Washington licensing exam

Washington HVAC/R Electrician Exam (06A Specialty): Practice Test & Licensing Guide

Washington's 06A HVAC/refrigeration specialty electrician exam: 34 NEC and theory questions (2 hours) plus 17 Washington law questions on RCW 19.28 and WAC 296-46B (1 hour). Open book, 2020 NEC, 70% on each section.

Questions
51
Time limit
3 hours
Passing score
70% per part

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Washington Laws and Rules (RCW 19.28 and WAC 296-46B)

Under the 06A HVAC/refrigeration scope, what may an unsupervised electrical trainee NOT do?

Requirements at a glance

AgencyWashington State Department of Labor & Industries (L&I) Electrical Program; exams by PSI
ExamNEC and Theory: 34 questions, 2 hours. WA Codes: 17 questions, 1 hour. 70% on each, open book
Books allowed2020 NEC, printed RCW 19.28 and WAC 296-46B in a three-ring binder, and any original copyrighted reference (Ugly's, Ferm's). Permanent tabs only, no handwritten notes
FeesPSI fees are on the exam details above; L&I application and certificate fees are separate.
TimingPass all sections within 1 year. Wait 14 days after a fail; after 3 fails of a section, 3 months.

HVAC and refrigeration technicians applying to L&I for the 06A HVAC/refrigeration specialty electrician certificate, which covers the power and control wiring within HVAC/R equipment and needs 4,000 hours of supervised experience.

How to get licensed, step by step

  1. Get approved (or register)

    Apply to L&I with 4,000 documented hours of HVAC/R electrical experience. L&I's eligibility notice gives you the Exam Unique ID you use to register with PSI.

    Washington L&I: Electrical exam information (opens in a new tab)

  2. Print the law and get your books

    Print RCW 19.28 and WAC 296-46B, hole-punch them into a three-ring binder and tab them. Bring a 2020 NEC (not 2023) and any copyrighted references you like.

    Chapter 19.28 RCW (electricians and electrical installations) (opens in a new tab)Chapter 296-46B WAC (electrical safety standards and certification) (opens in a new tab)

  3. Schedule with PSI

    Schedule online or at 855-834-8751. Book all sections of your exam for the same day.

    PSI: schedule Washington electrical exams (opens in a new tab)PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)

  4. Pass every section

    70% on each section; you retest only the sections you fail. Your score appears on screen right away.

    PSI Washington Electrical Candidate Information Bulletin (opens in a new tab)

How to prepare

  • Washington's exam tests the 2020 NEC, not the 2023 NEC used on job sites. Study and tab a 2020 code book.
  • The WA Codes section (17 questions, 1 hour) is scored on its own. Tab WAC 296-46B's certification, supervision and permit sections (the -900s) and know RCW 19.28's basics.
  • Motors, HVAC and transformers (Articles 430-450), overcurrent, grounding, wiring methods, equipment and theory each have 4 questions. Tab Article 440: MCA, MOCP and disconnect rules for air conditioning equipment.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2020 NEC and RCW 19.28 and WAC 296-46B. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NFPA 70: National Electrical Code (NEC), 2020 EditionEssential

    Washington's exam uses the 2020 edition, not the 2023 NEC enforced on job sites. Permanent tabs only.

    NFPA store (opens in a new tab)

  • Chapter 19.28 RCW and Chapter 296-46B WAC (Washington electrical law and rules)Essential

    Print them free and bring them hole-punched in a three-ring binder; every exam has a WA Codes section (17 questions, 20 for master).

    WAC 296-46B (Washington Legislature) (opens in a new tab)

  • Ugly's Electrical References (or another copyrighted quick reference)

    Any original copyrighted reference is allowed in the room; handy for theory and formulas.

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code (NEC), 2020 edition
  • Chapter 19.28 RCW (Washington electrical law), current version
  • Chapter 296-46B WAC (Washington electrical rules), current version
  • Any original copyrighted electrical reference, e.g. Ugly's Electrical References or Ferm's Fast Finder (allowed in the exam room)

What's on the exam

Official content outline from PSI, (number of questions per topic):

TopicQuestions
NEC and Theory(34 items, 34 scored · 120 min)
Article 90: Introduction1
Articles 100-110: General Requirements2
Articles 200-225, 280-285: Wiring and Protection2
Article 240: Overcurrent Protection4
Article 250: Grounding and Bonding4
Articles 300-398: Wiring Methods4
Articles 400-427, 455-480: Electrical Equipment4
Articles 430-450: Motors, HVAC, Generators and Transformers4
Article 490: Equipment Over 1000 Volts1
Articles 500-516: Hazardous Locations1
Articles 600-695: Special Equipment1
Articles 705-780: Special Conditions2
General Trade Knowledge and Theory4
WA Codes(17 items, 17 scored · 60 min)
Washington Laws and Rules (RCW 19.28 and WAC 296-46B)17

The parts are timed and scored separately, and you must pass each one. Our simulations score each part the same way and give you the combined time (180 minutes).

Exam day details

  • Administered by PSI, for the Washington State Department of Labor & Industries (L&I) Electrical Program.
  • Fee: $65 to PSI for the 3-hour exam (PSI bills electrician exams by the hour ($45 for 1 hour up to $105 for 7 hours); retests are billed by the hour too). L&I's application fee is separate.
  • Two sections: NEC and Theory (34 questions, 2 hours) and WA Codes (17 questions, 1 hour). 70% to pass each.
  • Open book. Bring the 2020 NEC, printed copies of RCW 19.28 and WAC 296-46B in a three-ring binder, and any original copyrighted reference (Ugly's, Ferm's and so on). Highlighting, underlining and permanent tabs only: no handwritten notes, sticky notes or removable tabs. A silent, nonprogrammable calculator is allowed.
  • The exam is based on the 2020 NEC, even though Washington has enforced the 2023 NEC on job sites since April 1, 2024 (and adopts the 2026 NEC on December 31, 2026). Rules that changed in 2023 can give a wrong answer here.
  • The 06A specialty covers HVAC/R equipment: line-voltage components inside the equipment and its Class 2 control wiring, but not line-voltage disconnects or controllers outside the equipment (WAC 296-46B-920). Motors, HVAC equipment and transformers (Articles 430-450, including Article 440) are a core area.
  • Get L&I approval first and register with PSI using your Exam Unique ID. You have 1 year from approval to pass all sections.
  • 70% on each section. Passed sections carry over: you retest only the sections you failed, within 1 year of your first attempt. Wait 14 days after a fail; after 3 fails of a section, wait 3 months between attempts.
  • Up to 10 unscored experimental questions may be added; their time does not count against you.

Frequently asked questions

What's on the Washington HVAC/R (06A) electrician exam?

PSI's 06A electrician outline. NEC and Theory, 34 questions: Article 90: Introduction 1; Articles 100-110: General Requirements 2; Articles 200-225, 280-285: Wiring and Protection 2; Article 240: Overcurrent Protection 4; Article 250: Grounding and Bonding 4; Articles 300-398: Wiring Methods 4; Articles 400-427, 455-480: Electrical Equipment 4; Articles 430-450: Motors, HVAC, Generators and Transformers 4; Article 490: Equipment Over 1000 Volts 1; Articles 500-516: Hazardous Locations 1; Articles 600-695: Special Equipment 1; Articles 705-780: Special Conditions 2; General Trade Knowledge and Theory 4. WA Codes: 17 questions on RCW 19.28 and WAC 296-46B.

Do HVAC technicians in Washington need an electrical certificate?

Yes, to do the electrical work on HVAC/R equipment. The 06A HVAC/refrigeration specialty covers the line-voltage components within the equipment and its low-voltage control wiring; it needs 4,000 hours of supervised experience. The 06B restricted certificate is narrower and has its own shorter exam.

Which NEC edition is the Washington electrical exam on?

The 2020 NEC, plus the current RCW 19.28 and WAC 296-46B. PSI's bulletin and L&I's exam page both say 2020, even though Washington enforces the 2023 NEC on job sites. Bring a 2020 NEC.

Free questions with answers

Show all 10 free questions and answers
  1. Under the 06A HVAC/refrigeration scope, what may an unsupervised electrical trainee NOT do?

    Answer: Work on any part of a system containing a circuit rated over 600 volts, energized or not

    WAC 296-46B-920(2)(f)(iii)(A) says no unsupervised electrical trainee can install, repair, replace or maintain any part of an HVAC/refrigeration system that contains any circuit rated over 600 volts, whether the circuit is energized or deenergized. The rule is about voltage rating, not amperage, and it applies even with the power off.

    Reference: Chapter 296-46B WAC, WAC 296-46B-920(2)(f)(iii)(A)

  2. A packaged unit has one hermetic refrigerant motor-compressor with a rated-load current of 22.4 amperes and no other loads. Under 440.32, what is the minimum ampacity of its branch-circuit conductors?

    Answer: 28.0 amperes

    Section 440.32 requires branch-circuit conductors to a single motor-compressor to have an ampacity of at least 125 percent of the rated-load current or branch-circuit selection current, whichever is greater: 22.4 A x 1.25 = 28.0 A. 22.4 A uses 100 percent, 25.8 A uses the 115 percent disconnect rule of 440.12, and 56.0 A uses 250 percent.

    Reference: NFPA 70, National Electrical Code, 2020, 440.32

  3. Which of these ampere ratings is NOT a standard rating for fuses and inverse time circuit breakers in 240.6(A)?

    Answer: 55 amperes

    Section 240.6(A) lists standard ratings including 15, 20, 25, 30, 35, 40, 45, 50, 60, 70, 80, 90, 100, 110 and 125 amperes. There is no 55-ampere standard rating; the list goes from 50 to 60 A.

    Reference: NFPA 70, National Electrical Code, 2020, 240.6(A)

  4. Metal gas piping inside a building connects to a gas furnace. Under 250.104(B), what may serve as the bonding means for the piping?

    Answer: The equipment grounding conductor of the circuit likely to energize the piping

    Section 250.104(B) requires other metal piping that may become energized, including gas piping, to be bonded, and permits the equipment grounding conductor for the circuit that is likely to energize the piping to serve as the bonding means. A separate rod is not an effective fault path, the neutral may not be used for equipment bonding on the load side of the service, and Class 2 conductors are not bonding conductors.

    Reference: NFPA 70, National Electrical Code, 2020, 250.104(B)

  5. A 40-ampere circuit to an older condensing unit uses 8 AWG THHN copper. The unit and breaker terminals have no temperature marking. Under 110.14(C)(1)(a), what ampacity must be used for the conductor?

    Answer: 40 amperes

    Section 110.14(C)(1)(a) says terminations for circuits rated 100 A or less, or for 14 through 1 AWG conductors, are based on the 60 degree C column unless the equipment is listed and identified for higher temperatures. 8 AWG copper at 60 degrees C in Table 310.16 is 40 A, which is adequate here. 50 A is the 75 degree value and 55 A the 90 degree value of THHN, which can only be used for adjustment and correction, not at unmarked terminals.

    Reference: NFPA 70, National Electrical Code, 2020, 110.14(C)(1)(a); Table 310.16

  6. A technician wants to install the required HVAC service receptacle by tapping the load side of the rooftop unit's disconnect. Under 210.63, is this allowed?

    Answer: No, the receptacle may not connect to the load side of the disconnect

    Section 210.63 states the receptacle outlet shall not be connected to the load side of the equipment disconnecting means, so it remains powered when the unit is shut off for service. GFCI protection (210.8(E)) and a weatherproof cover are still needed, but they do not make a load-side connection acceptable.

    Reference: NFPA 70, National Electrical Code, 2020, 210.63

  7. A raceway feeding a rooftop unit is exposed to direct sunlight and lies on the roof with less than 7/8 inch between its bottom and the roof surface. Under 310.15(B)(2), what temperature adder applies to the outdoor ambient (for conductors other than XHHW-2)?

    Answer: 33 degrees C (60 degrees F)

    Section 310.15(B)(2) requires a temperature adder of 33 degrees C (60 degrees F) to the outdoor ambient for raceways or cables exposed to direct sunlight on or above rooftops where the distance from the roof to the bottom of the raceway or cable is less than 23 mm (7/8 in.). Type XHHW-2 is exempt by exception. The 17 and 22 degree adders come from the older distance-based table, not the 2020 rule.

    Reference: NFPA 70, National Electrical Code, 2020, 310.15(B)(2)

  8. A 10-kW, 240-volt, single-phase electric duct heater has no motors. Under 424.3(B), what is the minimum ampacity of the branch-circuit conductors?

    Answer: 52.1 amperes

    Section 424.3(B) treats fixed electric space-heating equipment as a continuous load, so conductors and overcurrent devices are sized at not less than 125 percent of the total load. 10,000 W / 240 V = 41.7 A; 41.7 A x 1.25 = 52.1 A. 41.7 A omits the 125 percent factor, and 62.5 A uses 150 percent.

    Reference: NFPA 70, National Electrical Code, 2020, 424.3(B)

  9. A technician replaces a 60-microfarad run capacitor using two 30-microfarad capacitors of the correct voltage rating. How must they be connected to equal 60 microfarads?

    Answer: In parallel

    Capacitances in parallel add: 30 + 30 = 60 microfarads. In series, two equal capacitors give half the value of one: 30 / 2 = 15 microfarads. Adding a third series capacitor lowers the total further.

    Reference: General electrical theory, Capacitors in series and parallel

  10. An installer plans to pull Class 2 thermostat cable through the same raceway as the 240-volt branch-circuit conductors feeding a furnace. Under 725.136(A), is this allowed?

    Answer: No, not unless one of the specific exceptions in 725.136(B) to (I) applies

    Section 725.136(A) prohibits Class 2 and Class 3 circuit conductors in any cable, enclosure, raceway or similar fitting with electric light, power, Class 1 or non-power-limited fire alarm conductors, except as permitted in 725.136(B) through (I) (for example, separation by a barrier). Insulation rating, metal raceway and raceway size are not among the permitted conditions for sharing a raceway.

    Reference: NFPA 70, National Electrical Code, 2020, 725.136(A)

Sources

Questions last verified November 4, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.