Oregon licensing exam

Oregon General Journeyman Electrician Exam: Practice Test & Licensing Guide

The Oregon Building Codes Division General Journeyman Electrician (J) exam: 52 open-book questions in 3 hours on the NEC with Oregon amendments and Oregon electrical law. 75% to pass.

Questions
52
Time limit
3 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Oregon Electrical Laws and Rules (ORS 479, OAR Division 918)

A limited supervising electrician at an existing manufacturing plant is asked to replace the plant's service-entrance switchboard. Under OAR 918-282-0160, which is correct?

Requirements at a glance

AgencyOregon Building Codes Division (BCD); state-run paper exam
ExperienceApproved Oregon apprenticeship, or 576 classroom hours plus 8,000 on-the-job hours (at least 1,000 each residential, commercial, industrial) from out of state, or 16,000 hours of experience
Exam52 questions, 3 hours, open book; 75% to pass
Books allowedOpen book: NEC with Oregon amendments, NEC Handbook, ORS 479, OAR Division 918 and the other references on BCD's list; silent non-programmable calculator
Fees$100 application fee (no separate exam fee); renewal every 3 years with 24 hours of continuing education

Electricians applying to BCD for a general journeyman (J) license after an approved Oregon apprenticeship, or with out-of-state training and experience (576 classroom hours and 8,000 on-the-job hours, or 16,000 hours of experience).

How to get licensed, step by step

  1. Apply to BCD

    Send the application, proof of qualifying training and experience, a high school diploma or GED, and the fee. Choose your proctor site on the application.

    Oregon Building Codes Division: licensing (opens in a new tab)

  2. Get your Letter of Authorization

    BCD mails the letter when your application is approved. Call the proctor site on it to book; you must test within 60 days of the letter.

    BCD: license exams and locations (opens in a new tab)

  3. Take the exam

    Bring the letter, photo ID, your approved books, pencils and a silent, non-programmable calculator. 75% is the passing score.

    BCD: license exams and locations (opens in a new tab)

  4. Results and retakes

    BCD grades the exam and mails the result in about 2 weeks. After a failure, wait 30 days and send a license reapplication form.

    BCD: license exams and locations (opens in a new tab)

How to prepare

  • The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition its exams test, so our questions follow the currently adopted code. Check your Letter of Authorization and the BCD materials list before you buy books.
  • BCD publishes no outline or topic weights, so our topic split is an estimate. The exam is open book: tab your NEC with Oregon amendments, ORS 479 and OAR Division 918 and practice finding answers fast.
  • Allowed: tabs, highlighting, printed errata and short margin notes. Not allowed: practice tests, class notes, calculation examples or added pages.
  • Services, feeders, branch circuits and wiring methods carry the most weight in our split. Drill ampacity, box fill, grounding and load calculations.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NFPA 70: National Electrical Code (NEC) with Oregon amendments and errataEssential

    BCD's approved materials list names the NEC with Oregon amendments and errata but no edition. The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026.

    NFPA store (opens in a new tab)Free online access (opens in a new tab)

  • Ugly's Electrical References

    Allowed on BCD's list, with Ferm's Fast Finder and the Tom Henry or Briganti key-word indexes. Useful for formulas, conductor data and quick lookups.

Official reference list (as published by the testing agency)
  • NFPA 70 / National Electrical Code (NEC) with Oregon amendments and errata
  • NEC Handbook and errata
  • Oregon Revised Statutes (ORS) Chapter 479
  • Oregon Administrative Rules (OAR) Division 918
  • American Electrician's Handbook (Hartwell); Electrical Black Book (Rapp); Ugly's Electrical References; Ferm's Fast Finder Index; Tom Henry's Key Word Index; Briganti NEC and Oregon Electrical Code key-word indexes
  • A silent, non-printing, non-programmable calculator
  • Tabs, highlighting, printed errata and short margin notes are allowed. Practice tests, class notes, calculation examples and added pages are not. (BCD materials list, rev. September 2026)

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Oregon Electrical Laws and Rules (ORS 479, OAR Division 918)5
General Requirements, Definitions, Grounding and Bonding7
Services, Feeders and Branch Circuits10
Wiring Methods and Materials10
Equipment and Devices5
Motors, Generators and Controls5
Special Occupancies and Equipment5
Electrical Theory and Calculations5

Exam day details

  • Administered by the Oregon Building Codes Division (state-run paper exam at a proctor site).
  • Fee: No separate exam fee: the license application fee covers it ($100 journeyman and limited residential, $50 limited energy Class A). Application fees are nonrefundable.
  • 52 questions, 3 hours, open book, 75% to pass (BCD license directory). BCD publishes no topic outline, so our topic split is an estimate.
  • BCD mails a Letter of Authorization when your application is approved. Call the proctor site named on it to book; you must test within 60 days of the letter. Bring the letter and photo ID.
  • Proctor sites are in Bend, Eugene, Hermiston, Klamath Falls, Ontario, Pendleton, Portland, Roseburg, Salem and White City. BCD grades the paper exam and mails the result in about 2 weeks; results are not given by phone.
  • The passing score for all BCD licensing exams is 75%. After a failed exam you wait 30 days and send a license reapplication form; the result includes a strength and weakness report.
  • Bring your own pencils and, if you use one, a silent, non-printing, non-programmable calculator. Scratch paper is provided.
  • The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026, replacing the 2023 code. BCD does not say which edition its exams test, so our questions follow the currently adopted 2026 code; where a section number changed, the explanation also gives the 2023 number.

Note: BCD publishes no content outline, topic weights or question-count breakdown for the electrical exams, so our topic split is an estimate. The question count and time come from the BCD license directory. Our 2026 section numbers and rules were checked against NFPA's published 2026 revision records and Oregon's amendment table rather than the printed code, and BCD does not state which code edition the exams test.

Frequently asked questions

What's on the Oregon journeyman electrician exam?

BCD does not publish an outline. Third-party sources describe administrative rules and laws, the NEC, practical applications and theory and calculations. Our topic split is an estimate built from the approved references.

Is the Oregon electrician exam open book?

Yes. You may bring the NEC with Oregon amendments, the NEC Handbook, ORS 479, OAR Division 918 and the other references on BCD's list, with tabs, highlighting and short margin notes.

Which NEC edition is on the exam?

The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition the exam tests, so our questions follow the currently adopted code.

What if I fail?

Wait 30 days, then send BCD a license reapplication form to test again. In-person exam review is not offered.

Free questions with answers

Show all 10 free questions and answers
  1. A limited supervising electrician at an existing manufacturing plant is asked to replace the plant's service-entrance switchboard. Under OAR 918-282-0160, which is correct?

    Answer: The electrician is not authorized to install or perform work on service equipment

    OAR 918-282-0160(1)(e) states a limited supervising electrician is not authorized to install or perform work on service equipment. Working inside the employer's plant or replacing like for like does not change that.

    Reference: Oregon Administrative Rules chapter 918, OAR 918-282-0160(1)(e)

  2. A 120/240-volt service uses 3/0 AWG copper ungrounded service-entrance conductors. Using Table 250.66, what is the minimum size copper grounding electrode conductor to a ground rod, ignoring the rod-only allowance in 250.66(A)?

    Answer: 4 AWG

    Table 250.66 groups 2/0 and 3/0 copper ungrounded conductors in one row, which calls for a 4 AWG copper grounding electrode conductor. 8 AWG is for 2 AWG or smaller, 6 AWG is for 1 or 1/0, and 2 AWG is for conductors over 3/0 through 350 kcmil. Where the conductor goes only to a rod, 250.66(A) would permit 6 AWG, but that exception was set aside in the stem.

    Reference: 2026 National Electrical Code (NFPA 70), Table 250.66

  3. A 20-ampere branch circuit is wired with 12 AWG copper conductors. What is the minimum size of copper equipment grounding conductor for that circuit under Table 250.122?

    Answer: 12 AWG

    Table 250.122 is entered with the rating of the overcurrent device ahead of the circuit. A 20 A device calls for a 12 AWG copper equipment grounding conductor; 14 AWG is the 15 A row and 10 AWG is the 30 A to 60 A rows.

    Reference: 2026 National Electrical Code (NFPA 70), Table 250.122

  4. A branch circuit supplies 28 A of continuous load and 10 A of noncontinuous load. Using 125 percent of the continuous load, what is the minimum standard overcurrent device rating for the circuit?

    Answer: 45 A

    Continuous load is multiplied by 125 percent: 28 x 1.25 = 35 A. Adding the 10 A noncontinuous load gives 45 A, which is a standard rating in 240.6(A). Adding the loads first (38 A) leads to 40 A, and applying 125 percent to everything (47.5 A) leads to 50 A.

    Reference: 2026 National Electrical Code (NFPA 70), 210.20(A) and 240.6(A)

  5. Type NM cable run along framing members must be secured within 12 in. of each box and at intervals not exceeding what distance?

    Answer: 4 1/2 ft

    Section 334.30 requires NM cable to be secured at intervals not exceeding 4 1/2 ft and within 12 in. of every box, cabinet or fitting where cable clamps are used. 10 ft is the support spacing for EMT and rigid metal conduit, not cable.

    Reference: 2026 National Electrical Code (NFPA 70), 334.30

  6. What is the maximum allowable ampacity of 10 AWG copper Type NM cable used as a branch-circuit wiring method?

    Answer: 30 A

    Section 334.80 limits NM cable ampacity to the 60°C column of Table 310.16, which is 30 A for 10 AWG copper, even if the conductors are rated 90°C. 35 A and 40 A are the 75°C and 90°C values, which may only be used for derating starting points.

    Reference: 2026 National Electrical Code (NFPA 70), 334.80 and Table 310.16

  7. A surface-mounted LED luminaire with a completely enclosed light source is installed on the ceiling of a clothes closet. What is the minimum clearance to the nearest point of the closet storage space?

    Answer: 12 in.

    Section 410.16(D) requires 12 in. for surface-mounted incandescent or LED luminaires with completely enclosed light sources on the ceiling or wall above the door. 6 in. applies to recessed LED luminaires with enclosed sources and to fluorescent luminaires.

    Reference: 2026 National Electrical Code (NFPA 70), 410.16(D)(1)

  8. The motor controller disconnecting means must generally be located in sight from the controller location. How far can a disconnect be and still be "in sight"?

    Answer: Visible and not more than 50 ft

    Section 110.29 defines in sight from as visible and not more than 15 m (50 ft) from the other equipment, and 430.102(A) requires the controller disconnect to be in sight from the controller. 25 ft and 100 ft are not Code distances, and being in the same building does not satisfy the visibility requirement.

    Reference: 2026 National Electrical Code (NFPA 70), 110.29 and 430.102(A)

  9. What is the maximum duration allowed for temporary electric power and lighting installations used for holiday decorative lighting and similar purposes?

    Answer: 90 days

    Section 590.5(B) (590.3(B) before the 2026 renumbering) permits temporary installations for holiday decorative lighting and similar purposes for a period not to exceed 90 days. Construction temporary power is allowed for the duration of the construction, remodeling, maintenance, repair or demolition work under 590.5(A).

    Reference: 2026 National Electrical Code (NFPA 70), 590.5(B)

  10. A 20-ampere, 120-volt load is fed by two 12 AWG copper conductors (6,530 circular mils) for a one-way distance of 100 ft. Using K = 12.9 for copper, what is the voltage drop?

    Answer: 7.9 V

    For single-phase, VD = 2 x K x I x D / CM = 2 x 12.9 x 20 x 100 / 6,530 = 7.9 V (6.6 percent of 120 V). 3.95 V leaves out the factor of 2 for the return conductor, 6.58 V is the percentage, and 15.8 V doubles the factor again.

    Reference: 2026 National Electrical Code (NFPA 70), Chapter 9, Table 8 (conductor circular mils) and the single-phase voltage-drop formula

Sources

Questions last verified November 9, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.