Requirements at a glance
| Agency | Tennessee Board for Licensing Contractors; exams by Prov |
|---|---|
| License | BC-B commercial building contractor |
| Exams | 100 questions, 5 hours, 73%, plus the Business and Law exam |
| Books allowed | 2021 IBC, 2018 IRC, Study Guide for Commercial Building Contractor (2024) and 29 CFR 1926 |
| Fees | $53 per Prov exam attempt, plus the Board application ($250; renewal $200) |
Qualifying individuals for a Tennessee BC-B (commercial building) license from the Board for Licensing Contractors.
Official links
How to get licensed, step by step
Apply to the Board
Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.
Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)
Schedule the Business and Law exam and the BC-B exam with Prov
Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.
Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)
Pass at 73%
Every Tennessee contractor exam is open book and needs 73% to pass.
Schedule with Prov (Tennessee contractors) (opens in a new tab)
Get licensed
Send your results to the Board with the $250 application fee and your financial statement. Limits depend on working capital and net worth, and from July 1, 2026 a surety bond can replace the statement.
How to prepare
- Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
- Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
- Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
- Estimating and plan reading (15), concrete (15), general code (12), masonry (10) and structural steel (10) are 62 of the 100 questions.
- The general code questions come from the 2021 IBC, which Tennessee amends (Chapter 11 is removed; NFPA 13R is allowed up to 4 stories in some R-2 buildings).
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2021 IBC and the 2018 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 International Building Code (IBC)Essential
Allowed in the exam room. Tennessee adopts it with amendments (Chapter 11 removed). The code behind the general code questions on the building exams.
ICC store (opens in a new tab)Tennessee codes (UpCodes) (opens in a new tab)
2018 International Residential Code (IRC), with Tennessee amendmentsEssential
Allowed in the exam room. The code behind the BC-A general code and building sections.
Official reference list (as published by the testing agency)
- International Building Code (IBC), 2021
- International Residential Code (IRC), 2018
- Study Guide for Commercial Building Contractor, 2024 (Pearson)
- 29 CFR 1926 (OSHA Construction)
What's on the exam
Official content outline from Prov (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Estimating, Plan Reading | 15 | |
| General Code | 12 | |
| Sitework | 5 | |
| Footings and Foundations | 6 | |
| Concrete and Concrete Reinforcement | 15 | |
| Masonry | 10 | |
| Carpentry | 4 | |
| Doors, Windows, and Stairs | 1 | |
| Interior Finish | 1 | |
| Structural Steel | 10 | |
| Roofing, Siding, and Insulation | 6 | |
| Plumbing Concepts | 3 | |
| HVAC Concepts | 3 | |
| Electrical Concepts | 3 | |
| OSHA Safety | 6 |
Exam day details
- Administered by Prov for the Tennessee Board for Licensing Contractors.
- Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
- 100 questions in 5 hours; 73% to pass.
- Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
- Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
- You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
- Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
- Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.
Frequently asked questions
What's on the Tennessee BC-B exam?
100 questions: estimating and plan reading 15, concrete 15, general code 12, masonry 10, structural steel 10, footings and foundations 6, roofing, siding and insulation 6, OSHA safety 6, and smaller sections.
Which codes are used?
The 2021 IBC and the 2018 IRC, with the Study Guide for Commercial Building Contractor (2024) and 29 CFR 1926.
Are there combined building exams?
Prov also offers combined BC exams (such as BC-A,B). We do not have separate banks for them; the BC-A, BC-B and BC-C banks cover the same topics.
Free questions with answers
Show all 10 free questions and answers
Within one flight of a commercial stairway, the riser heights measure 6-3/4, 7, 6-7/8 and 7-1/4 inches. Under the IBC stair rules, which statement is correct?
Answer: The flight fails because the largest and smallest risers differ by more than 3/8 inch
Section 1011.5.4 limits the difference between the largest and smallest riser in a flight to 3/8 inch. Here 7-1/4 minus 6-3/4 is 1/2 inch, which exceeds 3/8 inch. Also, 7-1/4 exceeds the 7-inch maximum riser in 1011.5.2, and averaging is not allowed.
Reference: 2021 International Building Code, Section 1011.5.4
Under the 2021 IBC, what is the minimum depth of a footing below the undisturbed ground surface, and the minimum footing width, before frost depth is considered?
Answer: 12 inches deep and 12 inches wide
Section 1809.4 sets both the minimum footing depth below undisturbed ground and the minimum width at 12 inches. Section 1809.5 can require deeper footings to get below the frost line, so the greater requirement governs.
Reference: 2021 International Building Code, Section 1809.4
Finished grade next to a commercial building foundation must slope away from the wall at the standard IBC slope for the first 10 feet. What is the minimum drop in elevation over that 10 feet?
Answer: 6 inches
Section 1804.4 requires at least 1 unit vertical in 20 horizontal (5 percent) for 10 feet. 10 ft x 12 in/ft = 120 inches, and 120 / 20 = 6 inches. A 2 percent slope (1:48) is allowed only where climate or soil conditions warrant, and would give 2.5 inches.
Reference: 2021 International Building Code, Section 1804.4
A spread footing is cast directly against the soil with no forms on the bottom. Under ACI 318 (referenced by IBC Section 1901.2), what minimum specified concrete cover is required over the reinforcing steel?
Answer: 3 inches
ACI 318-19 Table 20.5.1.3.1 requires 3 inches of cover for concrete cast against and permanently in contact with the ground. The smaller covers apply to formed surfaces and to concrete not exposed to ground or weather.
Reference: ACI 318-19 (adopted by 2021 IBC Section 1901.2), Table 20.5.1.3.1
A crew builds a freestanding concrete masonry wall 12 feet high. Under OSHA, how far from the wall and on which side must the limited access zone be established?
Answer: 16 feet on the unscaffolded side
Section 1926.706(a)(2) sets the limited access zone equal to the wall height plus 4 feet (12 + 4 = 16 feet), running the full length of the wall, and (a)(3) puts it on the unscaffolded side. Only workers actively building the wall may enter it.
Reference: 29 CFR 1926, 1926.706(a)(2) and (a)(3)
When placing a solid web structural member during steel erection, what is the least number of bolts per connection that must be installed, drawn up wrench-tight, before the load is released from the hoisting line?
Answer: Two
Section 1926.756(a)(1) requires at least two bolts per connection, of the size and strength shown in the erection drawings, drawn wrench-tight, before releasing the hoisting line. Diagonal bracing needs only one bolt under 1926.756(b), which is the tempting wrong answer.
Reference: 29 CFR 1926, 1926.756(a)(1)
For asphalt strip shingles on a 5:12 roof, what is the minimum number of fasteners per strip shingle required by the IBC, unless the manufacturer requires more?
Answer: Four
Section 1507.2.6 requires the manufacturer's minimum number of fasteners but not fewer than four per strip shingle or two per individual shingle. Fasteners must also be corrosion-resistant roofing nails of at least 12-gage shank with a 3/8-inch head under Section 1507.2.5.
Reference: 2021 International Building Code, Section 1507.2.6
Wood used in contact with exposed earth must be either naturally durable (decay and termite resistant) or treated to which standard?
Answer: AWPA U1
Section 2304.12.2.6 requires wood in contact with exposed earth to be naturally durable for both decay and termite resistance or preservative treated in accordance with AWPA U1 for soil or fresh water use. Untreated wood is allowed only if continuously below the ground-water level or submerged in fresh water.
Reference: 2021 International Building Code, Section 2304.12.2.6
A guardrail system must withstand, without failure, what minimum force applied within 2 inches of the top edge in any outward or downward direction, under 1926.502(b)(3)?
Answer: 200 pounds
Section 1926.502(b)(3) requires guardrails to withstand at least 200 pounds applied within 2 inches of the top edge. The 150-pound value in (b)(5) is for midrails, screens, mesh and intermediate members.
Reference: 29 CFR 1926, 1926.502(b)(3) and (b)(5)
A 40 ft by 60 ft slab on grade is 6 inches thick. How many cubic yards of concrete should be ordered if 5 percent is added for waste?
Answer: 46.7 cubic yards
Area = 40 x 60 = 2,400 sq ft. Volume = 2,400 x 0.5 ft = 1,200 cu ft, and 1,200 / 27 = 44.4 cu yd. Add 5 percent: 44.4 x 1.05 = 46.7 cu yd. 44.4 omits the waste, 53.3 adds 20 percent instead of 5, and 88.9 treats the slab as 1 foot thick.
Reference: General construction estimating practice: concrete slab takeoff, Volume in cubic feet divided by 27, plus waste allowance
Sources
- Prov: Tennessee Contractor Candidate Information Bulletin (TNCONT_CIB 2026.08.18) (opens in a new tab)
- Tennessee Board for Licensing Contractors: how to get a contractor license (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.