Rhode Island licensing exam

Rhode Island Residential Water-Filtration Contractor Exam: Practice Test & Licensing Guide

The CRB's PSI exam for a Rhode Island residential water-filtration/treatment-system contractor license: 35 open-book questions in 90 minutes, mostly water conditioning, piping and Rhode Island rules. 70% to pass.

Questions
35
Time limit
90 min
Passing score
70%
Books
Open book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10RI Rules and Regulations

Along with the written contract for work over $1,000, what notice must the contractor give the homeowner under R.I. Gen. Laws 5-65-3(o)?

Requirements at a glance

AgencyRhode Island Contractors' Registration and Licensing Board (CRB); exam by PSI
Exam35 questions, 90 minutes, open book, 70% to pass (25 correct)
ExperienceNone to sit the exam; the CRB has its own licensing requirements
Books allowedRIGL 5-65.2; 29 CFR 1926; IRC 2015; RI Residential Code 2019; 2017 NEC; 440-RICR-10-00-6; The Drinking Water Book (Ingram); WQA Water Treatment Fundamentals
Fees$180 to PSI per exam; CRB application and license fees are separate

Contractors who install and service residential water-filtration and treatment systems on piping up to 1.5 inches at no more than 80 gallons per minute. (The CRB also licenses installers, who take a shorter, separate PSI exam that this bank doesn't cover.)

How to get licensed, step by step

  1. Schedule with PSI and sit the exam

    No application is needed first: register at test-takers.psiexams.com/ricon or call 855-746-8173, pay the $180 fee (valid for one year, not refundable or transferable), and bring two forms of signed ID, one with a photo. You see your result when you finish.

    Schedule with PSI (Rhode Island CRB) (opens in a new tab)PSI: Rhode Island CRB Candidate Information Bulletin (opens in a new tab)

  2. Apply to the CRB

    After you pass, send your application to the CRB, which has its own requirements and fees. If you fail, you retake the exam (and pay again) before you can apply.

    Rhode Island Contractors' Registration and Licensing Board (opens in a new tab)

How to prepare

  • Water conditioning (14) is 14 of 35 questions.
  • A separate 30-question installer exam exists; this bank covers the contractor exam.
  • The exam is open book with permanent tabs and highlighting only; no writing in your books, no sticky notes. 70% to pass, and 1 to 5 unscored experimental questions may be added.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

    Official reference list (as published by the testing agency)
    • Rhode Island General Laws chapter 5-65.2 (well drilling, pump installers and water-filtration contractors)
    • 29 CFR Part 1926 (OSHA construction), latest amendments, or 29 CFR 1926 Selections by PSI
    • International Residential Code for One- and Two-Family Dwellings, 2015 (ICC)
    • NFPA 70 National Electrical Code, 2017
    • Rules and Regulations for Well-Drillers, Pump Installers, and Water Filtration Contractors, 440-RICR-10-00-6
    • The Drinking Water Book, 2nd edition, Colin Ingram
    • Water Quality Association: Water Treatment Fundamentals, Seventh Edition Study Guide
    • Rhode Island Residential Code for One- and Two-Family Dwellings, 2019 (NASCLA)

    What's on the exam

    Official content outline from PSI Services (number of questions per topic):

    TopicQuestions
    RI Rules and Regulations5
    Electrical - Low Voltage Installation4
    Piping, Fittings, and Valves6
    Waste Water3
    Water Conditioning14
    OSHA Safety3

    Exam day details

    • Administered by PSI Services for the Rhode Island Contractors' Registration and Licensing Board (CRB).
    • Fee: $180 to PSI per exam. Not refundable or transferable, and valid for one year from payment. CRB application and license fees are separate.
    • 35 questions in 90 minutes; 25 correct (70%) to pass.
    • Open book: bring your own copies of the listed references. You may highlight, underline and index them with permanent tabs, but not write in them; sticky notes and loose papers are removed.
    • A small number (1 to 5) of unscored experimental questions may be added; their time doesn't count against your time.
    • Bring two forms of ID with your signature, one with a photo, in the name on your registration, and arrive 30 minutes early.
    • There are no prerequisites to sit the exam. You pass it first and then apply to the CRB. You see your result when you finish, and you pay again to retake.
    • The PSI bulletin says code questions use only the edition listed; other references may use later editions.

    Frequently asked questions

    What's on the Rhode Island water-filtration contractor exam?

    35 questions: water conditioning 14, piping, fittings and valves 6, RI rules and regulations 5, low voltage electrical installation 4, waste water 3 and OSHA safety 3.

    What is the limit on the work?

    Licensed residential water-filtration contractors may work on piping up to 1.5 inches in diameter at flow rates up to 80 gallons per minute.

    Is there a separate installer exam?

    Yes, a 30-question, 75-minute PSI exam (21 correct to pass). This bank covers the contractor exam.

    Free questions with answers

    Show all 10 free questions and answers
    1. Along with the written contract for work over $1,000, what notice must the contractor give the homeowner under R.I. Gen. Laws 5-65-3(o)?

      Answer: A notice of possible mechanic's lien

      Section 5-65-3(o) requires the contract to include consumer disclosures and a 'Notice of Possible Mechanic's Lien' warning that subcontractors and suppliers may file liens if they are not paid. Failing to give it can bring a $1,000 fine to the contractor.

      Reference: R.I. Gen. Laws Chapter 5-65 (Contractors' Registration and Licensing Board), 5-65-3(o)

    2. What minimum public liability and property damage insurance must a Rhode Island contractor keep in effect while registered?

      Answer: $500,000 combined single limit, bodily injury and property damage

      R.I. Gen. Laws 5-65-7(a) requires at least $500,000 combined single limit for bodily injury and property damage, plus workers' compensation insurance under 5-65-7(b). Failing to maintain the insurance can invalidate the registration.

      Reference: R.I. Gen. Laws Chapter 5-65 (Contractors' Registration and Licensing Board), 5-65-7(a)

    3. A technician is replacing a filter housing in an area where tools and fittings could fall from an overhead platform. What does 29 CFR 1926.100(a) require for the technician?

      Answer: A protective helmet

      Section 1926.100(a) requires protective helmets for employees working where there is a possible danger of head injury from impact, falling or flying objects, or electrical shock and burns. The other items address different hazards (air contaminants, traffic, splashes).

      Reference: 29 CFR Part 1926 (OSHA Safety and Health Regulations for Construction), 1926.100(a)

    4. A water softener's brine and rinse discharge is piped to the building drainage system. For equipment such as filters that discharges nonpotable clear water, what connection does IPC 802.1.5 require?

      Answer: An indirect waste pipe discharging through an air break or an air gap

      IPC 802.1.5 says devices such as process tanks, filters, drips and boilers that discharge nonpotable water to the drainage system must do so through an indirect waste pipe by means of an air break or an air gap. A direct connection could allow sewage backflow into the equipment.

      Reference: 2015 International Plumbing Code (reference for indirect waste; the exam's IRC 2015 plumbing chapters address the same equipment), IPC 802.1.5

    5. What is the minimum diameter of a building water service pipe under IPC 603.1?

      Answer: 3/4 inch

      IPC 603.1 requires the water service pipe to be sized for the quantities and pressures the code requires, and not less than 3/4 inch in diameter. The 1/2 inch size is common for fixture branches but is too small for a service.

      Reference: 2015 International Plumbing Code (reference for general plumbing; the exam's IRC 2015 plumbing chapters cover the same subject), IPC 603.1

    6. Using IPC Table 608.15.1, what air gap is required away from a wall for an outlet with an effective opening of 1-1/2 inches?

      Answer: 3 inches, which is two times the diameter of the effective opening

      For effective openings greater than 1 inch, Table 608.15.1 requires two times the diameter of the opening away from a wall (three times close to a wall). 2 x 1.5 inch = 3 inches. The 4-1/2 inch value is the close-to-wall figure.

      Reference: 2015 International Plumbing Code (reference for general plumbing; the exam's IRC 2015 plumbing chapters cover the same subject), IPC Table 608.15.1

    7. What kind of power source must supply a Class 2 low-voltage circuit such as a water-softener control valve?

      Answer: A listed Class 2 transformer or listed Class 2 power supply

      Article 725 requires the source of a Class 2 or Class 3 circuit to be a listed Class 2 or Class 3 transformer, a listed Class 2 or Class 3 power supply, or other listed equipment marked as a Class 2 or Class 3 source (725.121(A) in the 2017 edition). Chapter 9, Table 11(A) sets the power limits that such sources must meet.

      Reference: NFPA 70, National Electrical Code (2017 edition), 725.121(A); Chapter 9, Table 11(A)

    8. Which statement about using an underground metal water pipe as a grounding electrode is correct under NEC 250.53(D)(2)?

      Answer: It must be supplemented by another electrode of a type in 250.52(A)(2) through (A)(8)

      Section 250.53(D)(2) requires a metal underground water pipe to be supplemented by an additional electrode of a type specified in 250.52(A)(2) through (A)(8). The supplemental electrode is bonded to the grounding electrode conductor, grounded service conductor, or other specified points.

      Reference: NFPA 70, National Electrical Code (2017 edition), 250.53(D)(2)

    9. A test shows 12 mg/L of nitrate measured as nitrogen in a private well. How does this compare with the EPA primary drinking water standard?

      Answer: It exceeds the 10 mg/L maximum contaminant level

      The EPA primary MCL for nitrate is 10 mg/L as nitrogen (nitrite is 1 mg/L as nitrogen). A 12 mg/L reading exceeds it. A softener or simple carbon filter does not remove nitrate; reverse osmosis or ion exchange designed for nitrate does.

      Reference: 40 CFR Part 141 (National Primary Drinking Water Regulations), 141.62(b)

    10. A lab reports 120 mg/L hardness as CaCO3. Using 1 grain per gallon = 17.1 mg/L, what is this in grains per gallon?

      Answer: About 7.0 gpg

      Grains per gallon = mg/L / 17.1 = 120 / 17.1 = 7.0 gpg. Multiplying instead (120 x 17.1 = 2,052) is the usual error, and 17.1 / 120 = 0.14 inverts the ratio. Penn State Extension's Table 1 puts 7.0 gpg (120 mg/L) at the moderately hard/hard boundary.

      Reference: Penn State Extension, Water Softening, Hard Water/Soft Water; Table 1, Water Hardness Classification

    Sources

    Questions last verified November 17, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.