Oregon licensing exam

Oregon General Supervising Electrician Exam: Practice Test & Licensing Guide

The Oregon Building Codes Division General Supervising Electrician (S) exam: 64 open-book questions in 4 hours (52 code and 12 calculation, in 2 sections) on the NEC with Oregon amendments, Oregon electrical law and supervising duties. 75% to pass.

Questions
64
Time limit
4 hours
Passing score
75%
Books
Open book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Oregon Electrical Laws and Rules (ORS 479, OAR 918), incl. supervising duties and permits

An electrical permit was issued to a contractor at the request of its supervising electrician. The supervising electrician leaves the company before the installation is complete. Under ORS 479.560, what is the status of the permit?

Requirements at a glance

AgencyOregon Building Codes Division (BCD); state-run paper exam
ExperienceCurrent Oregon journeyman license plus 8,000 hours of journeyman work, or a journeyman equivalent plus 8,000 hours
Exam64 questions in 4 hours (52 code, 12 calculation; 2 sections), open book; 75% to pass
Books allowedOpen book: NEC with Oregon amendments, NEC Handbook, ORS 479, OAR Division 918 and the other references on BCD's list; silent non-programmable calculator
Fees$100 application fee (no separate exam fee); 24 hours of continuing education

Electricians applying to BCD for a general supervising electrician (S) license: a current Oregon journeyman license plus 8,000 hours of journeyman work (or a journeyman-equivalent plus 8,000 hours). The S is the only person who may direct installation or alteration of an electrical service and signs permits for the contractor.

How to get licensed, step by step

  1. Apply to BCD

    Send the application, proof of qualifying training and experience, a high school diploma or GED, and the fee. Choose your proctor site on the application.

    Oregon Building Codes Division: licensing (opens in a new tab)

  2. Get your Letter of Authorization

    BCD mails the letter when your application is approved. Call the proctor site on it to book; you must test within 60 days of the letter.

    BCD: license exams and locations (opens in a new tab)

  3. Take the exam

    Bring the letter, photo ID, your approved books, pencils and a silent, non-programmable calculator. 75% is the passing score.

    BCD: license exams and locations (opens in a new tab)

  4. Results and retakes

    BCD grades the exam and mails the result in about 2 weeks. After a failure, wait 30 days and send a license reapplication form.

    BCD: license exams and locations (opens in a new tab)

How to prepare

  • The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition its exams test, so our questions follow the currently adopted code. Check your Letter of Authorization and the BCD materials list before you buy books.
  • BCD publishes no outline or topic weights, so our topic split is an estimate. The exam is open book: tab your NEC with Oregon amendments, ORS 479 and OAR Division 918 and practice finding answers fast.
  • Allowed: tabs, highlighting, printed errata and short margin notes. Not allowed: practice tests, class notes, calculation examples or added pages.
  • The S is the only person who may direct installation or alteration of a service and must sign all permits, be on the contractor's regular payroll and supervise for only one employer (OAR 918-282-0140). Expect supervising-duty questions plus 12 calculation items: loads, conductor size, voltage drop, fault current and motors.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

    Official reference list (as published by the testing agency)
    • NFPA 70 / National Electrical Code (NEC) with Oregon amendments and errata
    • NEC Handbook and errata
    • Oregon Revised Statutes (ORS) Chapter 479
    • Oregon Administrative Rules (OAR) Division 918
    • American Electrician's Handbook (Hartwell); Electrical Black Book (Rapp); Ugly's Electrical References; Ferm's Fast Finder Index; Tom Henry's Key Word Index; Briganti NEC and Oregon Electrical Code key-word indexes
    • A silent, non-printing, non-programmable calculator
    • Tabs, highlighting, printed errata and short margin notes are allowed. Practice tests, class notes, calculation examples and added pages are not. (BCD materials list, rev. September 2026)

    What's on the exam

    Estimated topic weighting. No official breakdown is published:

    TopicQuestions
    Oregon Electrical Laws and Rules (ORS 479, OAR 918), incl. supervising duties and permits9
    General Requirements, Definitions, Grounding and Bonding9
    Services, Feeders and Branch Circuits12
    Wiring Methods and Materials9
    Equipment, Special Occupancies and Hazardous Locations9
    Motors, Generators and Controls5
    Electrical Calculations and Load Calculations (the 12 calc items: dwelling/commercial load, conductor size, voltage drop, fault current, motors)11

    Exam day details

    • Administered by the Oregon Building Codes Division (state-run paper exam at a proctor site).
    • Fee: No separate exam fee: the license application fee covers it ($100 for this license). Application fees are nonrefundable.
    • 64 questions, 4 hours, open book, 75% to pass (BCD license directory). BCD publishes no topic outline, so our topic split is an estimate derived from the license scope in OAR Division 918-282.
    • BCD mails a Letter of Authorization when your application is approved. Call the proctor site named on it to book; you must test within 60 days of the letter. Bring the letter and photo ID.
    • Proctor sites are in Bend, Eugene, Hermiston, Klamath Falls, Ontario, Pendleton, Portland, Roseburg, Salem and White City. BCD grades the paper exam and mails the result in about 2 weeks; results are not given by phone.
    • The passing score for all BCD licensing exams is 75%. After a failed exam you wait 30 days and send a license reapplication form; the result includes a strength and weakness report.
    • Bring your own pencils and, if you use one, a silent, non-printing, non-programmable calculator. Scratch paper is provided.
    • Qualification (BCD license directory): Current Oregon J license plus 8,000 hours of journeyman work, or J-equivalent plus 8,000 hours (OAR 918-282-0140); high school diploma or GED.
    • The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026, replacing the 2023 code. BCD does not say which edition its exams test, so our questions follow the currently adopted 2026 code; where a section number changed, the explanation also gives the 2023 number.

    Note: BCD publishes no content outline, topic weights or question-count breakdown for the electrical exams, so our topic split is an estimate. The question count and time come from the BCD license directory. Our 2026 section numbers and rules were checked against NFPA's published 2026 revision records and Oregon's amendment table rather than the printed code, and BCD does not state which code edition the exams test.

    Frequently asked questions

    Who can take the Oregon supervising electrician exam?

    Candidates who meet BCD's qualification for this license: Current Oregon J license plus 8,000 hours of journeyman work, or J-equivalent plus 8,000 hours (OAR 918-282-0140); high school diploma or GED. BCD mails a Letter of Authorization once your application is approved.

    What's on the exam?

    BCD publishes no outline or weights. Our topics follow the legal scope of the license in OAR Division 918-282 and the NEC with Oregon amendments, and our split is an estimate.

    Is the exam open book?

    Yes. You may bring the references on BCD's materials list, with tabs, highlighting and short margin notes. Practice tests, class notes and added pages are not allowed.

    What if I fail?

    Wait 30 days, then send BCD a license reapplication form to test again. Results come by mail in about 2 weeks.

    Free questions with answers

    Show all 10 free questions and answers
    1. An electrical permit was issued to a contractor at the request of its supervising electrician. The supervising electrician leaves the company before the installation is complete. Under ORS 479.560, what is the status of the permit?

      Answer: It is void upon the end of the supervising electrician's employment

      ORS 479.560(2): a permit issued to an electrical contractor on the request of the contractor's supervising electrician is void when that supervising electrician's employment ends before completion of the installation. A new permit arrangement with a qualified supervising electrician is needed.

      Reference: Oregon Revised Statutes (ORS) Chapter 479, ORS 479.560(2)

    2. Under ORS 479.620, who may direct, supervise or control the making of an electrical installation, subject to the stated exceptions?

      Answer: A person holding a supervising electrician's license

      ORS 479.620(2) prohibits directing, supervising or controlling an electrical installation without a supervising electrician's license (with exceptions in ORS 479.630). Journeymen and apprentices make installations under (3) and (4) but do not direct them.

      Reference: Oregon Revised Statutes (ORS) Chapter 479, ORS 479.620(2)

    3. What is the minimum width of the working space in front of electrical equipment that is likely to need examination, adjustment or maintenance while energized?

      Answer: 30 in., or the width of the equipment if greater

      Section 110.26(A)(2) requires the working space to be at least 30 in. wide, or the width of the equipment, whichever is greater. The space may be measured from either side of the centerline of the equipment.

      Reference: 2026 National Electrical Code (NFPA 70), 110.26(A)(2)

    4. A 200-ampere feeder is run in parallel in two raceways, each with its own copper equipment grounding conductor. Per 250.122(H), how is each conductor sized?

      Answer: From Table 250.122 using the 200 A device rating, in each raceway

      Section 250.122(H)(1) requires each parallel raceway to contain an equipment grounding conductor, sized from Table 250.122 using the rating of the overcurrent device protecting the feeder. It is not divided between raceways. Table 250.66 is for grounding electrode conductors, a different conductor.

      Reference: 2026 National Electrical Code (NFPA 70), 250.122(H)(1)(b)

    5. Overhead 120/240-volt service conductors cross a residential driveway to reach a house. What is the minimum clearance above final grade required by 230.24(B)?

      Answer: 12 ft

      Section 230.24(B)(2) requires 12 ft over residential property and driveways, and commercial areas not subject to truck traffic, where voltage does not exceed 300 V to ground. 10 ft applies only to the building entrance and pedestrian-only areas, and 18 ft applies over public streets, alleys and driveways on other than residential property.

      Reference: 2026 National Electrical Code (NFPA 70), 230.24(B)

    6. Rigid metal conduit carrying 480-volt feeder conductors is buried in a lawn with no concrete cover. What minimum cover does Table 300.7(A) require?

      Answer: 6 in.

      Table 300.7(A), Column 2 (rigid metal conduit or intermediate metal conduit), all locations not specified below, requires 6 in. of cover. Nonmetallic raceways listed for direct burial need 18 in., and direct burial cable needs 24 in.

      Reference: 2026 National Electrical Code (NFPA 70), Table 300.7(A)

    7. What is the maximum height above the floor of the center of the grip of a switch or circuit breaker operating handle in its highest position, under 404.10 (general rule)?

      Answer: 6 ft 7 in.

      Section 404.10 requires the center of the grip of the operating handle, in its highest position, to be not more than 2.0 m (6 ft 7 in.) above the floor or working platform. Exceptions apply to busway, switches adjacent to the equipment they supply, and hookstick-operated isolating switches.

      Reference: 2026 National Electrical Code (NFPA 70), 404.10

    8. Look up a 10-hp, three-phase induction motor rated 208 volts in Table 430.250. Which full-load current does the table list?

      Answer: 30.8 amperes

      Table 430.250 lists 30.8 A for a 10-hp induction motor on 208 V. The 28 A value is for 230 V, 14 A is for 460 V, and 32.2 A is the 200 V column. The motor voltage rating column must be matched, not the system voltage assumed.

      Reference: 2026 National Electrical Code (NFPA 70), Table 430.250

    9. A 120-volt, 20-ampere load is fed by 12 AWG copper (6,530 circular mils, K = 12.9). To limit voltage drop to 3 percent, what is the longest one-way run, rounded down to the nearest foot?

      Answer: 45 ft

      Allowed drop = 0.03 x 120 V = 3.6 V. Solving 2 x K x I x L / CM = 3.6 for L gives L = 3.6 x 6,530 / (2 x 12.9 x 20) = 23,508 / 516 = 45.6 ft, so 45 ft. Omitting the factor of 2 gives 91 ft, using 5 percent gives 76 ft, and doubling the factor again gives 22 ft.

      Reference: 2026 National Electrical Code (NFPA 70), Chapter 9, Table 8 (voltage drop formula)

    10. A three-phase, 208-volt load is rated 75 kVA. What full-load line current does it draw?

      Answer: 208 amperes

      For three-phase, I = kVA x 1000 / (1.732 x V) = 75,000 / (1.732 x 208) = 208.2 A. Dividing by voltage alone gives 361 A, using 480 V gives 90 A, and 75,000/480 gives 156 A.

      Reference: 2026 National Electrical Code (NFPA 70), Electrical theory; three-phase power formula

    Sources

    Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.