Requirements at a glance
| Agency | Oregon Building Codes Division (BCD); state-run paper exam |
|---|---|
| Experience | Approved Oregon apprenticeship, or 432 classroom hours plus 6,000 on-the-job hours, or 12,000 hours of experience by work category, both out of state |
| Exam | 52 questions, 3 hours, open book; 75% to pass |
| Books allowed | Open book: NEC with Oregon amendments, NEC Handbook, ORS 479, OAR Division 918 and the other references on BCD's list; silent non-programmable calculator |
| Fees | $50 application fee (no separate exam fee) |
Technicians applying to BCD for a limited energy Class A (LEA) license to install, alter and repair all limited energy systems, working for an electrical or limited energy contractor or one industrial-plant employer.
Official links
How to get licensed, step by step
Apply to BCD
Send the application, proof of qualifying training and experience, a high school diploma or GED, and the fee. Choose your proctor site on the application.
Oregon Building Codes Division: licensing (opens in a new tab)
Get your Letter of Authorization
BCD mails the letter when your application is approved. Call the proctor site on it to book; you must test within 60 days of the letter.
Take the exam
Bring the letter, photo ID, your approved books, pencils and a silent, non-programmable calculator. 75% is the passing score.
Results and retakes
BCD grades the exam and mails the result in about 2 weeks. After a failure, wait 30 days and send a license reapplication form.
How to prepare
- The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition its exams test, so our questions follow the currently adopted code. Check your Letter of Authorization and the BCD materials list before you buy books.
- BCD publishes no outline or topic weights, so our topic split is an estimate. The exam is open book: tab your NEC with Oregon amendments, ORS 479 and OAR Division 918 and practice finding answers fast.
- Allowed: tabs, highlighting, printed errata and short margin notes. Not allowed: practice tests, class notes, calculation examples or added pages.
- Focus on power-limited circuits, fire alarm, communications and fiber cabling, and how limited energy wiring is separated from power wiring.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC) with Oregon amendments and errataEssential
BCD's approved materials list names the NEC with Oregon amendments and errata but no edition. The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Ugly's Electrical References
Allowed on BCD's list, with Ferm's Fast Finder and the Tom Henry or Briganti key-word indexes. Useful for formulas, conductor data and quick lookups.
Official reference list (as published by the testing agency)
- NFPA 70 / National Electrical Code (NEC) with Oregon amendments and errata
- NEC Handbook and errata
- Oregon Revised Statutes (ORS) Chapter 479
- Oregon Administrative Rules (OAR) Division 918
- American Electrician's Handbook (Hartwell); Electrical Black Book (Rapp); Ugly's Electrical References; Ferm's Fast Finder Index; Tom Henry's Key Word Index; Briganti NEC and Oregon Electrical Code key-word indexes
- A silent, non-printing, non-programmable calculator
- Tabs, highlighting, printed errata and short margin notes are allowed. Practice tests, class notes, calculation examples and added pages are not. (BCD materials list, rev. September 2026)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Oregon Electrical Laws and Rules (ORS 479, OAR Division 918) | 6 | |
| Power-Limited and Remote-Control Circuits | 10 | |
| Fire Alarm and Life Safety Systems | 12 | |
| Communications, Optical Fiber and Network Cabling | 10 | |
| Limited Energy Wiring Methods, Grounding and Bonding | 8 | |
| General Requirements, Definitions and Electrical Theory | 6 |
Exam day details
- Administered by the Oregon Building Codes Division (state-run paper exam at a proctor site).
- Fee: No separate exam fee: the license application fee covers it ($100 journeyman and limited residential, $50 limited energy Class A). Application fees are nonrefundable.
- 52 questions, 3 hours, open book, 75% to pass (BCD license directory). BCD publishes no topic outline, so our topic split is an estimate.
- BCD mails a Letter of Authorization when your application is approved. Call the proctor site named on it to book; you must test within 60 days of the letter. Bring the letter and photo ID.
- Proctor sites are in Bend, Eugene, Hermiston, Klamath Falls, Ontario, Pendleton, Portland, Roseburg, Salem and White City. BCD grades the paper exam and mails the result in about 2 weeks; results are not given by phone.
- The passing score for all BCD licensing exams is 75%. After a failed exam you wait 30 days and send a license reapplication form; the result includes a strength and weakness report.
- Bring your own pencils and, if you use one, a silent, non-printing, non-programmable calculator. Scratch paper is provided.
- Qualification (BCD form 440-2570I): an approved Oregon apprenticeship, or 432 classroom hours plus 6,000 on-the-job hours, or 12,000 hours of experience, both obtained outside Oregon and broken down by work category (the 300 percent rule applies).
- The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026, replacing the 2023 code. BCD does not say which edition its exams test, so our questions follow the currently adopted 2026 code; where a section number changed, the explanation also gives the 2023 number.
Note: BCD publishes no content outline, topic weights or question-count breakdown for the electrical exams, so our topic split is an estimate. The question count and time come from the BCD license directory. Our 2026 section numbers and rules were checked against NFPA's published 2026 revision records and Oregon's amendment table rather than the printed code, and BCD does not state which code edition the exams test.
Frequently asked questions
What can a Class A limited energy technician do?
Install, alter and repair all limited energy systems. An LEA must be licensed as an electrical contractor or work for an electrical contractor, a limited energy contractor, or one employer in an industrial plant.
What's on the exam?
BCD publishes no outline. Our questions cover power-limited circuits, fire alarm, communications and fiber cabling, grounding and Oregon electrical law.
Which NEC edition is on the exam?
The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition the exam tests, so our questions follow the currently adopted code.
Free questions with answers
Show all 10 free questions and answers
A technician holds only a Class B limited energy technician license. Which job is outside that license?
Answer: Installing a nurse call system in a hospital wing
ORS 479.905(2) says a Class B technician works on limited energy systems that do not include protective signaling, and lists HVAC, intercom and paging, and data telecommunication installations among the examples. Under 479.905(5), protective signaling includes nurse call, fire alarm, burglar alarm, security and voice evacuation systems, so that work needs a Class A license.
Reference: Oregon Revised Statutes (ORS) Chapter 479, ORS 479.905(2) and (5)
A Class 2 control circuit operates at 24 volts and the load has a resistance of 48 ohms. How much current does the load draw?
Answer: 0.5 ampere
Ohm's law gives I = E / R = 24 V / 48 ohm = 0.5 A. Dividing resistance by voltage (48 / 24 = 2.0) inverts the formula, and multiplying the two (24 x 48 = 1,152) is not Ohm's law at all.
Reference: Basic electrical theory (Ohm's law and the power formula), I = E / R
What is the maximum rated output of a power source supplying a Class 1 power-limited circuit?
Answer: 30 volts and 1,000 volt-amperes
Section 724.40 says Class 1 circuits are supplied from a source with a rated output of not more than 30 volts and 1,000 volt-amperes. The 100 VA figure is the maximum for Class 2 and Class 3 power sources in Chapter 9, Tables 11(A) and 11(B); 60 V and 150 V are not Class 1 limits.
Reference: NFPA 70, National Electrical Code, 2026, 724.40
A Class 1 circuit is run with 16 AWG conductors that are protected by overcurrent devices sized under Section 724.43. What is the maximum overcurrent device rating for the 16 AWG copper conductors?
Answer: 10 amperes
Section 724.43 limits overcurrent protection to 7 amperes for 18 AWG copper (or 16 AWG copper-clad aluminum) and 10 amperes for 16 AWG copper (or 14 AWG copper-clad aluminum) Class 1 conductors. Seven amperes is the 18 AWG copper value. Fifteen and twenty amperes are the usual 14 AWG and 12 AWG branch-circuit ratings and would overload the smaller wire.
Reference: NFPA 70, National Electrical Code, 2026, 724.43
A fire alarm control panel is being connected to a 120-volt branch circuit. Which statement about that branch circuit is correct?
Answer: It must supply no other loads besides the fire alarm equipment
Section 760.121(B)(1) for power-limited fire alarm systems, and 760.41(B) for non-power-limited systems, require the branch circuit supplying the fire alarm equipment to supply no other loads. Sharing the circuit could allow an unrelated overload or switching to take the alarm system out of service.
Reference: NFPA 70, National Electrical Code, 2026, 760.121(B)(1)
How must the circuit disconnecting means for a fire alarm branch circuit be identified?
Answer: Red identification, access by qualified personnel only, marked FIRE ALARM CIRCUIT
Section 760.121(B)(4) requires red identification of the circuit disconnecting means, access only to qualified personnel, and the words FIRE ALARM CIRCUIT. The red identification must not damage the overcurrent device or hide the manufacturer's markings. The location of the overcurrent device must also be permanently identified at the fire alarm control unit.
Reference: NFPA 70, National Electrical Code, 2026, 760.121(B)(3) and (4)
A communications cable will run above a hung ceiling used as a return-air plenum with no raceway. Which cable type is permitted?
Answer: A plenum-rated cable such as Type CMP
Section 722.131(C)(1) permits plenum cables in other spaces used for environmental air. Riser, general-purpose and limited-use cables may be used there only when installed in a raceway as that section allows. Jacket claims such as low smoke do not substitute for the plenum listing.
Reference: NFPA 70, National Electrical Code, 2026, 722.131(C)(1)
Which of these may share a raceway, cable tray, box or enclosure with jacketed communications cables, under Section 722.13(A)?
Answer: Jacketed PLFA cables installed under Article 760
Section 722.13(A) and Table 722.13(A) permit the listed limited-energy cable types, including communications (CM), Class 2 and Class 3 (CL2, CL3), PLFA (FPL), optical fiber, CATV and low-power network-powered broadband cables, to share a raceway, cable tray, box or enclosure. Class 1, NPLFA and medium-power broadband conductors are not limited-energy cables and fall under the separation rules of 722.15.
Reference: NFPA 70, National Electrical Code, 2026, 722.13(A)
A communications cable has a large aggregate of metallic sheath and conductors. What is the largest size of copper bonding conductor Section 750.100(A)(3) can require for the protector?
Answer: 6 AWG
Section 750.100(A)(3) sets a floor of 14 AWG and then requires enough current-carrying capacity for the cable's grounded metal parts, but states that the conductor is not required to exceed 6 AWG. So the most the rule can ask for is 6 AWG.
Reference: NFPA 70, National Electrical Code, 2026, 750.100(A)(3)
A building has an intersystem bonding termination (IBT) at the service. Where does the communications bonding conductor connect?
Answer: To the intersystem bonding termination
Section 750.100(B)(1) says that if the building has an IBT as required by 250.94, the communications bonding conductor connects to the IBT. Using the IBT gives all systems a single accessible bonding point external to the enclosures.
Reference: NFPA 70, National Electrical Code, 2026, 750.100(B)(1)
Sources
- Oregon BCD: license exams and locations (opens in a new tab)
- Oregon Building Codes Division (licensing) (opens in a new tab)
- Oregon BCD: Electrical Specialty Code adoption (opens in a new tab)
Questions last verified November 9, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.