Oklahoma licensing exam

Oklahoma HVACR Journeyman Unlimited Exam: Practice Test & Licensing Guide

The PSI exam for an Oklahoma unlimited HVACR journeyman license: 70 scored questions on controls, natural gas, air distribution, refrigeration and heating. Open book, 70% to pass.

Questions
70
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Air Distribution Systems

A return air grille is being added in a mechanical room that also contains a gas-fired water heater with a draft hood. What is the minimum distance the return opening must be kept from the draft hood, measured in any direction?

Requirements at a glance

AgencyOklahoma Construction Industries Board (CIB); exams by PSI
Experience3 years of mechanical (HVACR) experience
Exam70 scored questions, 3 hours, 70% (49)
Books allowedIMC and IFGC (2018 or 2024 with Oklahoma revisions), Modern Refrigeration and Air Conditioning, 29 CFR 1926
Fee$92 to PSI per exam portion (non-refundable), plus CIB application and license fees
Retest30 days after a fail; 90 days after each later fail (electrical is always 30)

HVACR technicians applying to the Oklahoma Construction Industries Board for an unlimited journeyman mechanical license after three years of documented experience.

How to get licensed, step by step

  1. Register and log your hours

    Register with the CIB as an apprentice and log your hours under a licensed contractor (1 year is 2,000 hours). Have your employer's affidavits notarized.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  2. Apply to the CIB

    Send the CIB your application and notarized experience affidavits. When it approves you, you receive an Ok Con ID.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

  3. Schedule with PSI

    Book your exam with PSI online or at (855) 834-8750. Contractor applicants also take the Business and Law portion.

    Schedule with PSI (Oklahoma contractor exams) (opens in a new tab)PSI: Oklahoma CIB Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)

  4. Pass and get licensed

    After you pass, send the CIB your results and license fee to receive your license.

    Oklahoma Construction Industries Board (CIB) (opens in a new tab)

How to prepare

  • All Oklahoma trade exams are open book, so the skill is finding answers fast: bound books, permanent tabs only, highlighting allowed, no writing.
  • Bring a silent, non-programmable calculator. The exam adds up to 10 unscored experimental questions that count against your time.
  • Air distribution (16) and refrigeration and air conditioning systems (16) are almost half the exam: IMC Chapters 6 and 11 and Modern Refrigeration.
  • Electrical knowledge and controls (15) is theory and wiring-diagram reading, not code lookups.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the IMC and the IFGC and Modern Refrigeration. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Mechanical Code, 2018 or 2024 edition, with Oklahoma revisions
  • International Fuel Gas Code, 2018 or 2024 edition, with Oklahoma revisions
  • Modern Refrigeration and Air Conditioning, Althouse, Turnquist, Bracciano, 20th, 21st or 22nd edition (20th not allowed after 11/1/2026)
  • Manual J, 8th Edition (ACCA), Mathematics for Plumbers and Pipefitters, 8th Edition, and an ACCA Ductulator
  • 29 CFR Part 1926 (OSHA construction), or PSI's selections

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Electrical Knowledge and Controls15
Natural Gas10
Air Distribution Systems16
Refrigeration and Air Conditioning Systems16
Heating Systems10
Safety3

Exam day details

  • Administered by PSI Services for the Oklahoma Construction Industries Board (CIB).
  • Fee: $92 to PSI per exam portion, non-refundable. CIB application and license fees are separate.
  • 70 scored questions in 3 hours (180 minutes); 49 correct (70%) to pass.
  • Edition note: the bulletin names the 2018 IMC and IFGC first and allows the 2024 editions from 9/14/2026; the 2018 codes stop being accepted on 12/14/2026. Our questions follow the 2024 codes with Oklahoma amendments.
  • If you fail, wait 30 days to retest; after each later failure the wait is 90 days.
  • Open book: bring your own bound copies of the allowed references. You may highlight, underline and index them beforehand with permanent tabs only; no writing and no sticky notes.
  • PSI may add up to 10 unscored experimental questions, which count against your time. A silent, non-printing, non-programmable calculator is allowed.
  • The CIB must approve your application first (you receive an Ok Con ID) before you can schedule with PSI.

Frequently asked questions

What's on the Oklahoma HVACR journeyman unlimited exam?

70 scored questions: air distribution systems 16, refrigeration and air conditioning systems 16, electrical knowledge and controls 15, natural gas 10, heating systems 10 and safety 3.

What is the difference between unlimited and limited?

A limited license is restricted to equipment up to 25 tons and 500,000 Btu/h per appliance. The unlimited exam has no such limit and has more questions.

Which code editions can I bring?

The 2018 or 2024 IMC and IFGC with Oklahoma revisions until the transition ends on December 14, 2026; after that only the 2024 editions.

Free questions with answers

Show all 10 free questions and answers
  1. A return air grille is being added in a mechanical room that also contains a gas-fired water heater with a draft hood. What is the minimum distance the return opening must be kept from the draft hood, measured in any direction?

    Answer: 10 feet

    IMC 601.5 requires return air openings to be at least 10 feet, measured in any direction, from an open combustion chamber or draft hood of another appliance in the same room or space. Shorter distances such as 3 or 5 feet could let the return pull flue products or spillage into the duct system, which is the hazard the rule prevents.

    Reference: 2024 International Mechanical Code (Oklahoma amendments), 601.5

  2. A contractor proposes setting a gas-fired unit heater inside a ceiling return air plenum to save space. What does IMC 602.1 say about this?

    Answer: It is prohibited, because fuel-fired appliances may not be installed within a plenum

    IMC 602.1 states plainly that fuel-fired appliances shall not be installed within a plenum. Limiting the plenum to one fire area (602.1.2) is a separate requirement and does not make a fuel-fired appliance acceptable inside it.

    Reference: 2024 International Mechanical Code (Oklahoma amendments), 602.1

  3. A gas furnace is to be installed in a private residential garage without any vehicle impact protection. What is the minimum clearance above the floor required by IMC 304.7?

    Answer: 6 feet

    IMC 304.7 requires appliances in private garages and carports to be installed with at least 6 feet of clearance above the floor unless they are protected from vehicle impact and meet the ignition source elevation rule in 304.3. The 8 foot figure applies to public garages in 304.6.

    Reference: 2024 International Mechanical Code (Oklahoma amendments), 304.7

  4. An air handler condensate line will terminate at a gravel French drain outside a house. Under IMC 307.2.1, what is the minimum distance from the outer edge of the foundation to the nearest edge of the pit?

    Answer: 30 inches

    IMC 307.2.1 allows condensate to end in an approved pit or French drain at least 24 x 24 x 24 inches filled with 1 inch washed rock, located at least 30 inches from the outer edge of the foundation to the nearest edge of the pit. The line must also slope at least 1/8 unit vertical in 12 horizontal toward the discharge.

    Reference: 2024 International Mechanical Code (Oklahoma amendments), 307.2.1

  5. Which medium is acceptable for field pressure testing a typical HFC refrigerant piping system under IMC 1110.3 and 1110.3.1?

    Answer: Oxygen-free nitrogen

    IMC 1110.3 lists oxygen-free nitrogen, helium, argon or a premixed nonflammable oxygen-free nitrogen and tracer gas as field test media. Section 1110.3.1 prohibits oxygen, air, refrigerants not listed, and combustible gases, because oil and air or oxygen can ignite under compression.

    Reference: 2024 International Mechanical Code (Oklahoma amendments), 1110.3 and 1110.3.1

  6. Unless a listed exception is met (such as welded or brazed joints), what is the maximum operating pressure of fuel gas piping located inside a building under IFGC 402.7?

    Answer: 5 psig

    IFGC 402.7 limits the maximum operating pressure of piping inside buildings to 5 psig unless one of the listed conditions is met, such as welded or brazed joints, fittings listed to ANSI LC-4/CSA 6.32, flanged joints with welded or brazed pipe-to-flange connections, or piping in a ventilated chase. Values such as 1/2 psig, 14 inches of water column or 2 psig are common system pressures, not the 402.7 ceiling.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), 402.7

  7. A new gas line is buried to feed a main building, and a separate individual line feeds a yard gas light in an approved location not subject to physical damage. What minimum depths below grade apply under IFGC 404.12 and 404.12.1 as adopted in Oklahoma?

    Answer: 18 inches for the main line and 8 inches for the yard light line

    IFGC 404.12 requires underground piping at least 18 inches below grade (Oklahoma text). Section 404.12.1 allows individual lines to outdoor lights, grills and other appliances to be 8 inches below finished grade if approved and not exposed to physical damage.

    Reference: 2024 International Fuel Gas Code (Oklahoma amendments), 404.12 and 404.12.1

  8. A 10 kW electric heat strip is wired for 240 volts single phase. What is its current draw, and how many Btu/h does it produce (1 kW = 3,413 Btu/h)?

    Answer: 41.7 amps and 34,130 Btu/h

    I = P / E = 10,000 W / 240 V = 41.7 amps. Heat output = 10 kW x 3,413 = 34,130 Btu/h. Using 24 amps comes from dividing 240 by 10, and using 10,000 Btu/h ignores the watt-to-Btu conversion.

    Reference: General trade practice, Electric heat: kW to Btu/h

  9. A technician measures line voltages of 460, 455 and 450 volts on a three-phase compressor motor. What is the percent voltage imbalance (maximum deviation from the average divided by the average)?

    Answer: 1.1 percent

    Average = (460 + 455 + 450) / 3 = 455 volts. The maximum deviation from the average is 5 volts. Imbalance = 5 / 455 x 100 = 1.1 percent, which is below the 2 percent commonly allowed by motor makers. Using 10 volts (the spread) gives 2.2 percent.

    Reference: General trade practice, Three-phase motors: voltage imbalance

  10. Under 29 CFR 1926.501(b)(1), at what height above a lower level must employees on an unprotected side or edge of a walking/working surface be protected from falling?

    Answer: 6 feet

    29 CFR 1926.501(b)(1) requires fall protection (guardrails, safety nets or a personal fall arrest system) for employees on unprotected sides and edges 6 feet or more above a lower level in construction. This is the trigger height an HVAC crew works to on a roof edge.

    Reference: 29 CFR 1926, 1926.501(b)(1)

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.