Tennessee licensing exam

Tennessee Residential Building Contractor (BC-A) Exam: Practice Test & Licensing Guide

The Prov trade exam for Tennessee's BC-A residential building contractor classification: 100 open-book questions on estimating, plan reading, the 2018 IRC, concrete, masonry, carpentry and roofing.

Questions
100
Time limit
5 hours
Passing score
73%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Code

A bedroom has 150 square feet of floor area. Using the IRC natural light and ventilation rule, what is the minimum glazing area and the minimum openable area to the outdoors?

Requirements at a glance

AgencyTennessee Board for Licensing Contractors; exams by Prov
LicenseBC-A residential building contractor (1 to 4 family dwellings up to 3 stories)
Exams100 questions, 5 hours, 73%, plus the Business and Law exam
Books allowed2018 IRC, 2021 IBC, the Residential Home Builder Study Guide and 29 CFR 1926
Fees$53 per Prov exam attempt, plus the Board application ($250; renewal $200)

Qualifying individuals for a Tennessee BC-A license (1 to 4 family dwellings up to 3 stories) from the Board for Licensing Contractors.

How to get licensed, step by step

  1. Apply to the Board

    Send the Board your application. CMC and CMC-A applicants need pre-approval first (3 years of experience; $50 request). Trade-exam waivers exist for reciprocity states and NASCLA exams.

    Board: how to get a contractor license (opens in a new tab)Tennessee Board for Licensing Contractors (opens in a new tab)

  2. Schedule the Business and Law exam and the BC-A exam with Prov

    Register with Prov and test at a testing center or at home with Examroom. You can retake with no waiting period at $53 per attempt.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)Prov: register for your exam (opens in a new tab)

  3. Pass at 73%

    Every Tennessee contractor exam is open book and needs 73% to pass.

    Schedule with Prov (Tennessee contractors) (opens in a new tab)

  4. Get licensed

    Send your results to the Board with the $250 application fee and your financial statement. Limits depend on working capital and net worth, and from July 1, 2026 a surety bond can replace the statement.

    Board: how to get a contractor license (opens in a new tab)

How to prepare

  • Bring the editions on Prov's list: the 2017 NEC for electrical, the 2021 IPC, IMC and IFGC for plumbing and HVAC, the 2018 IRC for residential building and the 2021 IBC for commercial, industrial and mechanical. PSI-era books are accepted until 1/1/2027, then only Prov-recommended ones.
  • Tab your books before exam day with permanent tabs only. You can highlight, but moveable tabs are not allowed, and only a simple 4-function calculator is permitted.
  • Tennessee has no state journeyman or master license; cities and counties run their own cards and tests. These exams are for contractor classifications and the limited licenses (LLE and LLP).
  • Carpentry (15), estimating and plan reading (13), concrete (10) and roofing, siding and insulation (10) are almost half the exam.
  • Tennessee amends the 2018 IRC; check the state's amendments for the general code questions.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • 2018 International Residential Code (IRC), with Tennessee amendmentsEssential

    Allowed in the exam room. The code behind the BC-A general code and building sections.

    ICC store (opens in a new tab)

Official reference list (as published by the testing agency)
  • International Residential Code (IRC), 2018 (Tennessee amends it)
  • International Building Code (IBC), 2021
  • Residential Home Builder Study Guide (Pearson)
  • 29 CFR 1926 (OSHA Construction)

What's on the exam

Official content outline from Prov (number of questions per topic):

TopicQuestions
Estimating, Plan Reading13
General Code8
Sitework5
Footings and Foundations6
Concrete and Concrete Reinforcement10
Masonry7
Carpentry15
Doors, Windows, and Stairs2
Interior Finish2
Exterior Finish2
Roofing, Siding, and Insulation10
Plumbing Concepts4
HVAC Concepts4
Electrical Concepts4
OSHA Safety8

Exam day details

  • Administered by Prov for the Tennessee Board for Licensing Contractors.
  • Fee: $53 per exam to Prov, for a first attempt or a retake. Board application and license fees are separate.
  • 100 questions in 5 hours; 73% to pass.
  • BC-A covers 1 to 4 family dwellings up to 3 stories. The BC-A/r limited residential license (under $125,000) uses a college course instead of exams.
  • Open book: bring your own copies of the listed references. You may highlight and add permanent tabs, but moveable tabs are not allowed. Only a simple 4-function calculator is permitted.
  • Test at a Prov testing center or at home with Examroom (remote proctoring). All Tennessee contractor exams need 73% to pass.
  • You may retake as many times as needed with no waiting period, at $53 per attempt. If you fail within 10 points of 73% you can request a review of your exam.
  • Prov replaced PSI as the Tennessee vendor on 7/1/2026. Reference lists accept PSI-era books until 1/1/2027, then only Prov-recommended ones.
  • Every new contractor takes the Business and Law exam plus a trade exam for the classification. Reciprocity or NASCLA exams can waive the trade exam.

Note: Tennessee amends the 2018 IRC (for example, R313 sprinklers are not mandatory and the electrical chapters are deleted so the NEC applies). Check the current Prov bulletin and Tennessee code before you test.

Frequently asked questions

What's on the Tennessee BC-A exam?

100 questions: carpentry 15, estimating and plan reading 13, concrete 10, roofing, siding and insulation 10, general code 8, OSHA safety 8, masonry 7, and smaller sections.

Which IRC edition is used?

The 2018 IRC (Tennessee amends it), with the 2021 IBC also listed.

Is there a shortcut for small residential jobs?

The BC-A/r limited residential license (under $125,000) uses a college course instead of exams.

Free questions with answers

Show all 10 free questions and answers
  1. A bedroom has 150 square feet of floor area. Using the IRC natural light and ventilation rule, what is the minimum glazing area and the minimum openable area to the outdoors?

    Answer: 12 square feet of glazing and 6 square feet openable

    R303.1 requires glazing of at least 8 percent of floor area and openable area of at least 4 percent. 150 x 0.08 = 12 sq ft glazing; 150 x 0.04 = 6 sq ft openable. Reversing the percentages or using 10 percent and 5 percent gives the wrong choices.

    Reference: 2018 International Residential Code, R303.1

  2. Footing width and thickness are selected from Table R403.1(1) by soil bearing value. For a soil classed as clay, silty clay (CL, ML, MH, CH) with no soils report, what presumptive load-bearing value does Table R401.4.1 assign?

    Answer: 1,500 pounds per square foot

    Table R401.4.1 lists 1,500 psf for clay, sandy clay, silty clay, clayey silt and silt (CL, ML, MH, CH). Sand and silty sand are 2,000 psf and sandy gravel is 3,000 psf. Soils likely to be below 1,500 psf need a soils investigation.

    Reference: 2018 International Residential Code, Table R401.4.1

  3. A concrete patio and driveway abut a new house. What minimum slope must impervious surfaces within 10 feet of the foundation have, sloping away from the building?

    Answer: 2 percent

    R401.3 requires impervious surfaces within 10 feet of the building to slope at least 2 percent (about 1/4 inch per foot) away from the foundation. The 6 inches per 10 feet rule (5 percent) applies to soil grade.

    Reference: 2018 International Residential Code, R401.3

  4. A garage floor slab in a region with moderate weathering potential is exposed to the weather and deicing chemicals. Using Table R402.2, what is the minimum specified compressive strength?

    Answer: 3,000 psi, with air entrainment

    Table R402.2 sets 3,000 psi for porches, carport slabs, steps and garage floor slabs at moderate weathering potential (3,500 psi at severe), and concrete under moderate or severe weathering must be air entrained. Basement slabs and interior slabs need only 2,500 psi.

    Reference: 2018 International Residential Code, Table R402.2

  5. A mason is building weepholes in the outside wythe of a brick veneer wall. Under R703.8.6, what is the maximum spacing of weepholes and where are they located?

    Answer: 33 inches on center maximum, immediately above the flashing

    R703.8.6 requires weepholes in the outside wythe at a maximum of 33 inches on center, at least 3/16 inch in diameter, located immediately above the flashing. Flashing under the first course per R703.8.5 lets water drain out through them.

    Reference: 2018 International Residential Code, R703.8.6

  6. Floor joists framing from opposite sides lap over an interior beam. What lap and minimum nailing does R502.6.1 require?

    Answer: At least 3 inches of lap, nailed with at least three 10d face nails

    R502.6.1 requires joists framing from opposite sides over a support to lap at least 3 inches and be nailed with a minimum of three 10d face nails, or to be joined with a wood or metal splice at least as strong.

    Reference: 2018 International Residential Code, R502.6.1

  7. An open valley on a shingle roof is lined with corrosion-resistant metal. What is the minimum width of the metal valley lining per R905.2.8.2?

    Answer: 24 inches

    R905.2.8.2 requires metal for open valley linings to be at least 24 inches wide. Two-ply roll roofing may be used instead, with an 18-inch bottom layer and a top layer at least 36 inches wide. 36 inches is the closed-valley roll roofing width.

    Reference: 2018 International Residential Code, R905.2.8.2

  8. A straight 48-foot wall has studs spaced 16 inches on center. Using the standard estimating shortcut (length x 12 / spacing, plus 1), how many studs are needed for the wall, not counting corners, openings or plates?

    Answer: 37 studs, from 48 x 12 / 16 = 36 plus 1

    Studs = (length in inches / spacing) + 1 = (576 / 16) + 1 = 36 + 1 = 37. The extra stud closes the last bay. Corners and openings add more on a real take-off.

    Reference: Residential Home Builder Study Guide (Pearson), Estimating: stud count (concept)

  9. A framing crew is working at the unprotected edge of a floor deck that is 10 feet above the ground. Under 29 CFR 1926.501, at what height above a lower level must fall protection be provided for an unprotected side or edge?

    Answer: 6 feet or more

    29 CFR 1926.501(b)(1) requires employees on a walking/working surface with an unprotected side or edge 6 feet or more above a lower level to be protected by guardrail systems, safety net systems or personal fall arrest systems. The 10 feet figure is the scaffold trigger in 1926.451(g), not the general construction rule.

    Reference: 29 CFR 1926 (OSHA Construction), 1926.501(b)(1)

  10. The water main pressure at a new house is 92 psi. What does the IRC require at the connection to the water service?

    Answer: An approved pressure-reducing valve, because static pressure may not exceed 80 psi

    IRC P2903.3 (maximum pressure provision) limits static water pressure to 80 psi; where the main pressure exceeds 80 psi an approved pressure-reducing valve is installed at the connection to the water service. A booster pump is for pressure that is too low.

    Reference: 2018 International Residential Code, P2903.3

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.