Requirements at a glance
| Agency | Oklahoma Construction Industries Board (CIB); exams by PSI |
|---|---|
| Experience | Refrigeration experience (hours not stated in the bulletin; see the CIB) |
| Exam | 60 scored questions, 2.5 hours, 70% (42) |
| Books allowed | IMC (2018 or 2024 with Oklahoma revisions), Modern Refrigeration and Air Conditioning, 29 CFR 1926 |
| Fee | $92 to PSI per exam portion (non-refundable), plus CIB application and license fees |
| Retest | 30 days after a fail; 90 days after each later fail (electrical is always 30) |
Refrigeration technicians applying to the Oklahoma Construction Industries Board for a journeyman license to install, maintain, repair or alter refrigeration systems while employed by a refrigeration contractor.
Official links
How to get licensed, step by step
Register and log your hours
Register with the CIB as an apprentice and log your hours under a licensed contractor (1 year is 2,000 hours). Have your employer's affidavits notarized.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Apply to the CIB
Send the CIB your application and notarized experience affidavits. When it approves you, you receive an Ok Con ID.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Schedule with PSI
Book your exam with PSI online or at (855) 834-8750. Contractor applicants also take the Business and Law portion.
Schedule with PSI (Oklahoma contractor exams) (opens in a new tab)PSI: Oklahoma CIB Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)
Pass and get licensed
After you pass, send the CIB your results and license fee to receive your license.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
How to prepare
- All Oklahoma trade exams are open book, so the skill is finding answers fast: bound books, permanent tabs only, highlighting allowed, no writing.
- Bring a silent, non-programmable calculator. The exam adds up to 10 unscored experimental questions that count against your time.
- Equipment and components (17) and systems operations (15) are over half the exam: compressors, condensers, evaporators, metering devices and troubleshooting from Modern Refrigeration.
- Electrical knowledge and controls (15) covers motors, circuits, meters and relays.
- Piping pressure tests and refrigerant piping rules come from IMC Chapter 11.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the IMC and Modern Refrigeration. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC) with Oklahoma revisionsEssential
The bulletin lists the 2018 edition and allows the 2024 edition from 9/14/2026; the 2018 code stops being accepted on 12/14/2026.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
Modern Refrigeration and Air Conditioning (Althouse, Turnquist, Bracciano), 21st or 22nd EditionEssential
The bulletin allows the 20th, 21st or 22nd edition; the 20th is not allowed after 11/1/2026.
Official reference list (as published by the testing agency)
- International Mechanical Code, 2018 or 2024 edition, with Oklahoma revisions
- Modern Refrigeration and Air Conditioning, Althouse, Turnquist, Bracciano, 20th, 21st or 22nd edition (20th not allowed after 11/1/2026), or Refrigeration and Air Conditioning Technology, 5th edition (not allowed after 11/1/2026)
- 29 CFR Part 1926 (OSHA construction), or PSI's selections
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Electrical Knowledge and Controls | 15 | |
| Refrigerants | 5 | |
| Piping | 5 | |
| Refrigeration Equipment and Components | 17 | |
| Refrigeration Systems Operations | 15 | |
| Safety | 3 |
Exam day details
- Administered by PSI Services for the Oklahoma Construction Industries Board (CIB).
- Fee: $92 to PSI per exam portion, non-refundable. CIB application and license fees are separate.
- 60 scored questions in 150 minutes; 42 correct (70%) to pass.
- Edition note: the bulletin allows the 2018 or 2024 IMC with Oklahoma revisions; the 2024 code may be used from 9/14/2026 and the 2018 code is no longer allowed as of 12/14/2026. Our questions follow the 2024 code with Oklahoma amendments.
- If you fail, wait 30 days to retest; after each later failure the wait is 90 days.
- Open book: bring your own bound copies of the allowed references. You may highlight, underline and index them beforehand with permanent tabs only; no writing and no sticky notes.
- PSI may add up to 10 unscored experimental questions, which count against your time. A silent, non-printing, non-programmable calculator is allowed.
- The CIB must approve your application first (you receive an Ok Con ID) before you can schedule with PSI.
Frequently asked questions
What's on the Oklahoma refrigeration journeyman exam?
60 scored questions: refrigeration equipment and components 17, electrical knowledge and controls 15, refrigeration systems operations 15, refrigerants 5, piping 5 and safety 3.
How is it different from the HVACR journeyman exam?
It is refrigeration only: no natural gas, air distribution or heating sections, and more weight on equipment, components and system operation.
Which books are allowed?
The IMC with Oklahoma revisions, Modern Refrigeration and Air Conditioning (or the older Delmar text until 11/1/2026) and 29 CFR Part 1926.
Free questions with answers
Show all 10 free questions and answers
A resistive defrost heater element on a 240-volt circuit draws 12 amperes. What is the resistance of the element?
Answer: 20 ohms
Ohm's law: R = E / I = 240 V / 12 A = 20 ohms. 2,880 results from multiplying volts by amps (that is watts, not ohms), 0.05 comes from inverting the formula (12/240), and 228 comes from subtracting instead of dividing.
Reference: General refrigeration practice, Ohm's law (E = I x R)
A 7.5 kW single-phase resistance defrost heater is connected to a 240-volt supply. What current does it draw at full load?
Answer: 31.3 amperes
I = P / E = 7,500 W / 240 V = 31.25, about 31.3 A. Using 120 V by mistake gives 62.5 A, dropping a decimal place gives 3.1 A, and 18.0 A comes from wrongly applying a three-phase factor (7,500 / (240 x 1.732)).
Reference: General refrigeration practice, Power formula (P = E x I) for resistive loads
In the safety group designation A2L, what does the "2L" part indicate?
Answer: Lower flammability with a low burning velocity
Under ASHRAE 34 classification used by IMC Section 1103.1, the letter (A or B) shows toxicity, and the number shows flammability: 1 none, 2L lower with low burning velocity, 2 lower, 3 higher. Table 1103.1 lists R-32 as A2L and R-290 as A3.
Reference: 2024 International Mechanical Code (Oklahoma amendments), 1103.1 and Table 1103.1
Used refrigerant from one owner's walk-in cooler is to be installed in a different owner's equipment. Under IMC 1102.2.2.3, what is required?
Answer: Testing to confirm it meets the purity requirements of AHRI 700
Section 1102.2.2.3 says used refrigerant shall not be reused in a different owner's equipment unless it is tested and found to meet AHRI 700 purity, which is reclamation. Filtering and drying alone is the standard for recovered refrigerant reused in the same owner's systems.
Reference: 2024 International Mechanical Code (Oklahoma amendments), 1102.2.2.3
While brazing a refrigerant line, what inert gas pressure must be maintained through the piping according to IMC 1108.3.1?
Answer: Not less than 1.0 psi and not more than 3.0 psi
Section 1108.3.1 requires pre-purging with oxygen-free nitrogen, helium or argon for five volume changes, then holding the inert gas flow at 1.0 to 3.0 psi during brazing. This prevents oxide scale inside the tube. Higher pressures can blow molten filler out of the joint.
Reference: 2024 International Mechanical Code (Oklahoma amendments), 1108.3.1
Which pressures act on a thermostatic expansion valve diaphragm to open the valve, and which act to close it?
Answer: Bulb pressure opens it; evaporator pressure and spring pressure close it
The remote bulb charge pressure pushes the diaphragm in the opening direction. Evaporator pressure (or the external equalizer pressure) and the adjustable spring both push in the closing direction. The valve modulates to hold a steady superheat at the evaporator outlet.
Reference: General refrigeration practice, Thermostatic expansion valve operation
Where is a liquid-line filter-drier normally installed?
Answer: In the liquid line ahead of the metering device
A filter-drier on the liquid line removes moisture, acid and particles before they reach the expansion valve or capillary tube, where they could freeze up or plug the metering device. Suction-line driers are used only for cleanup after a burnout.
Reference: General refrigeration practice, Filter-driers
A TXV system shows high superheat, low suction pressure, low head pressure and bubbles in the liquid line sight glass. What is the most likely cause?
Answer: A low refrigerant charge from a leak
Too little refrigerant starves the evaporator (high superheat) and reduces both pressures. Flash gas in the sight glass shows the condenser cannot deliver solid liquid. A dirty condenser and non-condensables both raise head pressure, and an overfed valve gives low superheat.
Reference: General refrigeration practice, Diagnosing refrigerant charge
A semi-hermetic compressor shows 62 psig oil pump discharge pressure with 18 psig in the crankcase. What is the net oil pressure the oil safety control senses?
Answer: 44 psi
Net oil pressure = oil pump outlet pressure - crankcase pressure = 62 - 18 = 44 psi. The oil failure switch responds to this net value, not gauge pressure alone, and stops the compressor after a time delay if it stays below the control setting.
Reference: General refrigeration practice, Net oil pressure and oil safety controls
Under OSHA construction rules, a portable ladder used to reach a roof must extend at least how far above the landing surface?
Answer: 3 feet
29 CFR 1926.1053(b)(1) requires the side rails of a ladder used for access to a landing to extend at least 3 feet above the landing, or the ladder must be secured and have a grab rail. This gives a handhold when stepping off.
Reference: 29 CFR 1926, 1926.1053(b)(1)
Sources
- PSI: Oklahoma Construction Industries Board Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)
- Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.