Requirements at a glance
| Agency | South Carolina Department of Labor, Licensing and Regulation (LLR), Contractor's Licensing Board; exams by PSI |
|---|---|
| Experience | The primary qualifying party needs 2 of the last 5 years of full-time experience in the classification, in a management role (S.C. Code 40-11-230) |
| Exams | Heating: 50 questions, 3 hours, 70%, plus Business Management and Law (Commercial); 70% on each |
| Books allowed | IMC and IFGC 2021 or 2024 (SC), the Steingress boiler texts, ACCA Manuals N and J and the Pipefitter's Handbook |
| Fees | PSI exam fees ($64 to $78 per exam), plus the Board's application and license fees and a financial statement or bond |
Applicants for a South Carolina Contractor's Licensing Board mechanical license in the Heating classification.
Official links
How to get licensed, step by step
Check the work needs a license
South Carolina requires a Contractor's Licensing Board license for commercial work above $10,000 in job cost (S.C. Code 40-11-30). Commercial licenses also cover residential work.
SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)
Apply to the Board
Apply to the Contractor's Licensing Board for an eligibility letter before you register with PSI.
Schedule Business and Law and the heating exam with PSI
Register for each exam separately. You may take each trade exam twice in 12 months, then once every six months. Commercial Business and Law has no such limit.
Schedule with PSI (commercial contractors) (opens in a new tab)
Apply for the license
After you pass, the business entity applies with its primary qualifying party, a financial statement or bond, and the license fee. The group (1 to 5) sets the dollar limit of work you may bid.
SC Contractor's Licensing Board (LLR) (opens in a new tab)S.C. Code Title 40 Chapter 11 (contractors) (opens in a new tab)
How to prepare
- Code editions are changing. From November 1, 2026 PSI accepts the 2021 or the 2024 South Carolina codes (ICC codes with state modifications) and the 2023 or the 2020 NEC. After July 1, 2027 only the 2024 codes and the 2023 NEC. Bring one edition you know well and expect questions that read the same in both.
- Tab your books before exam day: highlighting, underlining and permanent tabs are allowed, but sticky notes and writing during the exam are not.
- Boilers are 12 of 50 questions (low pressure 7, high pressure 5): the two Steingress texts on PSI's list are the source.
- Code compliance (8), load calculation (7), fuel gas systems (6) and piping (6) come from the IMC, IFGC and Manuals N and J.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the SC IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2021 or 2024 edition with South Carolina modificationsEssential
On PSI's list. Ducts, ventilation, equipment, venting and piping for the air conditioning and residential HVAC exams.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
International Fuel Gas Code (IFGC), 2021 or 2024 edition with South Carolina modifications
On PSI's list. Gas piping sizing, venting, combustion air and appliance installation.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
Modern Refrigeration and Air Conditioning (Goodheart-Willcox)
On PSI's list (21st or 22nd Edition for air conditioning; 19th or 20th for residential HVAC). Refrigeration cycle, components, controls and piping.
Official reference list (as published by the testing agency)
- International Mechanical Code (IMC), 2021 or 2024 edition with South Carolina modifications
- International Fuel Gas Code (IFGC), 2021 or 2024 edition with South Carolina modifications
- Low Pressure Boilers, 5th Edition (Steingress and Walker); High Pressure Boilers, 6th Edition (Steingress and Frost)
- ACCA Manual N, 5th Edition; Manual J, 8th Edition; Trane and ACCA ductulators
- Pipefitter's Handbook, 3rd Edition; Modern Refrigeration and Air Conditioning, 21st or 22nd Edition; Whitman, Refrigeration and Air Conditioning Technology, 6th Edition (all on PSI's list)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Code Compliance | 8 | |
| HARV General | 4 | |
| HARV Controls | 4 | |
| HARV Load Calculation | 7 | |
| Fuel Gas Systems | 6 | |
| Piping | 6 | |
| Ducts | 3 | |
| Boilers - Low Pressure | 7 | |
| Boilers - High Pressure | 5 |
Exam day details
- Administered by PSI Services for the South Carolina Department of Labor, Licensing and Regulation (Contractor's Licensing Board).
- Fee: $78 to PSI. Board application and license fees are separate.
- 50 scored questions plus 1 to 10 unscored experimental items (they count against your time) in 180 minutes; 35 correct (70%).
- Code editions: from November 1, 2026 PSI accepts the 2021 or 2024 South Carolina codes (NEC 2023 or 2020); after July 1, 2027 only the 2024 codes and the 2023 NEC. Our questions are written to be correct under both.
- Open book: bring the references on PSI's list. You may highlight, underline and add permanent tabs (tabs that would tear the page if removed); sticky notes and removable tabs are not allowed.
- Apply to the Contractor's Licensing Board first. After approval you get an eligibility letter and register with PSI (855-340-3701) for each exam; the registration confirmation is valid 1 year or until a classification has been failed twice.
- You may take each trade exam twice in 12 months, then once every six months.
- Every Contractor's Licensing Board license needs the Business Management and Law exam and the technical exam for the classification, 70% on each (S.C. Code 40-11-230).
Frequently asked questions
What's on the South Carolina heating exam?
50 scored questions: code compliance 8, load calculation 7, low pressure boilers 7, fuel gas systems 6, piping 6, high pressure boilers 5, HARV general 4, HARV controls 4 and ducts 3.
Are boilers on the heating exam?
Yes. Low pressure boilers are 7 questions and high pressure boilers 5, from the Steingress texts on PSI's list.
Is heating different from air conditioning?
Yes. They are separate classifications with separate exams, though both draw on the IMC and IFGC.
Free questions with answers
Show all 10 free questions and answers
A new commercial gas piping system has an internal volume of 1,200 cubic feet and is not in a single-family dwelling. Under the IFGC, what is the minimum test duration?
Answer: 1.5 hours
IFGC 406.4.2 requires 1/2 hour for each 500 cubic feet of pipe volume or fraction thereof. 1,200 / 500 = 2.4, and the fraction counts as a full increment, so 3 increments x 0.5 hour = 1.5 hours. Using 2 increments gives 1 hour and using the raw 2.4 gives 1.2 hours; the 24-hour figure is only the upper limit a test is never required to exceed.
Reference: International Fuel Gas Code (2021 and 2024, SC edition), Section 406.4.2
A boiler room has a 180,000 Btu/h boiler and a 40,000 Btu/h water heater, all using indoor combustion air only, with no known air-infiltration rate. By the IFGC standard method, what minimum room volume is required?
Answer: 11,000 cubic feet
IFGC 304.5.1 requires 50 cubic feet per 1,000 Btu/h of the appliance input rating, summed for all appliances in the space. Total input = 180,000 + 40,000 = 220,000 Btu/h, so 220 x 50 = 11,000 cubic feet. Using only the larger appliance gives 9,000, and 20 cubic feet per 1,000 Btu/h (an older rule of thumb) gives 4,400.
Reference: International Fuel Gas Code (2021 and 2024, SC edition), Section 304.5.1
Equipment is placed on a roof so that personnel must climb higher than a certain height above grade. Above what height does the IFGC require a permanent interior or exterior means of access?
Answer: 16 feet
IFGC 306.5 requires a permanent means of access (not a portable ladder) where service personnel would have to climb higher than 16 feet above grade to reach appliances or equipment on a roof or elevated structure. The access cannot require climbing over obstructions taller than 30 inches or walking on roofs steeper than 4 in 12. Group R-3 occupancies are exempt.
Reference: International Fuel Gas Code (2021 and 2024, SC edition), Section 306.5
How must a safety or relief valve be installed on a boiler under the IMC?
Answer: Directly in the valve opening on the boiler, with no shutoff valve on either side of its connection
IMC 1006.5 requires safety and relief valves to be installed directly into the safety or relief valve opening on the boiler or pressure vessel, with no valves located on either side of the valve connection, and the valve must discharge by gravity. A shutoff valve could block the valve from relieving pressure, which defeats its purpose.
Reference: International Mechanical Code (2021 and 2024, SC edition), Section 1006.5
What is the lowest steam operating pressure at which a boiler is classed as a high-pressure steam boiler?
Answer: Above 15 psig
The IMC definition of Boiler (Section 202) classes steam boilers operating at not more than 15 psi as low-pressure and those operating above 15 psi as high-pressure (for water the dividing line is 160 psi). In general practice high-pressure (power) boilers are built to ASME Section I and low-pressure heating boilers to Section IV. The 100 psig figure matters for the two-blowoff-valve rule in IMC 1008.1, not for the classification.
Reference: International Mechanical Code (2021 and 2024, SC edition), Section 202, definition of Boiler
A 1-inch CPVC hot water heating branch runs horizontally in a mechanical room. What is the maximum horizontal support spacing under IMC Table 305.4?
Answer: 3 feet
IMC Table 305.4 lists CPVC pipe or tubing 1 inch and smaller at 3 feet horizontal; CPVC 1 1/4 inches and larger is 4 feet. The 10-foot value is the vertical spacing, and 8 feet applies to copper tubing. Read the size break in the row label before choosing.
Reference: International Mechanical Code (2021 and 2024, SC edition), Table 305.4
Flexible air connectors are limited to what maximum length under the IMC?
Answer: 14 feet
IMC 603.6.2.1 limits flexible air connectors to 14 feet in length. Do not confuse them with flexible air ducts, which 603.6.1.1 does not limit in length.
Reference: International Mechanical Code (2021 and 2024, SC edition), Section 603.6.2.1
A warm-air furnace delivers 1,200 cfm with a 40 degree F temperature rise across the heat exchanger. Using Q = 1.08 x cfm x temperature rise for standard air, what is the sensible heat delivered to the air?
Answer: 51,840 Btu/h
Sensible heat for standard air is Q = 1.08 x cfm x delta T = 1.08 x 1,200 x 40 = 51,840 Btu/h. Dropping the 1.08 factor gives 48,000, and using a factor of 1.2 gives 57,600. The 1.08 comes from 0.24 Btu/lb-degree F x 0.075 lb/ft3 x 60 min/h.
Reference: HVAC fundamentals (general practice), Sensible heat equation, Q = 1.08 x cfm x delta T
In which order do the major events normally occur on a fan-assisted gas furnace with an induced draft inducer and a pressure switch?
Answer: Inducer starts, pressure switch proves draft, igniter heats, gas valve opens, blower starts after a delay
On a call for heat the inducer starts first, the pressure switch proves airflow through the vent, the igniter warms up, the gas valve opens and flame is proven, and the blower starts after a delay so it does not blow cold air. Opening gas before proving draft would be unsafe.
Reference: HVAC controls fundamentals (general practice), Sequence of operation: induced-draft furnace
A wall has a net area of 600 square feet, a total R-value of 15 and a design temperature difference of 50 degrees F. Using Q = A x delta T / R, what is the wall heat loss?
Answer: 2,000 Btu/h
Q = A x delta T / R = 600 x 50 / 15 = 2,000 Btu/h. Leaving out R gives 600 x 50 = 30,000, multiplying by R instead of dividing gives 450,000, and leaving out the temperature difference gives 600 / 15 = 40. The same conduction step (U = 1/R) is used in Manual J and other load methods.
Reference: Heat loss calculation fundamentals (general practice), Conduction heat loss, Q = A x delta T / R
Sources
- PSI: South Carolina Contractor's Licensing Board Candidate Information Bulletin (updated 9/15/2026) (opens in a new tab)
- South Carolina Contractor's Licensing Board (LLR) (opens in a new tab)
- South Carolina Code of Laws Title 40 Chapter 11 (contractors) (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.