Rhode Island licensing exam

Rhode Island Pump Installer Exam: Practice Test & Licensing Guide

The CRB's PSI exam for a Rhode Island pump installer license: 40 open-book questions in 100 minutes on pump installation and repair, electrical, water chemistry, piping and tanks. 70% to pass.

Questions
40
Time limit
100 min
Passing score
70%
Books
Open book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Pump Installation and Repair

After setting a new submersible pump and finishing the connections, what does the CRLB rule require the pump installer to do with the well?

Requirements at a glance

AgencyRhode Island Contractors' Registration and Licensing Board (CRB); exam by PSI
Exam40 questions, 100 minutes, open book, 70% to pass (28 correct)
ExperienceNone to sit the exam; the CRB has its own licensing requirements
Books allowed29 CFR 1926; Driscoll; Todd and Mays; NGWA Manual; 2017 NEC; RI Plumbing Code 2019; Water Systems Handbook; AWWA A100-06
Fees$180 to PSI per exam; CRB application and license fees are separate

Anyone who installs, repairs or services well pumps, pressure tanks and the connections between wells and building water systems, licensed by the Contractors' Registration and Licensing Board.

How to get licensed, step by step

  1. Schedule with PSI and sit the exam

    No application is needed first: register at test-takers.psiexams.com/ricon or call 855-746-8173, pay the $180 fee (valid for one year, not refundable or transferable), and bring two forms of signed ID, one with a photo. You see your result when you finish.

    Schedule with PSI (Rhode Island CRB) (opens in a new tab)PSI: Rhode Island CRB Candidate Information Bulletin (opens in a new tab)

  2. Apply to the CRB

    After you pass, send your application to the CRB, which has its own requirements and fees. If you fail, you retake the exam (and pay again) before you can apply.

    Rhode Island Contractors' Registration and Licensing Board (opens in a new tab)

How to prepare

  • Pump installation and repair (15) and electrical (10) are 25 of 40 questions.
  • The bulletin lists the 2017 NEC for this exam, although the state building code has moved to the 2023 NEC. Check the current bulletin.
  • The exam is open book with permanent tabs and highlighting only; no writing in your books, no sticky notes. 70% to pass, and 1 to 5 unscored experimental questions may be added.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

    Official reference list (as published by the testing agency)
    • 29 CFR Part 1926 (OSHA construction), latest amendments, or 29 CFR 1926 Selections by PSI
    • Groundwater and Wells, Fletcher G. Driscoll, 3rd Edition
    • Groundwater Hydrology, Todd and Mays, 3rd Edition, 2005
    • Manual of Water Well Construction Practices, 3rd Edition, 2017 (National Ground Water Association)
    • NFPA 70 National Electrical Code, 2017
    • State of Rhode Island Plumbing Code, 2019 (ICC)
    • Water Systems Handbook, 12th Edition (Water Systems Council)
    • Water Wells, AWWA Standard A100-06

    What's on the exam

    Official content outline from PSI Services (number of questions per topic):

    TopicQuestions
    Pump Installation and Repair15
    Electrical10
    Water and Water Chemistry5
    Piping and Tanks5
    Safety3
    Hydrology/Well Hydraulics2

    Exam day details

    • Administered by PSI Services for the Rhode Island Contractors' Registration and Licensing Board (CRB).
    • Fee: $180 to PSI per exam. Not refundable or transferable, and valid for one year from payment. CRB application and license fees are separate.
    • 40 questions in 100 minutes; 28 correct (70%) to pass.
    • The bulletin lists the 2017 NEC for this exam, while the state building code has since moved to the 2023 NEC. Code questions follow the edition the bulletin lists.
    • Open book: bring your own copies of the listed references. You may highlight, underline and index them with permanent tabs, but not write in them; sticky notes and loose papers are removed.
    • A small number (1 to 5) of unscored experimental questions may be added; their time doesn't count against your time.
    • Bring two forms of ID with your signature, one with a photo, in the name on your registration, and arrive 30 minutes early.
    • There are no prerequisites to sit the exam. You pass it first and then apply to the CRB. You see your result when you finish, and you pay again to retake.
    • The PSI bulletin says code questions use only the edition listed; other references may use later editions.

    Frequently asked questions

    What's on the Rhode Island pump installer exam?

    40 questions: pump installation and repair 15, electrical 10, water and water chemistry 5, piping and tanks 5, safety 3 and hydrology and well hydraulics 2.

    Which NEC edition is used?

    The PSI bulletin lists the 2017 NEC for this exam. Check the current bulletin on your test date.

    How long is the exam?

    100 minutes for 40 questions, with 28 correct needed.

    Free questions with answers

    Show all 10 free questions and answers
    1. After setting a new submersible pump and finishing the connections, what does the CRLB rule require the pump installer to do with the well?

      Answer: Disinfect the well after the pump is installed

      Section 6.24.6(F)(7) says the pump installer shall disinfect a well subsequent to installation of a pump. Section 6.24.18 ties the method to the Rhode Island Department of Health well disinfection guidelines. The 10-day completion report in 6.24.16 belongs to the licensed well contractor after a new, reconstructed, replacement or decommissioned well.

      Reference: 440-RICR-10-00-6 (CRLB rules for well-drillers, pump installers and water filtration contractors), Sections 6.24.6(F)(7) and 6.24.18

    2. Wiring used with a pump on a Rhode Island private well must conform to which code, according to the pump rules?

      Answer: The Rhode Island electrical code (SBC-5)

      Section 6.24.6(F)(6) requires pump wiring to conform to the Rhode Island electrical code, SBC-5. Section 6.24.17 repeats that any electrical or plumbing work done under these rules must meet SBC-5 and SBC-3. The manufacturer's diagram is followed too, but it does not replace the code.

      Reference: 440-RICR-10-00-6 (CRLB rules for well-drillers, pump installers and water filtration contractors), Sections 6.24.6(F)(6) and 6.24.17

    3. A 3 hp, 230-volt, single-phase pump motor has a nameplate full-load current of 15.6 A. What is the minimum conductor ampacity under the NEC?

      Answer: 21.25 amperes

      For sizing conductors the NEC uses the table full-load current, not the nameplate (Section 430.6(A)(1)). Table 430.248 gives 17 A for 3 hp at 230 V, and Section 430.22 requires 125 percent: 17 x 1.25 = 21.25 A. Using the nameplate would give 15.6 x 1.25 = 19.5 A, 17 A alone omits the 125 percent, and 42.5 A is the 250 percent breaker figure.

      Reference: NFPA 70 National Electrical Code (NEC), 2017 edition (edition listed in the PSI bulletin; unchanged in 2023), Sections 430.6(A)(1) and 430.22; Table 430.248

    4. Where must the disconnecting means for a pump motor controller be located relative to the controller?

      Answer: In sight from the controller location

      Section 430.102(A) requires an individual disconnecting means for each motor controller, located in sight from the controller location. Section 430.102(B) separately requires a means to disconnect the motor, and 430.102(B) allows the controller disconnect to serve as the motor disconnect when it is in sight of the motor.

      Reference: NFPA 70 National Electrical Code (NEC), 2017 edition (edition listed in the PSI bulletin; unchanged in 2023), Section 430.102(A)

    5. How many feet of water head does 1 psi of pressure represent?

      Answer: 2.31 feet

      One foot of water produces about 0.433 psi, so 1 psi equals 1 / 0.433 = 2.31 feet of head. The reverse figure of 0.433 is psi per foot, and 8.34 is the weight of a gallon of water in pounds.

      Reference: Standard hydraulic relationships for water (pressure head and gallon volume), Pressure to head conversion (1 psi = 2.31 ft)

    6. A submersible pump must deliver water at 50 psi at the house. The pumping water level is 180 feet below the pressure tank, and pipe friction loss is 12 feet. What total dynamic head must the pump produce?

      Answer: 307.5 feet

      Convert the pressure to head: 50 psi x 2.31 = 115.5 ft. Total dynamic head = lift 180 + pressure 115.5 + friction 12 = 307.5 ft. Adding 50 as feet gives 242 ft, leaving out friction gives 295.5 ft, and converting with 0.433 gives 213.7 ft.

      Reference: Standard hydraulic relationships for water (pressure head and gallon volume), Total dynamic head with pressure converted to feet

    7. Which of the following does the CRLB rule list in its definition of 'contamination' of potable water?

      Answer: The presence of coliform organisms or harmful material that may gain access to the water

      Section 6.4.1 defines contamination as the presence of sewage, industrial wastes, organisms of the coliform group, or harmful or objectionable material which is in, or may gain access to, potable water. It is not limited to taste or a single chemical.

      Reference: 440-RICR-10-00-6 (CRLB rules for well-drillers, pump installers and water filtration contractors), Section 6.4.1, definition of contamination

    8. Water that contains such a high load of naturally dissolved chemical constituents that its beneficial uses are limited is called what in the CRLB rules?

      Answer: Mineralized water

      Section 6.4.1 defines mineralized water as naturally occurring ground water containing an amount of dissolved chemical constituents limiting the beneficial uses to which the water may be applied. Section 6.24.6(D)(7) requires wells yielding contaminated or mineralized water that cannot be used to be cased and sealed off to protect other zones.

      Reference: 440-RICR-10-00-6 (CRLB rules for well-drillers, pump installers and water filtration contractors), Sections 6.4.1 and 6.24.6(D)(7)

    9. In the CRLB rules, what is 'drawdown'?

      Answer: The vertical distance between the pumping level and the static water level

      Section 6.4.1 defines drawdown as the difference in vertical distance between the pumping level and the static water level in a well or the area outside it. Do not confuse it with tank drawdown, which is the water a pressure tank delivers between cut-in and cut-out.

      Reference: 440-RICR-10-00-6 (CRLB rules for well-drillers, pump installers and water filtration contractors), Section 6.4.1, definition of drawdown

    10. OSHA requires testing the air before workers enter an excavation deeper than what depth where a hazardous atmosphere is expected, and below what oxygen level is air considered deficient?

      Answer: Deeper than 4 feet; below 19.5 percent oxygen

      29 CFR 1926.651(g)(1)(i) requires atmospheres to be tested before workers enter excavations greater than 4 feet deep where oxygen deficiency (less than 19.5 percent oxygen) or a hazardous atmosphere exists or could reasonably be expected to exist, such as near stored hazardous substances.

      Reference: 29 CFR Part 1926 (OSHA construction standards), 29 CFR 1926.651(g)(1)(i)

    Sources

    Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.