section 500.5(C) defines Class II locations as those that are hazardous because of combustible dust. Class I (500.5(B)) is for flammable gases, vapors or liquids, and Class III (500.5(D)) is for ignitible fibers or flyings. Zone 0 is a gas classification under Article 505.
Reference: NFPA 70, National Electrical Code, 2020, 500.5(C)
What marking does 725.124 require on equipment that supplies Class 2 or Class 3 circuits?
Answer: Each circuit that is Class 2 or Class 3, plainly visible
Section 725.124 requires equipment supplying Class 2 or Class 3 circuits to be durably marked where plainly visible to indicate each circuit that is a Class 2 or Class 3 circuit. Red breaker identification is a fire alarm branch circuit rule (760.41(B) and 760.121(B)).
Reference: NFPA 70, National Electrical Code, 2020, 725.124
Communications cables are run on the outside of a building that has a lightning protection system. Where practicable, what separation does 800.53 call for between the communications cables and the lightning conductors?
Answer: 6 ft
Section 800.53 calls for a separation of at least 1.8 m (6 ft), where practicable, between communications wires and cables on buildings and lightning conductors. This reduces the chance of a lightning strike arcing over to the communications circuit.
Reference: NFPA 70, National Electrical Code, 2020, 800.53
A fire alarm panel draws 0.5 A in standby and 2.0 A in alarm. Batteries must carry 24 hours of standby and then 5 minutes of alarm. Ignoring any safety factor, what battery capacity is required?
Answer: 12.17 Ah
Standby: 0.5 A x 24 h = 12.00 Ah. Alarm: 2.0 A x (5 / 60) h = 0.167 Ah. Total = 12.00 + 0.167 = 12.17 Ah. Leaving out the alarm load gives 12.00 Ah, treating 5 minutes as 1 hour gives 14.00 Ah, and treating it as 5 hours gives 22.00 Ah.
Reference: General electrical theory, Battery capacity (ampere-hours = amperes x hours)
Sources
- PSI: Washington Electrical Candidate Information Bulletin (10/30/2025) (opens in a new tab)
- Washington L&I: Electrical exam information (opens in a new tab)
Questions last verified November 4, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.