Requirements at a glance
| Agency | Oregon Building Codes Division (BCD); state-run paper exam |
|---|---|
| Experience | Apprenticeship, or class hours plus 4,000 hours of sign work, or 8,000 hours |
| Exam | 28 questions, 2 hours, open book; 75% to pass |
| Books allowed | Open book: NEC with Oregon amendments, NEC Handbook, ORS 479, OAR Division 918 and the other references on BCD's list; silent non-programmable calculator |
| Fees | $50 application fee (no separate exam fee); 4 hours of continuing education |
Sign electricians applying to BCD for a limited journeyman sign (SIG) license to install and service electrical signs and outline lighting for a limited sign contractor, including extending a sign branch circuit up to 15 ft where a dedicated branch circuit exists.
Official links
How to get licensed, step by step
Apply to BCD
Send the application, proof of qualifying training and experience, a high school diploma or GED, and the fee. Choose your proctor site on the application.
Oregon Building Codes Division: licensing (opens in a new tab)
Get your Letter of Authorization
BCD mails the letter when your application is approved. Call the proctor site on it to book; you must test within 60 days of the letter.
Take the exam
Bring the letter, photo ID, your approved books, pencils and a silent, non-programmable calculator. 75% is the passing score.
Results and retakes
BCD grades the exam and mails the result in about 2 weeks. After a failure, wait 30 days and send a license reapplication form.
How to prepare
- The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026. BCD does not say which edition its exams test, so our questions follow the currently adopted code. Check your Letter of Authorization and the BCD materials list before you buy books.
- BCD publishes no outline or topic weights, so our topic split is an estimate. The exam is open book: tab your NEC with Oregon amendments, ORS 479 and OAR Division 918 and practice finding answers fast.
- Allowed: tabs, highlighting, printed errata and short margin notes. Not allowed: practice tests, class notes, calculation examples or added pages.
- A SIG installs and services signs and outline lighting and may extend a sign branch circuit up to 15 ft where a dedicated branch circuit exists (OAR 918-282-0220). Drill NEC 600.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Official reference list (as published by the testing agency)
- NFPA 70 / National Electrical Code (NEC) with Oregon amendments and errata
- NEC Handbook and errata
- Oregon Revised Statutes (ORS) Chapter 479
- Oregon Administrative Rules (OAR) Division 918
- American Electrician's Handbook (Hartwell); Electrical Black Book (Rapp); Ugly's Electrical References; Ferm's Fast Finder Index; Tom Henry's Key Word Index; Briganti NEC and Oregon Electrical Code key-word indexes
- A silent, non-printing, non-programmable calculator
- Tabs, highlighting, printed errata and short margin notes are allowed. Practice tests, class notes, calculation examples and added pages are not. (BCD materials list, rev. September 2026)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Oregon Laws and Sign Scope (OAR 918-282-0220; 15 ft rule) | 6 | |
| Signs and Outline Lighting (NEC 600) | 10 | |
| Wiring Methods under/over 600 V and Conduit/Boxes | 4 | |
| Grounding, Disconnects and Transformers | 4 | |
| Theory and Calculations | 3 | |
| Safety | 1 |
Exam day details
- Administered by the Oregon Building Codes Division (state-run paper exam at a proctor site).
- Fee: No separate exam fee: the license application fee covers it ($50 for this license). Application fees are nonrefundable.
- 28 questions, 2 hours, open book, 75% to pass (BCD license directory). BCD publishes no topic outline, so our topic split is an estimate derived from the license scope in OAR Division 918-282.
- BCD mails a Letter of Authorization when your application is approved. Call the proctor site named on it to book; you must test within 60 days of the letter. Bring the letter and photo ID.
- Proctor sites are in Bend, Eugene, Hermiston, Klamath Falls, Ontario, Pendleton, Portland, Roseburg, Salem and White City. BCD grades the paper exam and mails the result in about 2 weeks; results are not given by phone.
- The passing score for all BCD licensing exams is 75%. After a failed exam you wait 30 days and send a license reapplication form; the result includes a strength and weakness report.
- Bring your own pencils and, if you use one, a silent, non-printing, non-programmable calculator. Scratch paper is provided.
- Qualification (BCD license directory): Apprenticeship, or class hours plus 4,000 hours of sign work, or 8,000 hours; high school diploma or GED.
- The 2026 Oregon Electrical Specialty Code (2026 NEC) took effect October 1, 2026, replacing the 2023 code. BCD does not say which edition its exams test, so our questions follow the currently adopted 2026 code; where a section number changed, the explanation also gives the 2023 number.
Note: BCD publishes no content outline, topic weights or question-count breakdown for the electrical exams, so our topic split is an estimate. The question count and time come from the BCD license directory. Our 2026 section numbers and rules were checked against NFPA's published 2026 revision records and Oregon's amendment table rather than the printed code, and BCD does not state which code edition the exams test.
Frequently asked questions
Who can take the Oregon limited sign electrician exam?
Candidates who meet BCD's qualification for this license: Apprenticeship, or class hours plus 4,000 hours of sign work, or 8,000 hours; high school diploma or GED. BCD mails a Letter of Authorization once your application is approved.
What's on the exam?
BCD publishes no outline or weights. Our topics follow the legal scope of the license in OAR Division 918-282 and the NEC with Oregon amendments, and our split is an estimate.
Is the exam open book?
Yes. You may bring the references on BCD's materials list, with tabs, highlighting and short margin notes. Practice tests, class notes and added pages are not allowed.
What if I fail?
Wait 30 days, then send BCD a license reapplication form to test again. Results come by mail in about 2 weeks.
Free questions with answers
Show all 10 free questions and answers
Under OAR 918-282-0220, which work does a limited journeyman sign electrician (SIG) perform?
Answer: Installing and servicing electrical signs and outline lighting
The rule's first listed authority is installing and servicing electrical signs and outline lighting. Branch circuits and service equipment work are specifically excluded, and low-voltage systems belong to limited energy licenses.
Reference: Oregon Administrative Rules, Chapter 918, OAR 918-282-0220(1)(a)
A dedicated sign circuit exists at a storefront wall. The job requires extending that circuit 25 ft along the wall to the sign. Under OAR 918-282-0220, a limited journeyman sign electrician:
Answer: May not make the 25 ft extension, because the rule limits an extension to not more than 15 ft
The 15 ft limit in 918-282-0220(1)(c) is a hard distance limit on extending a sign branch circuit. Circuit rating, wall location and the permit do not change what the license authorizes.
Reference: Oregon Administrative Rules, Chapter 918, OAR 918-282-0220(1)(c)
What maximum rating applies to a branch circuit that supplies neon tubing installations?
Answer: 30 amperes
Section 600.5(C)(1) caps neon tubing branch circuits at 30 A. All other signs and outline lighting are limited to 20 A under 600.5(C)(2).
Reference: 2026 National Electrical Code (NFPA 70), Section 600.5(C)(1)
For the purpose of calculations, how does Section 600.5(C) treat a branch circuit that supplies a sign?
Answer: As a continuous load
Section 600.5(C) says sign branch circuits are considered continuous loads for calculations, so the load is limited to 80 percent of the circuit rating.
Reference: 2026 National Electrical Code (NFPA 70), Section 600.5(C)
What is the maximum interval between fasteners for a straight run of EMT, apart from the support near terminations?
Answer: 10 ft
Section 358.30(A)(1) sets securing at intervals not to exceed 3 m (10 ft). The 4 1/2 ft figure belongs to flexible metal conduit in 348.30.
Reference: 2026 National Electrical Code (NFPA 70), Section 358.30(A)(1)
For over-1000 V neon secondary wiring in a metal conduit, how far must the conductor insulation extend beyond the end of the conduit or tubing under 600.32(G)?
Answer: Not less than 2 1/2 in. (65 mm)
Section 600.32(G) requires the insulation on all conductors to extend at least 65 mm (2 1/2 in.) beyond the metal conduit or tubing.
Reference: 2026 National Electrical Code (NFPA 70), Section 600.32(G)
May the metal parts of a building serve as an equipment grounding conductor or secondary return conductor for a sign?
Answer: No, metal parts of a building may not be used for either purpose
Sections 600.7(A)(5) and (B)(3) prohibit using metal building parts as an equipment grounding conductor, secondary return or bonding means for signs and outline lighting.
Reference: 2026 National Electrical Code (NFPA 70), Section 600.7(A)(5) and (B)(3)
Listed flexible metal conduit that encloses a neon transformer secondary conductor may serve as the bonding means if the total accumulative length of the conduit in the secondary circuit does not exceed:
Answer: 100 ft (30 m)
Section 600.7(B)(4) permits listed FMC or LFMC to serve as the bond where the accumulated length in the secondary circuit is no more than 30 m (100 ft).
Reference: 2026 National Electrical Code (NFPA 70), Section 600.7(B)(4)
A neon transformer is rated 15,000 volts and 60 milliamperes on the secondary and is supplied at 120 volts on the primary. Ignoring losses, what is the approximate primary current?
Answer: 7.5 amperes
Secondary VA = 15,000 V x 0.060 A = 900 VA. Primary current = 900 / 120 = 7.5 A. Dividing by 240 gives 3.75 A, which is for a 240 V primary; forgetting to convert milliamperes gives an absurd figure.
Reference: Transformer VA (electrical theory), Transformer power balance, VA = V x I
Under OSHA's lockout/tagout standard, which step comes right after shutting down the equipment and before applying locks?
Answer: Isolating the equipment from its energy sources
29 CFR 1910.147(d) sequences the steps: preparation, shutdown, isolation, lockout/tagout device application, release of stored energy and verification of isolation. Isolation must occur before locks are applied, and verification follows application.
Reference: 29 CFR (OSHA), 29 CFR 1910.147(d)
Sources
- Oregon BCD: license exams and locations (opens in a new tab)
- Oregon Building Codes Division (licensing) (opens in a new tab)
- Oregon BCD: Electrical Specialty Code adoption (opens in a new tab)
Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.