Tennessee licensing exam

Tennessee Industrial Building Contractor (BC-C) Exam: Practice Test & Licensing Guide

The Prov trade exam for Tennessee's BC-C industrial building classification: 70 open-book questions on concrete, structural steel, estimating and the 2021 IBC.

Questions
70
Time limit
3.5 hours
Passing score
73%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Concrete and Concrete Reinforcement

A crew must clear a jam inside a bulk cement silo. Under OSHA 1926.702(a)(2), what must be done before any employee enters the storage facility?

Requirements at a glance

AgencyTennessee Board for Licensing Contractors; exams by Prov
LicenseBC-C industrial building contractor
Exams70 questions, 3.5 hours, 73%, plus the Business and Law exam
Books allowed2021 IBC, Study Guide for Commercial Building Contractor (2024) and 29 CFR 1926
Fees$53 per Prov exam attempt, plus the Board application ($250; renewal $200)

Qualifying individuals for a Tennessee BC-C (industrial building) license from the Board for Licensing Contractors.

How to get licensed, step by step

  1. Apply to the Board

    Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.

    Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)

  2. Schedule the Business and Law exam and the BC-C exam with Prov

    Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)

  3. Pass at 73%

    Every Tennessee contractor exam is open book and needs 73% to pass.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)

  4. Get licensed

    Send your results to the Board with the $250 application fee and your financial statement. Limits depend on working capital and net worth, and from July 1, 2026 a surety bond can replace the statement.

    Board: how to get a contractor license (opens in a new tab)

How to prepare

  • Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
  • Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
  • Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
  • Concrete (17) and structural steel (14) are 31 of the 70 questions.
  • There is no IRC on the BC-C list; study the IBC and the commercial study guide.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Building Code (IBC), 2021
  • Study Guide for Commercial Building Contractor, 2024 (Pearson)
  • 29 CFR 1926 (OSHA Construction)

What's on the exam

Official content outline from Prov (number of questions per topic):

TopicQuestions
Estimating, Plan Reading8
General Code5
Sitework2
Footings and Foundations3
Concrete and Concrete Reinforcement17
Masonry6
Carpentry3
Structural Steel14
Roofing, Siding, and Insulation4
Plumbing Concepts1
HVAC Concepts1
Electrical Concepts1
OSHA Safety5

Exam day details

  • Administered by Prov for the Tennessee Board for Licensing Contractors.
  • Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
  • 70 questions in 3.5 hours; 73% to pass.
  • The BC-C outline does not list the IRC as a reference.
  • Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
  • Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
  • You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
  • Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
  • Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.

Frequently asked questions

What's on the Tennessee BC-C exam?

70 questions: concrete 17, structural steel 14, estimating and plan reading 8, masonry 6, general code 5, OSHA safety 5, roofing, siding and insulation 4, and smaller sections.

Which codes are used?

The 2021 IBC, the Commercial Building Contractor study guide (2024) and 29 CFR 1926. The IRC is not on the BC-C list.

Do I need Business and Law too?

Yes. Every new contractor takes the Business and Law exam plus the trade exam for the classification.

Free questions with answers

Show all 10 free questions and answers
  1. A crew must clear a jam inside a bulk cement silo. Under OSHA 1926.702(a)(2), what must be done before any employee enters the storage facility?

    Answer: The ejection system must be shut down, locked out and tagged

    Section 1926.702(a)(2) prohibits entry into bulk cement storage unless the ejection system has been shut down, locked out and tagged as not to be operated. A spotter at the switch is not lockout, and an open gate can start material flowing.

    Reference: 29 CFR 1926, 1926.702(a)(2)

  2. Under OSHA 1926.753(c)(1), who must visually inspect a crane used for steel erection, and how often?

    Answer: A competent person, before each shift

    Section 1926.753(c)(1)(i) requires a competent person to visually inspect the crane before each shift, including observation for deficiencies during operation. A deficiency that is a hazard takes the crane out of service until corrected.

    Reference: 29 CFR 1926, 1926.753(c)(1)

  3. An allowable-stress-design reinforced masonry wall uses No. 6 bars (diameter 3/4 inch). For the lap splices, IBC Equation 21-1 in Section 2107.2.1 gives a required length of 20 inches. What minimum lap splice length governs?

    Answer: 30 inches

    Section 2107.2.1 sets a minimum of 12 inches and not less than 40 bar diameters: 40 x 0.75 = 30 inches. 20 inches is the equation result, which is too short, 12 inches is the absolute minimum, and 45 inches would be the 50 percent increase applied only where tensile stress exceeds 80 percent of the allowable.

    Reference: 2021 International Building Code, Section 2107.2.1

  4. An uncased cast-in-place deep foundation element has a specified diameter of 14 inches. If the registered-design-professional exception is not used, what is the longest it may be under IBC Section 1810.3.5.2.2?

    Answer: 35 feet

    Uncased elements may not exceed 30 times the specified diameter: 30 x 14 in = 420 in, and 420 / 12 = 35 ft. 42 ft would result from using 36 diameters, and 28 ft from 24 diameters; the diameter itself must also be at least 12 inches.

    Reference: 2021 International Building Code, Section 1810.3.5.2.2

  5. A new plant has a basement-level floor below the finished ground level. Under IBC Section 1803.5.4, a subsurface soil investigation for ground-water must be done if the water table is above or within what distance below the lowest floor?

    Answer: 5 feet

    Section 1803.5.4 requires a subsurface investigation where the ground-water table is above or within 5 feet below the elevation of the lowest floor located below finished ground level, unless waterproofing is provided under Section 1805.

    Reference: 2021 International Building Code, Section 1803.5.4

  6. A building for fabricating and assembling metal products is Group F-2 and has no sprinkler system. Under IBC Table 1017.2, what is the maximum exit access travel distance?

    Answer: 300 feet

    Table 1017.2 gives F-2, S-2 and U occupancies 300 feet without sprinklers and 400 feet with sprinklers. The 200/250 foot values are for F-1, S-1, M, A, E and R, and 400 feet is the sprinklered F-2 limit.

    Reference: 2021 International Building Code, Table 1017.2

  7. A takeoff shows 3,000 linear feet of No. 7 reinforcing bar for a warehouse slab. Using ASTM A615 nominal weights (No. 6 = 1.502, No. 7 = 2.044, No. 8 = 2.670 lb per foot), what is the weight of the bar?

    Answer: 6,132 lb

    Weight = length x unit weight = 3,000 ft x 2.044 lb/ft = 6,132 lb. 4,506 lb uses the No. 6 weight and 8,010 lb the No. 8 weight; 2,004 lb is 3,000 x 0.668 (a No. 4 bar).

    Reference: General estimating practice: ASTM A615 bar weights per foot, Reinforcing bar weight per linear foot

  8. Which materials does IBC Section 1502.4 allow for gutters and leaders on the outside of a Type II industrial building?

    Answer: Noncombustible material or not less than Schedule 40 plastic pipe

    Section 1502.4 requires exterior gutters and leaders, other than on Group R-3, private garages and Type V buildings, to be noncombustible or not less than Schedule 40 plastic pipe.

    Reference: 2021 International Building Code, Section 1502.4

  9. A wood floor beam supports a masonry veneer ledge. According to IBC Section 2304.13, what must be checked for wood members supporting concrete, masonry or similar materials?

    Answer: The effects of long-term loading under ANSI/AWC NDS

    Section 2304.13 requires wood members supporting concrete, masonry or similar materials to be checked for long-term loading effects in accordance with the ANSI/AWC NDS, with total deflection limited per Section 1604.3.1.

    Reference: 2021 International Building Code, Section 2304.13

  10. Temporary job-built stairways (not part of the permanent structure) must have landings at least what size at every 12 feet or less of vertical rise, under 1926.1052(a)(1)?

    Answer: 30 inches in the direction of travel and at least 22 inches wide

    Section 1926.1052(a)(1) requires landings of not less than 30 inches in the direction of travel, extending at least 22 inches in width, at every 12 feet or less of vertical rise.

    Reference: 29 CFR 1926, 1926.1052(a)(1)

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.