Requirements at a glance
| Agency | Oregon Building Codes Division (BCD); state-run paper exam |
|---|---|
| Experience | Oregon apprenticeship, or 288 classroom hours plus 4,000 hours, or 8,000 hours; plus a board-approved 32-hour course |
| Exam | 28 questions, 2 hours, open book; 75% to pass |
| Books allowed | Open book: NEC with Oregon amendments, NEC Handbook, ORS 479, OAR Division 918 and the other references on BCD's list; silent non-programmable calculator |
| Fees | $50 application fee (no separate exam fee); 8 hours of continuing education |
Technicians applying to BCD for a limited energy Class B (LEB) license to do limited energy work that does not include protective signaling (fire alarm, nurse call, burglar), working for an electrical contractor, a limited energy contractor or one industrial-plant employer.
Official links
How to get licensed, step by step
Apply to BCD
Send the application, proof of qualifying training and experience, a high school diploma or GED, and the fee. Choose your proctor site on the application.
Oregon Building Codes Division: licensing (opens in a new tab)
Get your Letter of Authorization
BCD mails the letter when your application is approved. Call the proctor site on it to book; you must test within 60 days of the letter.
Take the exam
Bring the letter, photo ID, your approved books, pencils and a silent, non-programmable calculator. 75% is the passing score.
Results and retakes
BCD grades the exam and mails the result in about 2 weeks. After a failure, wait 30 days and send a license reapplication form.
How to prepare
- The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition its exams test, so our questions follow the currently adopted code. Check your Letter of Authorization and the BCD materials list before you buy books.
- BCD publishes no outline or topic weights, so our topic split is an estimate. The exam is open book: tab your NEC with Oregon amendments, ORS 479 and OAR Division 918 and practice finding answers fast.
- Allowed: tabs, highlighting, printed errata and short margin notes. Not allowed: practice tests, class notes, calculation examples or added pages.
- Class B excludes protective signaling (fire alarm, nurse call, burglar), which belongs to Class A. Drill NEC 725, 770 and 800 and coaxial and antenna articles.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Official reference list (as published by the testing agency)
- NFPA 70 / National Electrical Code (NEC) with Oregon amendments and errata
- NEC Handbook and errata
- Oregon Revised Statutes (ORS) Chapter 479
- Oregon Administrative Rules (OAR) Division 918
- American Electrician's Handbook (Hartwell); Electrical Black Book (Rapp); Ugly's Electrical References; Ferm's Fast Finder Index; Tom Henry's Key Word Index; Briganti NEC and Oregon Electrical Code key-word indexes
- A silent, non-printing, non-programmable calculator
- Tabs, highlighting, printed errata and short margin notes are allowed. Practice tests, class notes, calculation examples and added pages are not. (BCD materials list, rev. September 2026)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Oregon Laws, scope and licensing (ORS 479, OAR 918-282-0360) | 4 | |
| Power-Limited and Remote-Control Circuits (NEC 725) | 7 | |
| Communications, Network and Optical Fiber Cabling (NEC 722, 800) | 7 | |
| Coaxial, Broadband and Antenna Systems (NEC 810, 820, 830) | 4 | |
| Wiring Methods, Grounding, Bonding and Separation | 4 | |
| Electrical Theory | 2 |
Exam day details
- Administered by the Oregon Building Codes Division (state-run paper exam at a proctor site).
- Fee: No separate exam fee: the license application fee covers it ($50 for this license). Application fees are nonrefundable.
- 28 questions, 2 hours, open book, 75% to pass (BCD license directory). BCD publishes no topic outline, so our topic split is an estimate derived from the license scope in OAR Division 918-282.
- BCD mails a Letter of Authorization when your application is approved. Call the proctor site named on it to book; you must test within 60 days of the letter. Bring the letter and photo ID.
- Proctor sites are in Bend, Eugene, Hermiston, Klamath Falls, Ontario, Pendleton, Portland, Roseburg, Salem and White City. BCD grades the paper exam and mails the result in about 2 weeks; results are not given by phone.
- The passing score for all BCD licensing exams is 75%. After a failed exam you wait 30 days and send a license reapplication form; the result includes a strength and weakness report.
- Bring your own pencils and, if you use one, a silent, non-printing, non-programmable calculator. Scratch paper is provided.
- Qualification (BCD license directory): Oregon apprenticeship, or 288 classroom hours plus 4,000 hours, or 8,000 hours; plus a board-approved 32-hour course; high school diploma or GED.
- The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026, replacing the 2023 code. BCD does not say which edition its exams test, so our questions follow the currently adopted 2026 code; where a section number changed, the explanation also gives the 2023 number.
Note: BCD publishes no content outline, topic weights or question-count breakdown for the electrical exams, so our topic split is an estimate. The question count and time come from the BCD license directory. Our 2026 section numbers and rules were checked against NFPA's published 2026 revision records and Oregon's amendment table rather than the printed code, and BCD does not state which code edition the exams test.
Frequently asked questions
Who can take the Oregon limited energy technician (class b) exam?
Candidates who meet BCD's qualification for this license: Oregon apprenticeship, or 288 classroom hours plus 4,000 hours, or 8,000 hours; plus a board-approved 32-hour course; high school diploma or GED. BCD mails a Letter of Authorization once your application is approved.
What's on the exam?
BCD publishes no outline or weights. Our topics follow the legal scope of the license in OAR Division 918-282 and the NEC with Oregon amendments, and our split is an estimate.
Is the exam open book?
Yes. You may bring the references on BCD's materials list, with tabs, highlighting and short margin notes. Practice tests, class notes and added pages are not allowed.
What if I fail?
Wait 30 days, then send BCD a license reapplication form to test again. Results come by mail in about 2 weeks.
Free questions with answers
Show all 10 free questions and answers
ORS 479.905 defines limited energy electrical activity for Class 2 and Class 3 installations by a power ceiling. What is that ceiling?
Answer: 100 volt-amperes
ORS 479.905(4) sets the ceiling at 100 volt-amperes for Class 2 and Class 3 installations. The 300 VA figure in the same subsection is for cord-connected landscape lighting on a GFCI receptacle, and 250 VA is a figure from the NEC power-source tables, not the statute.
Reference: Oregon Revised Statutes (ORS) Chapter 479, ORS 479.905(4)
A landscape contracting business licensed under ORS 671 installs outdoor lighting and irrigation control wiring. Under ORS 479.940(3), up to what limits is this work exempt from electrical licensure?
Answer: 30 volts and 750 volt-amperes, using Class II or Class III wiring
ORS 479.940(3)(a) exempts a licensed landscape contracting business for Class II or III irrigation control wiring and outdoor landscape lighting that does not exceed 30 volts and 750 volt-amperes. The 100 VA and 300 VA numbers belong to the limited energy definition in 479.905(4), a different rule.
Reference: Oregon Revised Statutes (ORS) Chapter 479, ORS 479.940(3)
A 24-volt thermostat transformer feeds a relay coil with a resistance of 60 ohms. How much current does the coil draw?
Answer: 0.4 ampere
Ohm's law gives I = E / R = 24 / 60 = 0.4 A. Dividing the other way (60 / 24 = 2.5) inverts the formula, 0.04 A is a decimal slip, and 1,440 is the product E x R, which is not a current.
Reference: Basic electrical theory (Ohm's law and the power formula), Ohm's law, I = E / R
What is the maximum rated output of a power source that supplies a Class 1 power-limited circuit, according to Section 724.40?
Answer: 30 volts and 1,000 volt-amperes
Section 724.40 limits the source for a Class 1 power-limited circuit to a rated output of not more than 30 V and 1,000 VA. 100 VA is a common ceiling for Class 2 and Class 3 sources in Chapter 9, Tables 11(A) and 11(B), and 60 V and 150 V are not Class 1 limits.
Reference: NFPA 70, National Electrical Code, 2026, 724.40
A Class 1 power-limited circuit uses 18 AWG copper conductors. Under Section 724.43, what is the maximum overcurrent protection rating for those conductors?
Answer: 7 amperes
Section 724.43 limits overcurrent protection of Class 1 conductors to 7 A for 18 AWG copper (and 16 AWG copper-clad aluminum) and 10 A for 16 AWG copper (and 14 AWG copper-clad aluminum). Ten amperes is the 16 AWG copper value, while 15 and 20 A are ordinary branch-circuit ratings for 14 and 12 AWG.
Reference: NFPA 70, National Electrical Code, 2026, 724.43
Which cable type listed in Table 722.131(A) is a plenum cable used for communications circuits?
Answer: CMP
Table 722.131(A) (formerly Table 800.113) lists CMP among the plenum cables for communications circuits. CMR is the riser type, CMX is limited-use and CMUC is under-carpet cable.
Reference: NFPA 70, National Electrical Code, 2026, Table 722.131(A)
A data cable must be added in a ceiling space that is used as a return-air plenum, with no raceway. Which cable type is permitted?
Answer: A plenum-rated cable such as Type CMP
Section 722.131(C)(1) (formerly 800.113(C)) permits plenum cables in other spaces used for environmental air (plenums); riser, general-purpose and limited-use cables are listed as not permitted there under 722.131(C)(2) unless they are in a raceway that complies with 720.22(C).
Reference: NFPA 70, National Electrical Code, 2026, 722.131(C)(1)
An installer wants to use an aluminum conductor to bond an antenna mast. Under Section 750.66(H), what is the minimum size, and where is aluminum restricted under 750.66(A)?
Answer: 8 AWG, and not within 450 mm (18 in.) of the earth outdoors
Section 750.66(H) (formerly 810.21(H)) requires at least 8 AWG aluminum, and 750.66(A) does not allow aluminum or copper-clad aluminum in direct contact with masonry or the earth or where subject to corrosive conditions, and outdoors not within 450 mm (18 in.) of the earth.
Reference: NFPA 70, National Electrical Code, 2026, 750.66(A) and (H)
What is the smallest operating bonding conductor or grounding electrode conductor for an amateur transmitting station under Section 750.70(C)?
Answer: 14 AWG copper or its equivalent
Section 750.70(C) (formerly 810.58(C)) sets the operating bonding conductor or grounding electrode conductor for amateur transmitting stations at not less than 14 AWG copper or its equivalent. The protective conductor under 750.70(B) must be as large as the lead-in but not smaller than 10 AWG.
Reference: NFPA 70, National Electrical Code, 2026, 750.70(B) and (C)
In a one-family dwelling, what is the maximum length of the bonding conductor or grounding electrode conductor for a communications protector, before any exception?
Answer: 6.0 m (20 ft)
Section 750.100(A)(4) (formerly 800.100(A)(4)) requires the bonding conductor or grounding electrode conductor in one- and two-family dwellings to be as short as practicable, not over 6.0 m (20 ft). An exception allows a separate rod when that cannot be met.
Reference: NFPA 70, National Electrical Code, 2026, 750.100(A)(4)
Sources
- Oregon BCD: license exams and locations (opens in a new tab)
- Oregon Building Codes Division (licensing) (opens in a new tab)
- Oregon BCD: Electrical Specialty Code adoption (opens in a new tab)
Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.