Washington licensing exam

Washington Electrical Administrator Exam (01 General EA): Practice Test & Licensing Guide

Washington's 01 general electrical administrator exam: 65 NEC and theory questions, 17 Washington law questions and 10 major load calculations, in three timed sections. Open book, 2020 NEC, 70% on each section.

Questions
92
Time limit
7 hours
Passing score
70% per part

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Articles 100-110: General Requirements

A 480-volt motor control center is 7 feet tall. Under 110.26(A)(3), what is the minimum height of the working space in front of it?

Requirements at a glance

AgencyWashington State Department of Labor & Industries (L&I) Electrical Program; exams by PSI
ExamNEC and Theory: 65 questions, 4 hours. WA Codes: 17 questions, 1 hour. Major Load Calculations: 10 questions, 2 hours. 70% on each, open book
Books allowed2020 NEC, printed RCW 19.28 and WAC 296-46B in a three-ring binder, and any original copyrighted reference (Ugly's, Ferm's). Permanent tabs only, no handwritten notes
FeesPSI fees are on the exam details above; L&I application and certificate fees are separate.
TimingPass all sections within 1 year. Wait 14 days after a fail; after 3 fails of a section, 3 months.

Anyone who wants to be the designated electrical administrator for a Washington electrical contractor. No experience or L&I approval is needed to test. The administrator certificate does not let you do electrical work.

How to get licensed, step by step

  1. Get approved (or register)

    No L&I approval or experience is needed: register directly with PSI using your SSN as your ID. Apply for the certificate within 90 days of your last passing score.

    Washington L&I: Electrical exam information (opens in a new tab)

  2. Print the law and get your books

    Print RCW 19.28 and WAC 296-46B, hole-punch them into a three-ring binder and tab them. Bring a 2020 NEC (not 2023) and any copyrighted references you like.

    Chapter 19.28 RCW (electricians and electrical installations) (opens in a new tab)Chapter 296-46B WAC (electrical safety standards and certification) (opens in a new tab)

  3. Schedule with PSI

    Schedule online or at 855-834-8751. Book all sections of your exam for the same day.

    PSI: schedule Washington electrical exams (opens in a new tab)PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)

  4. Pass every section

    70% on each section; you retest only the sections you fail. Your score appears on screen right away.

    PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)

How to prepare

  • Washington's exam tests the 2020 NEC, not the 2023 NEC used on job sites. Study and tab a 2020 code book.
  • The WA Codes section (17 questions, 1 hour) is scored on its own. Tab WAC 296-46B's certification, supervision and permit sections (the -900s) and know RCW 19.28's basics.
  • The load calculation section is 10 questions in 2 hours. Practice Article 220 dwelling and commercial service and feeder calculations until you can do one in about 10 minutes.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2020 NEC and RCW 19.28 and WAC 296-46B. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NFPA 70: National Electrical Code (NEC), 2020 EditionEssential

    Washington's exam uses the 2020 edition, not the 2023 NEC enforced on job sites. Permanent tabs only.

    NFPA store (opens in a new tab)

  • Chapter 19.28 RCW and Chapter 296-46B WAC (Washington electrical law and rules)Essential

    Print them free and bring them hole-punched in a three-ring binder; every exam has a WA Codes section (17 questions, 20 for master).

    WAC 296-46B (Washington Legislature) (opens in a new tab)

  • Ugly's Electrical References (or another copyrighted quick reference)

    Any original copyrighted reference is allowed in the room; handy for theory and formulas.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC), 2020 edition
  • Chapter 19.28 RCW (Washington electrical law), current version
  • Chapter 296-46B WAC (Washington electrical rules), current version
  • Any original copyrighted electrical reference, e.g. Ugly's Electrical References or Ferm's Fast Finder (allowed in the exam room)

What's on the exam

Official content outline from PSI, (number of questions per topic):

TopicQuestions
NEC and Theory(65 items, 65 scored · 240 min)
Article 90: Introduction2
Articles 100-110: General Requirements3
Articles 200-225, 280-285: Wiring and Protection3
Article 230: Services5
Article 240: Overcurrent Protection6
Article 250: Grounding and Bonding6
Articles 300-398: Wiring Methods10
Articles 400-427, 455-480: Electrical Equipment3
Articles 430-450: Motors, HVAC, Generators and Transformers4
Article 490: Equipment Over 1000 Volts1
Articles 500-516: Hazardous Locations3
Articles 517-590: Special Occupancies4
Articles 600-695: Special Equipment3
Articles 700-702: Emergency and Standby Systems2
Articles 705-780: Special Conditions1
Articles 800-830: Communications Systems1
General Trade Knowledge and Theory8
WA Codes(17 items, 17 scored · 60 min)
Washington Laws and Rules (RCW 19.28 and WAC 296-46B)17
Major Load Calculations(10 items, 10 scored · 120 min)
Major Load Calculations (Article 220)10

The parts are timed and scored separately, and you must pass each one. Our simulations score each part the same way and give you the combined time (420 minutes).

Exam day details

  • Administered by PSI, for the Washington State Department of Labor & Industries (L&I) Electrical Program.
  • Fee: PSI bills administrator exams at a flat rate, whatever the number of sections or time used; retests within a year are billed by the hour. L&I's certificate fee is separate.
  • Three sections: NEC and Theory (65 questions, 4 hours), WA Codes (17 questions, 1 hour) and Major Load Calculations (10 questions, 2 hours). 70% to pass each.
  • Open book. Bring the 2020 NEC, printed copies of RCW 19.28 and WAC 296-46B in a three-ring binder, and any original copyrighted reference (Ugly's, Ferm's and so on). Highlighting, underlining and permanent tabs only: no handwritten notes, sticky notes or removable tabs. A silent, nonprogrammable calculator is allowed.
  • The exam is based on the 2020 NEC, even though Washington has enforced the 2023 NEC on job sites since April 1, 2024 (and adopts the 2026 NEC on December 31, 2026). Rules that changed in 2023 can give a wrong answer here.
  • Register directly with PSI; no L&I approval or experience is needed. Pass all sections within 1 year, then apply for the certificate within 90 days of your last passing score to avoid retesting.
  • 70% on each section. Passed sections carry over: you retest only the sections you failed, within 1 year of your first attempt. Wait 14 days after a fail; after 3 fails of a section, wait 3 months between attempts.
  • Up to 10 unscored experimental questions may be added; their time does not count against you.

Frequently asked questions

What's on the Washington electrical administrator exam?

PSI's 01 administrator outline. NEC and Theory, 65 questions: Article 90: Introduction 2; Articles 100-110: General Requirements 3; Articles 200-225, 280-285: Wiring and Protection 3; Article 230: Services 5; Article 240: Overcurrent Protection 6; Article 250: Grounding and Bonding 6; Articles 300-398: Wiring Methods 10; Articles 400-427, 455-480: Electrical Equipment 3; Articles 430-450: Motors, HVAC, Generators and Transformers 4; Article 490: Equipment Over 1000 Volts 1; Articles 500-516: Hazardous Locations 3; Articles 517-590: Special Occupancies 4; Articles 600-695: Special Equipment 3; Articles 700-702: Emergency and Standby Systems 2; Articles 705-780: Special Conditions 1; Articles 800-830: Communications Systems 1; General Trade Knowledge and Theory 8. WA Codes: 17 questions on RCW 19.28 and WAC 296-46B. Major Load Calculations: 10 questions.

Do I need experience to take the Washington administrator exam?

No. Administrator candidates register directly with PSI with no L&I approval. The certificate lets you be a contractor's designated administrator; it does not let you do electrical work.

Which NEC edition is the Washington electrical exam on?

The 2020 NEC, plus the current RCW 19.28 and WAC 296-46B. PSI's bulletin and L&I's exam page both say 2020, even though Washington enforces the 2023 NEC on job sites. Bring a 2020 NEC.

Free questions with answers

Show all 10 free questions and answers
  1. A 480-volt motor control center is 7 feet tall. Under 110.26(A)(3), what is the minimum height of the working space in front of it?

    Answer: 7 feet (2.1 m), the equipment height

    110.26(A)(3) requires the working space height to be the height of the equipment or 6-1/2 ft (2.0 m), whichever is greater. Because this equipment is 7 ft tall, the working space must be at least 7 ft high. Do not confuse this with the 6 ft dedicated equipment space above the equipment in 110.26(E).

    Reference: NFPA 70, National Electrical Code, 2020, 110.26(A)(3)

  2. Service conductors of 120/240 volts pass beside a second-story window that can be opened. What is the minimum clearance from the window required by 230.9(A)?

    Answer: 3 feet (900 mm) from the window

    230.9(A) requires service conductors installed as open conductors or multiconductor cable without an overall outer jacket to keep at least 3 ft clear from windows designed to be opened, doors, porches, balconies, ladders, stairs, fire escapes or similar locations. Conductors run above the top level of a window are permitted to be less than 3 ft from it.

    Reference: NFPA 70, National Electrical Code, 2020, 230.9(A)

  3. A feeder conductor has an adjusted ampacity of 38 amperes after derating. The circuit is not a multioutlet branch circuit for cord-and-plug-connected portable loads and the protective device is rated under 800 amperes. Which is the largest standard overcurrent device that 240.4(B) allows?

    Answer: 40 amperes

    240.4(B) allows the next higher standard rating in 240.6(A) when the ampacity does not match a standard rating, the conductors are not part of a multioutlet branch circuit supplying cord-and-plug-connected portable loads, and the next higher rating does not exceed 800 A. Next standard size above 38 A is 40 A. 45 A is two sizes up.

    Reference: NFPA 70, National Electrical Code, 2020, 240.4(B); 240.6(A)

  4. A feeder is protected by a 200-ampere circuit breaker and the feeder conductors are copper. Using Table 250.122, what is the minimum size of the copper equipment grounding conductor?

    Answer: 6 AWG

    Table 250.122 is based on the rating of the overcurrent device ahead of the equipment. For a 200 A device the minimum copper EGC is 6 AWG. 100 A is 8 AWG, 300 A is 4 AWG and 400 A is 3 AWG.

    Reference: NFPA 70, National Electrical Code, 2020, 250.122; Table 250.122

  5. Type NM cable is run through bored holes in 2x4 wood studs. What is the minimum distance from the edge of the stud to the nearest edge of the hole, if no protective steel plate is used?

    Answer: 1-1/4 inches

    300.4(A)(1) requires bored holes to be at least 1-1/4 in. from the nearest edge of the wood member, or the cable must be protected from penetration by a steel plate or bushing at least 1/16 in. thick. A 2x4 is 3-1/2 in. wide, so 1-1/4 in. from either edge leaves room for the hole.

    Reference: NFPA 70, National Electrical Code, 2020, 300.4(A)(1)

  6. A 460-volt, 3-phase, 25-horsepower squirrel-cage motor (Design B) has a full-load current of 34 amperes in Table 430.250. Using an inverse-time circuit breaker, and without the higher setting allowed when the motor will not start (430.52(C)(1) Exception No. 2), what is the maximum rating permitted for branch-circuit short-circuit and ground-fault protection under 430.52?

    Answer: 90 amperes

    Table 430.52 permits an inverse-time breaker up to 250 percent of the full-load current: 34 x 2.5 = 85 A. Since 85 A is not a standard size, 430.52(C)(1) Exception 1 allows the next higher standard rating, 90 A (240.6(A)). Dropping to 80 A may not allow the motor to start, and 70 A is the 200 percent figure.

    Reference: NFPA 70, National Electrical Code, 2020, 430.52(C)(1); Table 430.52; 240.6(A)

  7. What does 517.13 require for branch circuits serving patient care spaces of a health care facility, as the means of providing an effective ground-fault current path?

    Answer: A metal raceway or armored cable that qualifies as an EGC, plus an insulated copper equipment grounding conductor

    517.13(A) requires branch circuits in patient care spaces to be installed in a metal raceway system or a cable with a metallic armor or sheath that qualifies as an equipment grounding conductor under 250.118, and 517.13(B) adds an insulated copper equipment grounding conductor sized per 250.122. This gives two redundant grounding paths. Grounded conductors cannot serve as the EGC.

    Reference: NFPA 70, National Electrical Code, 2020, 517.13(A), (B)

  8. A 2-wire, 240-volt single-phase circuit of 12 AWG copper (K = 12.9 ohms-cmil/ft, 6,530 circular mils) carries 16 amperes over a distance of 100 feet one way. What is the approximate voltage drop?

    Answer: 6.3 volts

    Voltage drop for a single-phase circuit = 2 x K x I x L / cmil = 2 x 12.9 x 16 x 100 / 6,530 = 41,280 / 6,530 = 6.32 V, which is about 2.6 percent of 240 V. Leaving out the factor of 2 (3.2 V) ignores the return conductor. The Informational Note to 210.19(A) suggests a 3 percent maximum on branch circuits.

    Reference: General electrical theory, Voltage drop (V = 2KIL / cmil)

  9. An administrator decides to leave the electrical contractor for which the administrator is designated. Under RCW 19.28.061(5), what must the administrator do?

    Answer: Notify the department in writing within ten days of ending the relationship

    RCW 19.28.061(5)(f) requires the designated master electrician or administrator to notify the department in writing within ten days if the administrator terminates the relationship with the electrical contractor. The contractor's license then becomes void within ninety days unless another administrator or master electrician is qualified (RCW 19.28.061(1)).

    Reference: Revised Code of Washington (RCW) chapter 19.28, RCW 19.28.061(5)(f)

  10. A one-family dwelling has 2,400 square feet of living area. Using the standard method, what is the net demand load, in volt-amperes, for the general lighting (3 VA per square foot), two 1,500-VA small-appliance circuits and one 1,500-VA laundry circuit after applying Table 220.42 demand factors?

    Answer: 6,045 VA

    General lighting 2,400 x 3 = 7,200 VA. Add the small-appliance loads (2 x 1,500 = 3,000 VA, 220.52(A)) and laundry (1,500 VA, 220.52(B)): 7,200 + 3,000 + 1,500 = 11,700 VA. Table 220.42 for dwellings: first 3,000 VA at 100 percent = 3,000; remaining 8,700 VA at 35 percent = 3,045. Net demand = 3,000 + 3,045 = 6,045 VA. The 11,700 VA total has no demand factor applied.

    Reference: NFPA 70, National Electrical Code, 2020, 220.12; 220.52; Table 220.42