Requirements at a glance
| Agency | Oregon Building Codes Division (BCD); state-run paper exam |
|---|---|
| Experience | Licensed limited manufacturing plant journeyman plus 8,000 hours of plant journeyman work, or equivalent out of state |
| Exam | 64 questions, 4 hours, open book; 75% to pass |
| Books allowed | Open book: NEC with Oregon amendments, NEC Handbook, ORS 479, OAR Division 918 and the other references on BCD's list; silent non-programmable calculator |
| Fees | $100 application fee (no separate exam fee); 24 hours of continuing education |
Plant electricians applying to BCD for a limited supervising electrician (PS) license to direct electrical work in an existing operable plant, hospital, sewer or water plant, commercial office building or government building owned or operated by their employer, and to sign permits. No service equipment work.
Official links
How to get licensed, step by step
Apply to BCD
Send the application, proof of qualifying training and experience, a high school diploma or GED, and the fee. Choose your proctor site on the application.
Oregon Building Codes Division: licensing (opens in a new tab)
Get your Letter of Authorization
BCD mails the letter when your application is approved. Call the proctor site on it to book; you must test within 60 days of the letter.
Take the exam
Bring the letter, photo ID, your approved books, pencils and a silent, non-programmable calculator. 75% is the passing score.
Results and retakes
BCD grades the exam and mails the result in about 2 weeks. After a failure, wait 30 days and send a license reapplication form.
How to prepare
- The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition its exams test, so our questions follow the currently adopted code. Check your Letter of Authorization and the BCD materials list before you buy books.
- BCD publishes no outline or topic weights, so our topic split is an estimate. The exam is open book: tab your NEC with Oregon amendments, ORS 479 and OAR Division 918 and practice finding answers fast.
- Allowed: tabs, highlighting, printed errata and short margin notes. Not allowed: practice tests, class notes, calculation examples or added pages.
- A PS directs work in plants, hospitals, sewer and water plants, commercial office and government buildings owned or operated by the employer, and signs permits, but may not do service equipment work (OAR 918-282-0160).
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Official reference list (as published by the testing agency)
- NFPA 70 / National Electrical Code (NEC) with Oregon amendments and errata
- NEC Handbook and errata
- Oregon Revised Statutes (ORS) Chapter 479
- Oregon Administrative Rules (OAR) Division 918
- American Electrician's Handbook (Hartwell); Electrical Black Book (Rapp); Ugly's Electrical References; Ferm's Fast Finder Index; Tom Henry's Key Word Index; Briganti NEC and Oregon Electrical Code key-word indexes
- A silent, non-printing, non-programmable calculator
- Tabs, highlighting, printed errata and short margin notes are allowed. Practice tests, class notes, calculation examples and added pages are not. (BCD materials list, rev. September 2026)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Oregon Laws incl. supervising duties and permits (OAR 918-282-0160) | 9 | |
| General Requirements, Grounding and Bonding | 8 | |
| Wiring Methods and Distribution | 10 | |
| Motors, Generators, Controllers | 10 | |
| Equipment, Hazardous Locations, Healthcare, Special Occupancies | 10 | |
| Calculations and Theory | 10 | |
| Safety and Plant Maintenance | 7 |
Exam day details
- Administered by the Oregon Building Codes Division (state-run paper exam at a proctor site).
- Fee: No separate exam fee: the license application fee covers it ($100 for this license). Application fees are nonrefundable.
- 64 questions, 4 hours, open book, 75% to pass (BCD license directory). BCD publishes no topic outline, so our topic split is an estimate derived from the license scope in OAR Division 918-282.
- BCD mails a Letter of Authorization when your application is approved. Call the proctor site named on it to book; you must test within 60 days of the letter. Bring the letter and photo ID.
- Proctor sites are in Bend, Eugene, Hermiston, Klamath Falls, Ontario, Pendleton, Portland, Roseburg, Salem and White City. BCD grades the paper exam and mails the result in about 2 weeks; results are not given by phone.
- The passing score for all BCD licensing exams is 75%. After a failed exam you wait 30 days and send a license reapplication form; the result includes a strength and weakness report.
- Bring your own pencils and, if you use one, a silent, non-printing, non-programmable calculator. Scratch paper is provided.
- Qualification (BCD license directory): Licensed limited manufacturing plant journeyman plus 8,000 hours of plant journeyman work (or equivalent out of state); high school diploma or GED.
- The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026, replacing the 2023 code. BCD does not say which edition its exams test, so our questions follow the currently adopted 2026 code; where a section number changed, the explanation also gives the 2023 number.
Note: BCD publishes no content outline, topic weights or question-count breakdown for the electrical exams, so our topic split is an estimate. The question count and time come from the BCD license directory. Our 2026 section numbers and rules were checked against NFPA's published 2026 revision records and Oregon's amendment table rather than the printed code, and BCD does not state which code edition the exams test.
Frequently asked questions
Who can take the Oregon limited supervising electrician exam?
Candidates who meet BCD's qualification for this license: Licensed limited manufacturing plant journeyman plus 8,000 hours of plant journeyman work (or equivalent out of state); high school diploma or GED. BCD mails a Letter of Authorization once your application is approved.
What's on the exam?
BCD publishes no outline or weights. Our topics follow the legal scope of the license in OAR Division 918-282 and the NEC with Oregon amendments, and our split is an estimate.
Is the exam open book?
Yes. You may bring the references on BCD's materials list, with tabs, highlighting and short margin notes. Practice tests, class notes and added pages are not allowed.
What if I fail?
Wait 30 days, then send BCD a license reapplication form to test again. Results come by mail in about 2 weeks.
Free questions with answers
Show all 10 free questions and answers
Under OAR 918-282-0160(1), which duty must a limited supervising electrician perform?
Answer: Sign all permits and ensure installations meet minimum safety standards
Paragraphs (1)(c) and (1)(d) say the limited supervising electrician shall sign all permits and shall ensure electrical installations meet minimum safety standards. There is no exception for work the PS does not personally perform.
Reference: Oregon Administrative Rules (OAR) Chapter 918, OAR 918-282-0160(1)(c)-(d)
What is the minimum width of the working space in front of electrical equipment rated 1000 volts or less under 110.26(A)(2)?
Answer: 30 in. wide, or the width of the equipment if that is greater
Section 110.26(A)(2) requires working space at least 30 in. wide, or the width of the equipment, whichever is greater. The space need not be centered on the equipment.
Reference: 2026 National Electrical Code (NFPA 70), 110.26(A)(2)
Horizontal runs of EMT in a plant are supported on a structural steel framework. Under 358.30, what is the maximum interval between fasteners and the maximum distance from a junction box to the first support?
Answer: 10 ft between supports and 3 ft from each box
Section 358.30(A) requires EMT to be fastened at intervals not exceeding 10 ft and within 3 ft of each box, cabinet, conduit body or termination. The 5 ft figure applies only under Exception No. 1 where framing does not permit fastening within 3 ft of a box.
Reference: 2026 National Electrical Code (NFPA 70), 358.30(A)
A 25-hp, 460-volt, three-phase squirrel-cage motor has a Table 430.250 full-load current of 34 A. What is the maximum rating of an inverse time circuit breaker for its branch-circuit short-circuit and ground-fault protection, using Table 430.52 and 430.52(C)(1)?
Answer: 90 A
Table 430.52 allows 250 percent of the full-load current for an inverse time breaker: 34 x 2.5 = 85 A. That is not a standard rating, and 430.52(C)(1) permits the next higher standard size from 240.6(A), which is 90 A. 85 A is not a standard rating.
Reference: 2026 National Electrical Code (NFPA 70), 430.52(C)(1); Table 430.52; 240.6(A)
Under 110.29, a motor disconnect is considered 'in sight from' the motor controller when it is visible from the controller and not more than what distance away?
Answer: 50 ft (15 m)
Section 110.29 says equipment that must be 'in sight from' other equipment must be visible and not more than 15 m (50 ft) away, and 430.102(A) requires the controller disconnecting means to be in sight from the controller. The 2026 NEC deleted the Article 100 definition of 'In Sight From', so 110.29 is now the only place this 50 ft rule appears.
Reference: 2026 National Electrical Code (NFPA 70), 110.29; 430.102(A)
In a Class I, Division 1 location, a conduit enters an explosionproof enclosure containing switches that may produce arcs. Under 501.15(A)(1), how close to the enclosure must the conduit seal be installed?
Answer: Within 18 in. of the enclosure, or as marked on the enclosure
Section 501.15(A) requires conduit seals within 450 mm (18 in.) of the enclosure, or as required by the enclosure marking. Only threaded couplings or explosionproof unions, reducers and elbows not larger than the conduit may sit between the seal and the enclosure.
Reference: 2026 National Electrical Code (NFPA 70), 501.15(A)(1)
A Class I, Division 1 location has a metric designator 53 (trade size 2) conduit entering an explosionproof enclosure that contains only terminals, splices and taps. What does 501.15(A)(1) require?
Answer: A conduit seal at the entry, because the entry is trade size 2 or larger
A seal is required for entries into explosionproof enclosures if the enclosure contains arcing or high-temperature apparatus, or if the entry is trade size 2 or larger and the enclosure contains terminals, splices or taps. This conduit is trade size 2.
Reference: 2026 National Electrical Code (NFPA 70), 501.15(A)(1)(2)
A three-phase, 208-volt load draws 60 A through 200 ft (one way) of 4 AWG copper (41,740 circular mils, K = 12.9). What is the percent voltage drop?
Answer: 3.1 percent
VD = 1.732 x K x I x L / CM = 1.732 x 12.9 x 60 x 200 / 41,740 = 6.42 V. Percent = 6.42 / 208 = 3.09 percent. Using 2 instead of 1.732 gives 7.42 V or 3.57 percent, halving the length gives 1.54 percent, and 6.4 is the drop in volts, not percent. The 41,740 circular mils for 4 AWG come from Chapter 9, Table 8.
Reference: 2026 National Electrical Code (NFPA 70), Chapter 9, Table 8; 215.2(A) Informational Note
A heating element has a resistance of 24 ohms and is connected to a 480-volt supply. What current flows?
Answer: 20 A
Ohm's law gives I = E / R = 480 / 24 = 20 A. Using 277 V (the line-to-neutral voltage) gives 11.5 A, inverting the formula gives 0.05 A, and multiplying gives a meaningless 11,520.
Reference: General electrical theory, Ohm's law, I = E / R
After applying lockout devices and releasing stored energy, what must an authorized employee do before work begins under 29 CFR 1910.147(d)(6)?
Answer: Verify isolation by confirming that the equipment cannot be started
29 CFR 1910.147(d)(6) requires the authorized employee to verify that isolation and deenergization have been accomplished before starting work on locked-out equipment. For electrical work, 1910.333(b)(2)(iv) adds operating the controls to confirm the equipment cannot start and testing with test equipment that the circuit parts are deenergized. Removing locks, relying on a coworker's look or simply waiting is not verification.
Reference: 29 CFR 1910 (OSHA), 29 CFR 1910.147(d)(6); 1910.333(b)(2)(iv)
Sources
- Oregon BCD: license exams and locations (opens in a new tab)
- Oregon Building Codes Division (licensing) (opens in a new tab)
- Oregon BCD: Electrical Specialty Code adoption (opens in a new tab)
Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.