Oregon licensing exam

Oregon Limited Journeyman Stage Electrician Exam: Practice Test & Licensing Guide

The Oregon Building Codes Division Limited Journeyman Stage Electrician (ST) exam: 52 open-book questions in 3 hours on theaters, temporary power and NEC Articles 520, 525 and 590 with Oregon amendments. 75% to pass.

Questions
52
Time limit
3 hours
Passing score
75%
Books
Open book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Oregon Laws and Stage Scope (OAR 918-282-0230; 150 V to ground)

Under OAR 918-282-0230, a limited journeyman stage electrician must be employed by which of the following?

Requirements at a glance

AgencyOregon Building Codes Division (BCD); state-run paper exam
Experience150 classroom hours plus 4,000 hours of stage work, or 8,000 hours of stage work outside Oregon (the rules also list apprenticeship)
Exam52 questions, 3 hours, open book; 75% to pass
Books allowedOpen book: NEC with Oregon amendments, NEC Handbook, ORS 479, OAR Division 918 and the other references on BCD's list; silent non-programmable calculator
Fees$50 application fee (no separate exam fee); exempt from continuing education

Stage and event electricians applying to BCD for a limited journeyman stage (ST) license to install temporary feeders, branch circuits and equipment for shows, exhibits, festivals, conventions, theater, film and video productions, working for an electrical contractor.

How to get licensed, step by step

  1. Apply to BCD

    Send the application, proof of qualifying training and experience, a high school diploma or GED, and the fee. Choose your proctor site on the application.

    Oregon Building Codes Division: licensing (opens in a new tab)

  2. Get your Letter of Authorization

    BCD mails the letter when your application is approved. Call the proctor site on it to book; you must test within 60 days of the letter.

    BCD: license exams and locations (opens in a new tab)

  3. Take the exam

    Bring the letter, photo ID, your approved books, pencils and a silent, non-programmable calculator. 75% is the passing score.

    BCD: license exams and locations (opens in a new tab)

  4. Results and retakes

    BCD grades the exam and mails the result in about 2 weeks. After a failure, wait 30 days and send a license reapplication form.

    BCD: license exams and locations (opens in a new tab)

How to prepare

  • The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition its exams test, so our questions follow the currently adopted code. Check your Letter of Authorization and the BCD materials list before you buy books.
  • BCD publishes no outline or topic weights, so our topic split is an estimate. The exam is open book: tab your NEC with Oregon amendments, ORS 479 and OAR Division 918 and practice finding answers fast.
  • Allowed: tabs, highlighting, printed errata and short margin notes. Not allowed: practice tests, class notes, calculation examples or added pages.
  • An ST installs temporary feeders, branch circuits and equipment for shows and productions and may maintain temporary equipment at not more than 150 V to ground, but not permanent wiring or services (OAR 918-282-0230). Drill NEC 520, 525 and 590.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

    Official reference list (as published by the testing agency)
    • NFPA 70 / National Electrical Code (NEC) with Oregon amendments and errata
    • NEC Handbook and errata
    • Oregon Revised Statutes (ORS) Chapter 479
    • Oregon Administrative Rules (OAR) Division 918
    • American Electrician's Handbook (Hartwell); Electrical Black Book (Rapp); Ugly's Electrical References; Ferm's Fast Finder Index; Tom Henry's Key Word Index; Briganti NEC and Oregon Electrical Code key-word indexes
    • A silent, non-printing, non-programmable calculator
    • Tabs, highlighting, printed errata and short margin notes are allowed. Practice tests, class notes, calculation examples and added pages are not. (BCD materials list, rev. September 2026)

    What's on the exam

    Estimated topic weighting. No official breakdown is published:

    TopicQuestions
    Oregon Laws and Stage Scope (OAR 918-282-0230; 150 V to ground)6
    Theaters, Studios and Similar Locations (NEC 520)13
    Portable Feeders and Temporary Installations (NEC 520, 525, 590)11
    Dimmers, Fixtures, Cords and Connectors (NEC 400, 410, 520)8
    Grounding, Bonding and GFCI for temporary power5
    Theory, Three-phase Distribution and Calculations6
    Rigging and Safety3

    Exam day details

    • Administered by the Oregon Building Codes Division (state-run paper exam at a proctor site).
    • Fee: No separate exam fee: the license application fee covers it ($50 for this license). Application fees are nonrefundable.
    • 52 questions, 3 hours, open book, 75% to pass (BCD license directory). BCD publishes no topic outline, so our topic split is an estimate derived from the license scope in OAR Division 918-282.
    • BCD mails a Letter of Authorization when your application is approved. Call the proctor site named on it to book; you must test within 60 days of the letter. Bring the letter and photo ID.
    • Proctor sites are in Bend, Eugene, Hermiston, Klamath Falls, Ontario, Pendleton, Portland, Roseburg, Salem and White City. BCD grades the paper exam and mails the result in about 2 weeks; results are not given by phone.
    • The passing score for all BCD licensing exams is 75%. After a failed exam you wait 30 days and send a license reapplication form; the result includes a strength and weakness report.
    • Bring your own pencils and, if you use one, a silent, non-printing, non-programmable calculator. Scratch paper is provided.
    • Qualification (BCD license directory): 150 classroom hours plus 4,000 hours of stage work, or 8,000 hours of stage work outside Oregon (OAR 918-282-0230 also lists apprenticeship); high school diploma or GED.
    • The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026, replacing the 2023 code. BCD does not say which edition its exams test, so our questions follow the currently adopted 2026 code; where a section number changed, the explanation also gives the 2023 number.

    Note: BCD publishes no content outline, topic weights or question-count breakdown for the electrical exams, so our topic split is an estimate. The question count and time come from the BCD license directory. Our 2026 section numbers and rules were checked against NFPA's published 2026 revision records and Oregon's amendment table rather than the printed code, and BCD does not state which code edition the exams test.

    Frequently asked questions

    Who can take the Oregon limited stage electrician exam?

    Candidates who meet BCD's qualification for this license: 150 classroom hours plus 4,000 hours of stage work, or 8,000 hours of stage work outside Oregon (OAR 918-282-0230 also lists apprenticeship); high school diploma or GED. BCD mails a Letter of Authorization once your application is approved.

    What's on the exam?

    BCD publishes no outline or weights. Our topics follow the legal scope of the license in OAR Division 918-282 and the NEC with Oregon amendments, and our split is an estimate.

    Is the exam open book?

    Yes. You may bring the references on BCD's materials list, with tabs, highlighting and short margin notes. Practice tests, class notes and added pages are not allowed.

    What if I fail?

    Wait 30 days, then send BCD a license reapplication form to test again. Results come by mail in about 2 weeks.

    Free questions with answers

    Show all 10 free questions and answers
    1. Under OAR 918-282-0230, a limited journeyman stage electrician must be employed by which of the following?

      Answer: An electrical contractor

      Rule 918-282-0230(1)(a) says the stage electrician shall be employed by an electrical contractor. Employment by the venue owner or production company alone does not meet the rule.

      Reference: OAR 918-282-0230, OAR 918-282-0230(1)(a)

    2. Under OAR 918-282-0230(2), which work category carries the highest minimum on-the-job hours?

      Answer: Set construction, and also stage/film and video/event property, each 1,000 hours

      Set construction (2)(e) and event property (2)(f) each require 1,000 hours, more than lighting (750), dimmer distribution (250), three-phase temporary power (500) or lamp operator (500).

      Reference: OAR 918-282-0230, OAR 918-282-0230(2)(a)-(f)

    3. Under Section 520.5(C), which fastening method is NOT permitted for the flexible cords and cables of portable stage wiring?

      Answer: Uninsulated staples or nails

      Fastening portable stage cords and cables with uninsulated staples or nailing is not permitted. Cable ties, wraps and supports are not prohibited by that rule.

      Reference: NEC Article 520 (2026 NEC), 520.5(C)

    4. Under 520.54(E), reduced-size supply conductors up to 20 ft long must be supported in an approved manner at least how high above the floor, except at terminations?

      Answer: 7 ft

      Section 520.54(E)(5) requires support at least 2.1 m (7 ft) above the floor except at terminations. The 10 ft reduced-size run in 520.54(D)(7) only says supported above the floor.

      Reference: NEC Article 520 (2026 NEC), 520.54(E)(5)

    5. Who must route portable supply conductors, make or break supply connectors and energize or de-energize supply services for a portable stage switchboard under 520.54(K)?

      Answer: Qualified persons

      Section 520.54(K) requires qualified persons, and the board must be marked accordingly. The exception lets other persons plug a board into a permanently installed receptacle protected at not over 150 A when listed multipole connectors are used and public access is prevented.

      Reference: NEC Article 520 (2026 NEC), 520.54(K)

    6. Using Table 520.44(C)(2)(1), a listed extra-hard usage cord of 12 AWG, 90 degrees C, not touching heat-producing equipment, has what ampacity, and what maximum device rating?

      Answer: 35 A and 20 A

      For 12 AWG the table shows 32 A at 75 degrees C and 35 A at 90 degrees C, with a maximum device rating of 20 A. 32 A is the 75 degrees C value; 28 A and 15 A are the 14 AWG values.

      Reference: NEC Article 520 (2026 NEC), Table 520.44(C)(2)(1)

    7. Under Section 520.67, which half of a multipole branch-circuit cable connector is attached to the load end of the power supply cord?

      Answer: The female half

      Section 520.67 says the female half is attached to the load end of the power supply cord or cable, so the energized end of the cord presents recessed contacts rather than exposed pins. The connector must also be rated in amperes and built so differently rated devices cannot be connected together.

      Reference: NEC Article 520 (2026 NEC), 520.67

    8. Under Section 525.23(C), which lighting circuit is NOT permitted to be GFCI protected?

      Answer: Egress lighting

      Section 525.23(C) says egress lighting shall not be protected by a GFCI, so a ground fault tripping the device cannot leave an exit path dark.

      Reference: NEC Article 525 (2026 NEC), 525.23(C)

    9. A balanced 3-phase, 208-volt load totals 36 kW at unity power factor. What is the line current? (I = P / (1.732 x V x PF))

      Answer: 99.9 A

      I = 36,000 / (1.732 x 208 x 1.0) = 36,000 / 360.3 = 99.9 A. Dividing by 208 only (173.1 A) forgets the 1.732 factor; 75.0 A and 43.3 A use 480 V instead of 208 V.

      Reference: General electrical theory, Three-phase power: I = P / (1.732 x E x PF)

    10. Under Section 520.54(G), all supply conductors and connectors of a portable stage switchboard must be protected against physical damage. Must that protection be a raceway?

      Answer: No; protection by an approved means is required, and it need not be a raceway

      Section 520.54(G) requires protection by an approved means and states that the protection shall not be required to be raceways, such as cable ramps or covers.

      Reference: NEC Article 520 (2026 NEC), 520.54(G)

    Sources

    Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.