Requirements at a glance
| Agency | Tennessee Board for Licensing Contractors; exams by Prov |
|---|---|
| License | BC-b(sm) small commercial building contractor |
| Exams | 70 questions, 3.5 hours, 73%, plus the Business and Law exam |
| Books allowed | 2021 IBC, 2018 IRC, Study Guide for Commercial Building Contractor (2024) and 29 CFR 1926 |
| Fees | $53 per Prov exam attempt, plus the Board application ($250; renewal $200) |
Qualifying individuals for a Tennessee BC-b(sm) small commercial building license from the Board for Licensing Contractors.
Official links
How to get licensed, step by step
Apply to the Board
Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.
Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)
Schedule the Business and Law exam and the BC-b(sm) exam with Prov
Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.
Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)
Pass at 73%
Every Tennessee contractor exam is open book and needs 73% to pass.
Schedule with Prov (Tennessee contractors) (opens in a new tab)
Get licensed
Send your results to the Board with the $250 application fee and your financial statement. Limits depend on working capital and net worth, and from July 1, 2026 a surety bond can replace the statement.
How to prepare
- Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
- Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
- Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
- Structural steel (12), estimating and plan reading (9) and concrete (8) lead the outline, with roofing (7) next.
- It has the BC-B topics in a shorter exam, so the BC-B bank is also good practice.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2021 IBC and the 2018 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 International Building Code (IBC)Essential
Allowed in the exam room. Tennessee adopts it with amendments (Chapter 11 removed). The code behind the general code questions on the building exams.
ICC store (opens in a new tab)Tennessee codes (UpCodes) (opens in a new tab)
2018 International Residential Code (IRC), with Tennessee amendmentsEssential
Allowed in the exam room. The code behind the BC-A general code and building sections.
Official reference list (as published by the testing agency)
- International Building Code (IBC), 2021
- International Residential Code (IRC), 2018
- Study Guide for Commercial Building Contractor, 2024 (Pearson)
- 29 CFR 1926 (OSHA Construction)
What's on the exam
Official content outline from Prov (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Estimating, Plan Reading | 9 | |
| General Code | 6 | |
| Sitework | 2 | |
| Footings and Foundations | 4 | |
| Concrete and Concrete Reinforcement | 8 | |
| Masonry | 6 | |
| Carpentry | 6 | |
| Doors, Windows, and Stairs | 1 | |
| Interior Finish | 1 | |
| Structural Steel | 12 | |
| Roofing, Siding, and Insulation | 7 | |
| Plumbing Concepts | 1 | |
| HVAC Concepts | 1 | |
| Electrical Concepts | 1 | |
| OSHA Safety | 5 |
Exam day details
- Administered by Prov for the Tennessee Board for Licensing Contractors.
- Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
- 70 questions in 3.5 hours; 73% to pass.
- BC-b(sm) is the small commercial class, capped at $1.5 million per project.
- Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
- Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
- You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
- Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
- Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.
Frequently asked questions
What's on the Tennessee BC-b(sm) exam?
70 questions: structural steel 12, estimating and plan reading 9, concrete 8, roofing, siding and insulation 7, general code 6, masonry 6, carpentry 6, OSHA safety 5, and smaller sections.
How is it different from BC-B?
It has the same topics in 70 questions instead of 100, with more weight on structural steel and carpentry and less on estimating and general code.
Which codes are used?
The 2021 IBC and the 2018 IRC, with the Commercial Building Contractor study guide (2024) and 29 CFR 1926.
Free questions with answers
Show all 10 free questions and answers
A Group B office floor has a design occupant load of 150 on the story. The building is not sprinklered, and the occupants must be served by one exit stairway on that story. Using the egress capacity factor in IBC Section 1005.3.1, what is the minimum required stairway capacity (width) before checking the minimum stair width?
Answer: 45 inches
Section 1005.3.1 uses 0.3 inch per occupant for stairways. 150 x 0.3 = 45 inches, which also exceeds the 44-inch minimum in Section 1011.2. The 0.2 factor (30 inches) applies to other egress components such as doors and corridors, not stairs.
Reference: 2021 International Building Code, 1005.3.1
Mill certificates for a delivered shipment of steel angles are missing, and the grade is not readily identifiable from markings. What does IBC Section 2202.1 require before the steel is used for structural load-carrying purposes?
Answer: Test the steel to verify that it conforms to the ordered grade
Section 2202.1 says that where the grade is not readily identifiable from marking and test records, the steel must be tested to verify conformity to the standard. A verbal or written claim, a stress reduction or paint do not satisfy the code.
Reference: 2021 International Building Code, 2202.1
A commercial slab on grade in a heated warehouse does not qualify for any exception. Under IBC Section 1907.1, what is the minimum thickness of the slab and the vapor retarder requirement under it?
Answer: 3 1/2 inches thick; 6-mil polyethylene with joints lapped at least 6 inches
Section 1907.1 requires floor slabs supported on the ground to be at least 3 1/2 inches thick with a 6-mil (0.006 inch) polyethylene vapor retarder lapped at least 6 inches, or another approved method. The listed exceptions (accessory R-3 structures, small unheated storage, flatwork) do not apply to a heated warehouse.
Reference: 2021 International Building Code, 1907.1
A column carries a total load of 45,000 pounds and will bear on silty sand (class 4 material in IBC Table 1806.2). Using the presumptive vertical foundation pressure for that soil, what is the minimum footing area?
Answer: 22.5 square feet
Table 1806.2 gives 2,000 psf for sand, silty sand, clayey sand, silty gravel and clayey gravel. Area = 45,000 lb / 2,000 psf = 22.5 sq ft. Using 3,000 psf (sandy gravel) gives 15 sq ft and 1,500 psf (clay) gives 30 sq ft.
Reference: 2021 International Building Code, Table 1806.2
Under IBC Section 1804.4, the ground next to a foundation wall must slope away from the building at least 5 percent for a distance of at least 10 feet. How much vertical drop is that over the 10 feet?
Answer: 6 inches
A 5-percent slope is 1 unit vertical in 20 horizontal. Over 10 ft: 10 / 20 = 0.5 ft = 6 inches. The 2-percent exception (for swales or where climate and soil conditions warrant) would be about 2.4 inches.
Reference: 2021 International Building Code, 1804.4
According to IBC Section 2101.2, structural masonry must comply with which standards, in addition to the requirements of IBC Chapter 21?
Answer: TMS 402, TMS 403 or TMS 404
Section 2101.2 requires masonry to comply with TMS 402, TMS 403 or TMS 404 as well as the applicable provisions of the chapter. Construction requirements point to TMS 602 or TMS 604 (Section 2104.1). ACI 318 is the concrete standard.
Reference: 2021 International Building Code, 2101.2
A wood-framed commercial building is planned with bearing walls that support floors and a roof. Under IBC Section 2304.3.3, what is the greatest number of floors and roof such walls may support without a shrinkage analysis?
Answer: Two floors and a roof
Section 2304.3.3 limits wood walls and bearing partitions to supporting not more than two floors and a roof, unless an analysis satisfactory to the building official shows that shrinkage will not harm the structure or the systems installed in it.
Reference: 2021 International Building Code, 2304.3.3
An attic of 3,000 square feet has no vapor retarder and is cross-ventilated with the exception conditions NOT met. What is the minimum net free ventilating area under IBC Section 1202.2.1?
Answer: 20 square feet
The base requirement is 1/150 of the area ventilated: 3,000 / 150 = 20 sq ft net free area. The 1/300 reduction (10 sq ft) applies only when a Class I or II vapor retarder is installed in Climate Zones 6 through 8 and 40 to 50 percent of the vents are in the upper portion.
Reference: 2021 International Building Code, 1202.2.1
Under 29 CFR 1926.451(g)(1), at what height above a lower level must employees on most scaffold types be protected from falling?
Answer: More than 10 feet
Section 1926.451(g)(1) requires fall protection for each employee on a scaffold more than 10 feet above a lower level, with the type of protection depending on the scaffold. Scaffold capacity is at least 4 times the maximum intended load under 1926.451(a)(1).
Reference: 29 CFR 1926, 1926.451(g)(1)
On a floor plan drawn at 1/8 inch = 1 foot, a wall measures 6 3/4 inches with a scale rule. What is the actual length of the wall?
Answer: 54 feet
At 1/8 inch per foot, each inch on the drawing is 8 feet. 6.75 x 8 = 54 feet. 27 feet reads the 1/4-inch scale, 108 feet reads a 1/16-inch scale, and 0.84 divides by 8 instead of multiplying.
Reference: General plan reading practice: architectural scales, Converting a scaled dimension to an actual length
Sources
- Prov: Tennessee Contractor Candidate Information Bulletin (TNCONT_CIB 2026.08.18) (opens in a new tab)
- Tennessee Board for Licensing Contractors: how to get a contractor license (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.