Requirements at a glance
| Agency | Oklahoma Construction Industries Board (CIB); exams by PSI |
|---|---|
| Experience | 3 years of mechanical (HVACR) experience |
| Exam | 60 scored questions, 3 hours, 70% (42) |
| Books allowed | IMC and IFGC (2018 or 2024 with Oklahoma revisions), Modern Refrigeration and Air Conditioning, 29 CFR 1926 |
| Fee | $92 to PSI per exam portion (non-refundable), plus CIB application and license fees |
| Retest | 30 days after a fail; 90 days after each later fail (electrical is always 30) |
HVACR technicians applying to the Oklahoma Construction Industries Board for a limited journeyman mechanical license, which covers a complete system limited to 25 tons of cooling and 500,000 Btu/h of heating.
Official links
How to get licensed, step by step
Register and log your hours
Register with the CIB as an apprentice and log your hours under a licensed contractor (1 year is 2,000 hours). Have your employer's affidavits notarized.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Apply to the CIB
Send the CIB your application and notarized experience affidavits. When it approves you, you receive an Ok Con ID.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Schedule with PSI
Book your exam with PSI online or at (855) 834-8750. Contractor applicants also take the Business and Law portion.
Schedule with PSI (Oklahoma contractor exams) (opens in a new tab)PSI: Oklahoma CIB Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)
Pass and get licensed
After you pass, send the CIB your results and license fee to receive your license.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
How to prepare
- All Oklahoma trade exams are open book, so the skill is finding answers fast: bound books, permanent tabs only, highlighting allowed, no writing.
- Bring a silent, non-programmable calculator. The exam adds up to 10 unscored experimental questions that count against your time.
- Electrical knowledge and controls (15) is the biggest section and is theory and wiring-diagram reading, not code lookups.
- The limited license covers systems up to 25 tons and 500,000 Btu/h per appliance; the blueprint matches the unlimited exam with fewer duct and refrigeration questions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the IMC and the IFGC and Modern Refrigeration. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC) with Oklahoma revisionsEssential
The bulletin lists the 2018 edition and allows the 2024 edition from 9/14/2026; the 2018 code stops being accepted on 12/14/2026.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
International Fuel Gas Code (IFGC) with Oklahoma revisionsEssential
The bulletin allows the 2018 or 2024 edition. Used for the fuel gas and natural gas sections.
ICC store (opens in a new tab)Read free (UpCodes) (opens in a new tab)
Modern Refrigeration and Air Conditioning (Althouse, Turnquist, Bracciano), 21st or 22nd EditionEssential
The bulletin allows the 20th, 21st or 22nd edition; the 20th is not allowed after 11/1/2026.
Official reference list (as published by the testing agency)
- International Mechanical Code, 2018 or 2024 edition, with Oklahoma revisions
- International Fuel Gas Code, 2018 or 2024 edition, with Oklahoma revisions
- Modern Refrigeration and Air Conditioning, Althouse, Turnquist, Bracciano, 20th, 21st or 22nd edition (20th not allowed after 11/1/2026), or Refrigeration and Air Conditioning Technology, 5th edition (not allowed after 11/1/2026)
- Mathematics for Plumbers and Pipefitters, Lee Smith, 8th Edition
- 29 CFR Part 1926 (OSHA construction), or PSI's selections
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Electrical Knowledge and Controls | 15 | |
| Natural Gas | 9 | |
| Air Distribution Systems | 10 | |
| Refrigeration and Air Conditioning Systems | 13 | |
| Heating Systems | 10 | |
| Safety | 3 |
Exam day details
- Administered by PSI Services for the Oklahoma Construction Industries Board (CIB).
- Fee: $92 to PSI per exam portion, non-refundable. CIB application and license fees are separate.
- 60 scored questions in 180 minutes; 42 correct (70%) to pass.
- Edition note: the bulletin allows the 2018 or 2024 IMC and IFGC with Oklahoma revisions; the 2024 code may be used from 9/14/2026 and the 2018 code is no longer allowed as of 12/14/2026. Our questions follow the 2024 code with Oklahoma amendments.
- If you fail, wait 30 days to retest; after each later failure the wait is 90 days.
- Open book: bring your own bound copies of the allowed references. You may highlight, underline and index them beforehand with permanent tabs only; no writing and no sticky notes.
- PSI may add up to 10 unscored experimental questions, which count against your time. A silent, non-printing, non-programmable calculator is allowed.
- The CIB must approve your application first (you receive an Ok Con ID) before you can schedule with PSI.
Frequently asked questions
What's on the Oklahoma HVACR journeyman limited exam?
60 scored questions: electrical knowledge and controls 15, refrigeration and air conditioning systems 13, air distribution systems 10, heating systems 10, natural gas 9 and safety 3.
What does limited mean?
The license covers a complete system limited to 25 tons of cooling and 500,000 Btu/h of heating. The unlimited exam has no such limit and has more questions.
Which code editions can I bring?
The 2018 or 2024 IMC and IFGC with Oklahoma revisions until December 14, 2026; after that only the 2024 editions.
Free questions with answers
Show all 10 free questions and answers
A natural gas line serving a rooftop heating unit will operate at 4 psig. What is the minimum pressure test required under IFGC 406.4.1?
Answer: 6 psig
The test pressure must be at least 1-1/2 times the maximum working pressure: 1.5 x 4 psig = 6 psig. Testing at the working pressure (4 psig) is too low, 3 psig is only the absolute minimum, and doubling to 8 psig is not what the code states.
Reference: 2024 International Fuel Gas Code (Oklahoma amendments), 406.4.1
A flexible air connector is installed to carry supply air from a plenum in a mechanical room to a diffuser in the next room. Which IMC section makes this installation a violation?
Answer: 603.6.2.2, because flexible air connectors may not pass through any wall, floor or ceiling
IMC 603.6.2.2 states that flexible air connectors shall not pass through any wall, floor or ceiling. Only rigid duct (with protection under 603.7 and Section 607 where required) may do so. The 250 degree F limit and the manufacturer-specified appliance clearance are different provisions.
Reference: 2024 International Mechanical Code (Oklahoma amendments), 603.6.2.2
Which return-air arrangement is prohibited by IMC 601.5?
Answer: Connecting a furnace return directly to a crawl space
IMC 601.5 says return air shall not be taken from a crawl space through a direct connection to the return side of a forced-air furnace, although transfer openings in the crawl space enclosure are not prohibited. Transfer openings and Manual D sizing are allowed, and return air plenums are permitted under Section 602 when constructed accordingly.
Reference: 2024 International Mechanical Code (Oklahoma amendments), 601.5
What minimum slope must a cooling-coil condensate drain maintain in the direction of discharge under IMC 307.2.1?
Answer: 1/8 unit vertical in 12 units horizontal (1 percent)
IMC 307.2.1 requires condensate piping to slope at least 1/8 unit vertical in 12 units horizontal (1 percent) in the direction of discharge. A steeper slope is allowed, but less than 1/8 inch per foot is a violation.
Reference: 2024 International Mechanical Code (Oklahoma amendments), 307.2.1
A technician connects a cooling-coil condensate line directly into the vertical vent stack of the plumbing system. What is wrong with this under IMC 307.2.1.1?
Answer: Condensate drains may not connect directly to any plumbing drain, waste or vent pipe
IMC 307.2.1.1 prohibits direct connection of condensate drains to any plumbing drain, waste or vent pipe. Discharge may go to a listed type of fixture or receptor (floor sink, floor drain, standpipe, utility sink, laundry sink and so on) or to grade outdoors.
Reference: 2024 International Mechanical Code (Oklahoma amendments), 307.2.1.1
How far above the highest connected appliance flue collar must a vent terminate, at minimum, under IMC 802.6 (vents other than direct-vent)?
Answer: 5 feet in vertical height
IMC 802.6 requires vents to terminate not less than 5 feet in vertical height above the highest connected appliance flue collar, with exceptions such as direct-vent appliances installed per the manufacturer's instructions and listed vent types.
Reference: 2024 International Mechanical Code (Oklahoma amendments), 802.6
A single-wall vent connector serves a gas furnace and ties into a vent that is 20 feet tall. What is the maximum horizontal length of that connector under IFGC 503.10.9 (not an engineered system)?
Answer: 15 feet
Gas appliances are vented under the IFGC (IMC 801.1). IFGC 503.10.9 limits the horizontal length of a single-wall connector to 75 percent of the height of the chimney or vent: 0.75 x 20 feet = 15 feet. Using the full 20 feet is the Type B double-wall limit (100 percent), 10 feet is half the height, and 25 feet exceeds the vent height.
Reference: 2024 International Fuel Gas Code (Oklahoma amendments), 503.10.9
A 15-ohm electric resistance heater is connected to 120 volts. How much current does it draw?
Answer: 8 amperes
Ohm's law: I = E / R = 120 / 15 = 8 amperes. Multiplying (120 x 15) gives 1,800, and 15 amperes just repeats the resistance.
Reference: General trade practice, Ohm's law: I = E / R
A compressor and fan group draws 3.2 kW while running for 8 hours. Electricity costs 12 cents per kWh. What is the cost?
Answer: $3.07
Energy = 3.2 kW x 8 h = 25.6 kWh. Cost = 25.6 x $0.12 = $3.07. $25.60 is the kWh figure, $0.38 is 3.2 x $0.12, and $30.72 is a decimal slip.
Reference: General trade practice, Energy cost: kWh x rate
What is the required height of the top edge of a guardrail system on a roof working surface under 29 CFR 1926.502(b)(1)?
Answer: 42 inches, plus or minus 3 inches
29 CFR 1926.502(b)(1) sets the top edge of top rails at 42 inches (plus or minus 3 inches) above the walking-working level. Midrails go halfway between the top edge and the working level.
Reference: 29 CFR 1926, 1926.502(b)(1)
Sources
- PSI: Oklahoma Construction Industries Board Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)
- Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.