Requirements at a glance
| Agency | South Carolina Department of Labor, Licensing and Regulation (LLR), Contractor's Licensing Board; exams by PSI |
|---|---|
| Experience | The primary qualifying party needs 2 of the last 5 years of full-time experience in the classification, in a management role (S.C. Code 40-11-230) |
| Exams | Refrigeration: 50 questions, 3 hours, 70%, plus Business Management and Law (Commercial); 70% on each |
| Books allowed | IMC 2021 or 2024 (SC), the Pipefitter's Handbook, Carrier piping design manual and Modern Refrigeration and Air Conditioning |
| Fees | PSI exam fees ($64 to $78 per exam), plus the Board's application and license fees and a financial statement or bond |
Applicants for a South Carolina Contractor's Licensing Board mechanical license in the Refrigeration classification.
Official links
How to get licensed, step by step
Check the work needs a license
South Carolina requires a Contractor's Licensing Board license for commercial work above $10,000 in job cost (S.C. Code 40-11-30). Commercial licenses also cover residential work.
SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)
Apply to the Board
Apply to the Contractor's Licensing Board for an eligibility letter before you register with PSI.
Schedule Business and Law and the refrigeration exam with PSI
Register for each exam separately. You may take each trade exam twice in 12 months, then once every six months. Commercial Business and Law has no such limit.
Schedule with PSI (commercial contractors) (opens in a new tab)
Apply for the license
After you pass, the business entity applies with its primary qualifying party, a financial statement or bond, and the license fee. The group (1 to 5) sets the dollar limit of work you may bid.
SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)
How to prepare
- Code editions are changing. From November 1, 2026 PSI accepts the 2021 or the 2024 South Carolina codes (ICC codes with state modifications) and the 2023 or the 2020 NEC. After July 1, 2027 only the 2024 codes and the 2023 NEC. Bring one edition you know well and expect questions that read the same in both.
- Tab your books before exam day: highlighting, underlining and permanent tabs are allowed, but sticky notes and writing during the exam are not.
- HARV general (11), maintenance (8) and controls (8) are over half the exam: refrigeration cycle, troubleshooting and control devices.
- Piping dimensioning and design (9) and general piping (3) draw on the Carrier and Pipefitter's Handbook texts; tab the sizing tables.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the SC IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2021 or 2024 edition with South Carolina modificationsEssential
On PSI's list. Ducts, ventilation, equipment, venting and piping for the air conditioning and residential HVAC exams.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
Modern Refrigeration and Air Conditioning (Goodheart-Willcox)
On PSI's list (21st or 22nd Edition for air conditioning; 19th or 20th for residential HVAC). Refrigeration cycle, components, controls and piping.
29 CFR Part 1926 (OSHA construction regulations)
On PSI's list for the building, electrical, plumbing and HVAC exams. Safety questions.
Official reference list (as published by the testing agency)
- International Mechanical Code (IMC), 2021 or 2024 edition with South Carolina modifications
- Code of Federal Regulations, 29 CFR Part 1926 (on PSI's list)
- Pipefitter's Handbook, 3rd Edition; Carrier System Design Manual Part III: Piping Design
- Modern Refrigeration and Air Conditioning, 21st or 22nd Edition; Whitman, Refrigeration and Air Conditioning Technology, 6th Edition; Trane Air Conditioning Manual; ASHRAE Handbook of Fundamentals 1997 (all on PSI's list)
- South Carolina 811 Excavator Manual
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Code Compliance | 7 | |
| HARV General | 11 | |
| HARV Maintenance | 8 | |
| HARV Controls | 8 | |
| Piping - General | 3 | |
| Piping - Dimensioning and Design | 9 | |
| Safety | 4 |
Exam day details
- Administered by PSI Services for the South Carolina Department of Labor, Licensing and Regulation (Contractor's Licensing Board).
- Fee: $78 to PSI. Board application and license fees are separate.
- 50 scored questions plus 1 to 10 unscored experimental items (they count against your time) in 180 minutes; 35 correct (70%).
- Code editions: from November 1, 2026 PSI accepts the 2021 or 2024 South Carolina codes (NEC 2023 or 2020); after July 1, 2027 only the 2024 codes and the 2023 NEC. Our questions are written to be correct under both.
- Open book: bring the references on PSI's list. You may highlight, underline and add permanent tabs (tabs that would tear the page if removed); sticky notes and removable tabs are not allowed.
- Apply to the Contractor's Licensing Board first. After approval you get an eligibility letter and register with PSI (855-340-3701) for each exam; the registration confirmation is valid 1 year or until a classification has been failed twice.
- You may take each trade exam twice in 12 months, then once every six months.
- Every Contractor's Licensing Board license needs the Business Management and Law exam and the technical exam for the classification, 70% on each (S.C. Code 40-11-230).
Frequently asked questions
What's on the South Carolina refrigeration exam?
50 scored questions: HARV general 11, piping dimensioning and design 9, HARV maintenance 8, HARV controls 8, code compliance 7, safety 4 and piping general 3.
What is the biggest topic?
HARV general knowledge, with 11 of 50 questions. Piping design, maintenance and controls follow.
Is it the same as the air conditioning exam?
No. Refrigeration is its own classification with a 50-question exam; air conditioning has 80.
Free questions with answers
Show all 10 free questions and answers
A technician wants to top off a system with a refrigerant that carries a different ASHRAE 34 designation than the refrigerant in the system. Under IMC Section 1102.2.1, which condition must be met before two refrigerants with different designations may be mixed in one system?
Answer: The manufacturer allows the addition and its written instructions are followed
Section 1102.2.1 prohibits mixing refrigerants with different designations in a system. The only path is where the manufacturer permits adding a second refrigerant and the amount and type follow its instructions (the 2021 text gives improved low-temperature oil return as the example; the 2024 text also requires that the safety group not change). An owner declaration or matching safety group alone is not enough.
Reference: International Mechanical Code (2021 and 2024, SC edition), Section 1102.2.1
An evaporator is operating with a saturation temperature of 22 F at the suction pressure measured at the compressor. A thermometer on the suction line near the compressor reads 33 F. What is the superheat?
Answer: 11 F
Superheat equals the actual suction line temperature minus the saturation temperature at the measured suction pressure: 33 - 22 = 11 F. Adding the two numbers (55 F) is a common error, and 22 F or 33 F are simply one of the readings.
Reference: Copeland Refrigeration Manual Part 1 (AE101), Fundamentals of Refrigeration, 2024, Section 1, Superheated Vapor
A system operates with a discharge pressure of 250 psig and a suction pressure of 40 psig. Using 14.7 psi for atmospheric pressure, what is the compression ratio?
Answer: 4.8
Compression ratio uses absolute pressures: discharge 250 + 14.7 = 264.7 psia; suction 40 + 14.7 = 54.7 psia; 264.7 / 54.7 = 4.84. Using gauge pressures gives 6.3 (250 / 40) and inverting the ratio gives 0.21. A high ratio lowers volumetric efficiency and raises discharge temperature.
Reference: Copeland Refrigeration Manual Part 1 (AE101), Fundamentals of Refrigeration, 2024, Section 3, Volumetric Efficiency of the Reciprocating Compressor (compression ratio); Section 1, Absolute Pressure
Under the EPA venting prohibition in 40 CFR 82.154, which of the following substances is exempt from the prohibition when used as a refrigerant substitute?
Answer: Nitrogen
Section 82.154(a)(1) lists exempt substitutes including carbon dioxide, nitrogen and water in any application. HFC refrigerants such as R-134a, R-410A and R-404A are not on that list, so knowingly venting them is prohibited.
Reference: 40 CFR Part 82, Subpart F (EPA Section 608), Section 82.154(a)(1)
A technician will service a walk-in cooler that uses a medium- or high-pressure refrigerant such as R-404A. Which EPA technician certification is required at minimum?
Answer: Type II
Section 82.161(a)(1)(ii) requires Type II certification for persons who maintain, service, repair or dispose of medium-, high- or very high-pressure appliances other than small appliances. Type I is for small appliances, Type III for low-pressure appliances, and Universal covers all three types.
Reference: 40 CFR Part 82, Subpart F (EPA Section 608), Section 82.161(a)(1)
A semi-hermetic compressor with an oil pump reads 62 psig at the oil pump outlet and 38 psig in the crankcase. What is the net oil pressure the oil safety control senses?
Answer: 24 psi
Net oil pressure equals oil pump discharge pressure minus crankcase pressure: 62 - 38 = 24 psi. The oil safety control compares those two pressures; adding them (100) or reading either alone ignores the crankcase back-pressure on the oil pump.
Reference: Copeland Refrigeration Manual Part 2, Refrigeration System Components, 2024, Section 4, Lubrication (net oil pump pressure = pump outlet pressure minus crankcase pressure)
A suction line has 60 ft of straight pipe, six long-radius elbows rated at 2.0 ft equivalent length each and one angle valve rated at 8 ft equivalent length. What is the total equivalent length?
Answer: 80 ft
Equivalent length = straight run + elbows + valve = 60 + (6 x 2.0) + 8 = 60 + 12 + 8 = 80 ft. 72 ft leaves out the valve, 68 ft leaves out the elbows and 60 ft counts only the straight pipe.
Reference: Copeland Refrigeration Manual Part 4, System Design, 2024, Section 18, Equivalent Length of Pipe
In which direction should a horizontal suction line be pitched?
Answer: Slightly downward toward the compressor
Pitching the line toward the compressor helps oil and any liquid refrigerant drain to the compressor rather than collect in low spots. Pitch away from the compressor leaves oil trapped in the evaporator.
Reference: Copeland Refrigeration Manual Part 4, System Design, 2024, Section 18, Piping Design for Horizontal and Vertical Lines (pitch downward in direction of flow)
Why must the inside of copper refrigerant tubing be purged with nitrogen while it is being brazed?
Answer: To keep oxide scale from forming inside the tube and later plugging the system
Brazing temperatures in open air form black copper oxide inside the tube; the scale breaks loose later and plugs strainers, expansion valves and filter-driers. Section 1108.3.1 requires purging with oxygen-free nitrogen, helium or argon and then keeping a flow of 1.0 to 3.0 psi through the piping while brazing.
Reference: International Mechanical Code (2021 and 2024, SC edition), Section 1108.3.1, Brazed Joints; Copeland Refrigeration Manual Part 5 (2024), Section 26, Brazing Refrigerant Lines
A technician sets a condensing unit near the unprotected edge of a flat roof that is 14 ft above the ground. At what height does OSHA require fall protection at an unprotected side or edge in construction?
Answer: 6 feet or more above a lower level
Section 1926.501(b)(1) requires guardrails, safety nets or personal fall arrest systems for employees on a walking/working surface with an unprotected side or edge 6 ft or more above a lower level. The 14 ft roof edge is well above that threshold.
Reference: 29 CFR 1926 (OSHA construction standards), Section 1926.501(b)(1)
Sources
- PSI: South Carolina Contractor's Licensing Board Candidate Information Bulletin (updated 9/15/2026) (opens in a new tab)
- South Carolina Contractor's Licensing Board (LLR) (opens in a new tab)
- South Carolina Code of Laws Title 40 Chapter 11 (contractors) (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.