Rhode Island licensing exam

Rhode Island Well Driller Exam: Practice Test & Licensing Guide

The CRB's PSI exam for a Rhode Island well driller license: 50 open-book questions in 2 hours on drilling methods, wells and pumps, casing, grouting, contamination prevention and safety. 70% to pass.

Questions
50
Time limit
2 hours
Passing score
70%
Books
Open book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Knowledge

Under the Rhode Island well-drilling licensing law, 'well drilling' covers constructing or altering a water-supply well by which methods?

Requirements at a glance

AgencyRhode Island Contractors' Registration and Licensing Board (CRB); exam by PSI
Exam50 questions, 2 hours, open book, 70% to pass (35 correct)
ExperienceNone to sit the exam; the CRB has its own licensing requirements
Books allowed29 CFR 1926; Driscoll's Groundwater and Wells; Todd and Mays, Groundwater Hydrology; NGWA Manual of Water Well Construction Practices; DEM drinking water well drilling rules (1989); RI Plumbing Code 2019; Water Systems Handbook; AWWA A100-06
Fees$180 to PSI per exam; CRB application and license fees are separate

Anyone who builds, installs or alters a water-supply well by drilling, coring, boring, driving, jetting or digging, licensed by the Contractors' Registration and Licensing Board.

How to get licensed, step by step

  1. Schedule with PSI and sit the exam

    No application is needed first: register at test-takers.psiexams.com/ricon or call 855-746-8173, pay the $180 fee (valid for one year, not refundable or transferable), and bring two forms of signed ID, one with a photo. You see your result when you finish.

    Schedule with PSI (Rhode Island CRB) (opens in a new tab)PSI: Rhode Island CRB Candidate Information Bulletin (opens in a new tab)

  2. Apply to the CRB

    After you pass, send your application to the CRB, which has its own requirements and fees. If you fail, you retake the exam (and pay again) before you can apply.

    Rhode Island Contractors' Registration and Licensing Board (opens in a new tab)

How to prepare

  • Wells and pumps (10) and drilling methods (10) are 20 of 50 questions.
  • The exam is open book with permanent tabs and highlighting only; no writing in your books, no sticky notes. 70% to pass, and 1 to 5 unscored experimental questions may be added.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

    Official reference list (as published by the testing agency)
    • 29 CFR Part 1926 (OSHA construction), latest amendments, or 29 CFR 1926 Selections by PSI
    • Groundwater and Wells, Fletcher G. Driscoll, 3rd Edition
    • Groundwater Hydrology, Todd and Mays, 3rd Edition, 2005
    • Manual of Water Well Construction Practices, 3rd Edition, 2017 (National Ground Water Association)
    • Rules and Regulations Governing the Enforcement of Chapter 46-13:2 Relating to the Drilling of Drinking Water Wells, 1989 (Department of Environmental Management)
    • State of Rhode Island Plumbing Code, 2019 (ICC)
    • Water Systems Handbook, 12th Edition (Water Systems Council)
    • Water Wells, AWWA Standard A100-06

    What's on the exam

    Official content outline from PSI Services (number of questions per topic):

    TopicQuestions
    General Knowledge6
    Casing and Screens5
    Grouting and Sealing5
    Safety6
    Testing3
    Contamination and Prevention5
    Wells and Pumps10
    Drilling Methods10

    Exam day details

    • Administered by PSI Services for the Rhode Island Contractors' Registration and Licensing Board (CRB).
    • Fee: $180 to PSI per exam. Not refundable or transferable, and valid for one year from payment. CRB application and license fees are separate.
    • 50 questions in 2 hours; 35 correct (70%) to pass.
    • Open book: bring your own copies of the listed references. You may highlight, underline and index them with permanent tabs, but not write in them; sticky notes and loose papers are removed.
    • A small number (1 to 5) of unscored experimental questions may be added; their time doesn't count against your time.
    • Bring two forms of ID with your signature, one with a photo, in the name on your registration, and arrive 30 minutes early.
    • There are no prerequisites to sit the exam. You pass it first and then apply to the CRB. You see your result when you finish, and you pay again to retake.
    • The PSI bulletin says code questions use only the edition listed; other references may use later editions.

    Frequently asked questions

    What's on the Rhode Island well driller exam?

    50 questions: wells and pumps 10, drilling methods 10, general knowledge 6, safety 6, casing and screens 5, grouting and sealing 5, contamination and prevention 5 and testing 3.

    Which books can I bring?

    The references listed above, including Driscoll's Groundwater and Wells, the NGWA Manual of Water Well Construction Practices and the 1989 DEM well drilling rules. Check the current PSI bulletin for editions.

    Does the exam cover pump installation too?

    Pump installers take a separate exam. The well driller exam has a wells and pumps section (10 questions).

    Free questions with answers

    Show all 10 free questions and answers
    1. Under the Rhode Island well-drilling licensing law, 'well drilling' covers constructing or altering a water-supply well by which methods?

      Answer: Drilling, coring, boring, washing, driving, digging, jetting, or any other construction method

      R.I. Gen. Laws 5-65.2-2(17) defines well drilling as all acts to construct, install or alter a water-supply well, or to obtain water from one, by drilling, excavation that is drilled, cored, bored, washed, driven, dug, jetted or otherwise constructed. The definition is method-neutral, so driven, jetted and dug wells are included.

      Reference: R.I. Gen. Laws Chapter 5-65.2 (Well-Drilling, Pump Installers, and Water-Filtration Contractors Licensing Law), 5-65.2-2(17)

    2. A bedrock well must be completed with watertight casing and casing seal to what minimum depth?

      Answer: At least 18 feet below land surface and at least 5 feet into the bedrock

      Section 6.24.9(C) requires both conditions: 18 feet below land surface and no less than 5 feet into bedrock. Whichever gives the deeper casing governs.

      Reference: Rhode Island CRLB Rules for Well-Drillers, Pump Installers and Water Filtration Contractors (440-RICR-10-00-6), 6.24.9(C)

    3. Under the CRLB well-driller definitions, how is neat cement grout mixed?

      Answer: No more than six gallons of clear water to one bag of cement

      Section 6.4.1(A)(56) defines neat cement grout as a mixture of not more than six gallons of clear water to one bag of cement. Adding sand makes it sand cement grout, and bentonite makes it a bentonite cement grout.

      Reference: Rhode Island CRLB Rules for Well-Drillers, Pump Installers and Water Filtration Contractors (440-RICR-10-00-6), 6.4.1(A)(56)

    4. A boom truck will work near a 500 kV transmission line. What minimum clearance does OSHA Table A in 1926.1408 require?

      Answer: 25 feet

      Table A includes the upper value of each band: over 350 to 500 kV requires 25 feet. 20 feet covers over 200 to 350 kV, and 35 feet covers over 500 to 750 kV. Subpart CC covers cranes and boom trucks (for example one used to set casing or pull a pump); 1926.1400(c)(11) excludes dedicated drilling rigs.

      Reference: 29 CFR Part 1926 (OSHA Construction Standards), 1926.1408 Table A

    5. In a pump test a well produces 21 gpm. The static level is 28 feet and the pumping level is 91 feet. What is the specific capacity, to two decimal places?

      Answer: 0.33 gpm per foot of drawdown

      Drawdown = 91 - 28 = 63 ft. Specific capacity = 21 gpm / 63 ft = 0.33 gpm/ft (6.4.1(A)(92)). 3.00 inverts the ratio, 0.23 divides by the 91 ft pumping level, and 0.75 divides by the 28 ft static level.

      Reference: Rhode Island CRLB Rules for Well-Drillers, Pump Installers and Water Filtration Contractors (440-RICR-10-00-6), 6.4.1(A)(92)

    6. How is the minimum distance from a new well to a road measured under 6.24.6(A)(1)?

      Answer: 25 feet from the edge of the road surface

      The isolation table in 6.24.6(A)(1) gives roads as 25 feet measured from the edge of the road surface, not the centerline or the right-of-way.

      Reference: Rhode Island CRLB Rules for Well-Drillers, Pump Installers and Water Filtration Contractors (440-RICR-10-00-6), 6.24.6(A)(1)

    7. When the base plate of a pump sits directly over the well, what must the base plate be designed to do?

      Answer: Form a watertight seal with the well casing or pump foundation

      Section 6.24.6(F)(3) requires a base plate placed directly over the well to be a type that forms a watertight seal with the casing or pump foundation. Venting is done through a separate screened vent.

      Reference: Rhode Island CRLB Rules for Well-Drillers, Pump Installers and Water Filtration Contractors (440-RICR-10-00-6), 6.24.6(F)(3)

    8. Which code governs the electrical wiring used with a well pump under the CRLB rules?

      Answer: The Rhode Island electrical code, SBC-5

      Sections 6.24.6(F)(6) and 6.24.17 require pump wiring and any electrical work to meet the State of Rhode Island electrical code, SBC-5. The plumbing code SBC-3 applies to plumbing work. Licensed contractors may do only the limited electrical work from a drop or wall switch.

      Reference: Rhode Island CRLB Rules for Well-Drillers, Pump Installers and Water Filtration Contractors (440-RICR-10-00-6), 6.24.6(F)(6); 6.24.17

    9. A well made by driving a well-point fitted to the end of a pipe section into the ground is called what?

      Answer: A driven well

      Section 6.4.1(A)(33) defines a driven well as one constructed by driving a well-point fitted to the end of a pipe section or series of sections into the ground.

      Reference: Rhode Island CRLB Rules for Well-Drillers, Pump Installers and Water Filtration Contractors (440-RICR-10-00-6), 6.4.1(A)(33)

    10. A well excavated using a high velocity jet of water is classified as what?

      Answer: A jetted well

      Section 6.4.1(A)(49) defines a jetted well as one in which the excavation is made with a high velocity jet of water.

      Reference: Rhode Island CRLB Rules for Well-Drillers, Pump Installers and Water Filtration Contractors (440-RICR-10-00-6), 6.4.1(A)(49)

    Sources

    Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.