New Mexico licensing exam

New Mexico MM-2 Natural Gas Fitting Contractor Exam: Practice Test & Licensing Guide

New Mexico's MM-2 natural gas fitting contractor exam: 100 questions on gas piping, sizing, safety and testing, appliances, combustion air, venting and heating systems, from the 2021 UMC and UPC. Open book, 75% to pass.

Questions
100
Time limit
4.25 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Safety and Testing

A new 3 inch steel gas line 40 feet long, designed to operate at 0.5 psi, is being placed in operation. Using Table 1313.6.1, how must the air in this line be handled?

Requirements at a glance

AgencyNew Mexico Regulation and Licensing Department, Construction Industries Division (CID); exams by PSI
Exam100 questions, 255 minutes, 75% to pass, open book
Books allowed2021 UPC and UMC, NMAC 14.8.2 and 14.9.2, and IPT's Pipe Trades Handbook (2016); Modern Refrigeration and Air Conditioning (19th or 20th ed.)
FeesExam fees are paid to PSI (see the exam details above); license fees are separate. Check CID for current license fees.
TimingTest within 6 months of becoming eligible. The exam fee and a passing score are each valid for 1 year.

Contractors applying to Construction Industries Division for an MM-2 natural gas fitting license. You also need the Business and Law exam.

How to get licensed, step by step

  1. Apply to CID through PSI

    Candidates must be pre-approved before they can schedule. Submit your application and proof of qualifications through PSI's New Mexico construction page, or call PSI's approvals line at 877-663-9267.

    PSI: apply and schedule New Mexico exams (opens in a new tab)New Mexico Construction Industries Division (CID) (opens in a new tab)

  2. Get your references

    Buy the exact code editions in PSI's bulletin. Books must be bound; highlighting, underlining and permanent tabs are allowed, but no loose notes or Post-its.

    PSI Contractor Candidate Information Bulletin (opens in a new tab)New Mexico Administrative Code (NMAC) titles (opens in a new tab)

  3. Schedule and pay PSI

    After approval, contact PSI to schedule a seat and pay. Test sites include Albuquerque, Farmington, Las Cruces, Roswell and Santa Fe.

    PSI: apply and schedule New Mexico exams (opens in a new tab)

  4. Pass and finish your license

    You need 75%. You may not take the same exam more than twice in 30 days. Contractors also need the Business and Law exam; journeyman candidates take a hands-on practical exam too.

    New Mexico Construction Industries Division (CID) (opens in a new tab)PSI Contractor Candidate Information Bulletin (opens in a new tab)

How to prepare

  • Piping (19), general knowledge and principles (16) and appliances (15) are half the exam; gas sizing adds 13, so practice the sizing tables.
  • Combustion air (9), chimneys, flues and vents (10) and heating systems (10) are 29 more: tab the UMC venting and combustion air chapters and the UPC fuel gas chapter.
  • You also need the Business and Law exam.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Uniform Mechanical Code (UMC), 2021 (IAPMO)

    Gas piping, combustion air and venting for the gas fitter exams; the main code for MM-3 HVAC and pipe fitter; the plumbing exams list it too.

    IAPMO (opens in a new tab)

  • Uniform Plumbing Code (UPC), 2021 (IAPMO)Essential

    The main plumbing code for the exam, with the New Mexico plumbing code (NMAC 14.8.2).

    IAPMO (opens in a new tab)

  • IPT's Pipe Trades Handbook, Robert A. Lee, 2016

    Listed as an allowed reference for the plumbing, gas fitter, HVAC and pipe fitter exams.

Official reference list (as published by the testing agency)
  • Uniform Mechanical Code (UMC), 2021 (IAPMO)
  • Uniform Plumbing Code (UPC), 2021 (IAPMO)
  • New Mexico Plumbing Code (NMAC 14.8.2)
  • New Mexico Mechanical Code (NMAC 14.9.2)
  • IPT's Pipe Trades Handbook, Robert A. Lee, 2016
  • Modern Refrigeration and Air Conditioning, 19th or 20th Edition (Goodheart-Willcox)

What's on the exam

Official content outline from PSI, (number of questions per topic):

TopicQuestions
General Knowledge and Principles16
Piping19
Gas Sizing13
Safety and Testing8
Appliances15
Combustion Air9
Chimneys, Flues, and Vents10
Heating Systems10

Exam day details

  • Administered by PSI, for the New Mexico Regulation and Licensing Department, Construction Industries Division (CID).
  • Fee: $68.88 per exam, paid to PSI. License and application fees are separate.
  • 100 questions in 255 minutes; 75% to pass (75 points).
  • Open book. Bring bound references; you may highlight, underline and index them with permanent tabs only. No loose papers, notes or Post-it tabs, and no writing in the books.
  • PSI's bulletin lists the New Mexico plumbing and mechanical codes as the 2015 NMAC text alongside the 2021 UPC and UMC. Confirm the current NMAC parts before you buy.
  • Get CID pre-approval through PSI first (PSI approvals line 877-663-9267). Once you are eligible you must test within 6 months, or reapply with the Division. Your exam fee is valid for 1 year and a passing score is valid for 1 year.
  • You may not take the same exam more than twice in a 30-day period; after two fails you must wait 30 days from your first attempt.
  • Piping (19), general knowledge and principles (16) and appliances (15) are half the exam.

Frequently asked questions

What's on the New Mexico MM-2 gas fitting exam?

PSI's outline, 100 questions: General Knowledge and Principles 16; Piping 19; Gas Sizing 13; Safety and Testing 8; Appliances 15; Combustion Air 9; Chimneys, Flues, and Vents 10; Heating Systems 10.

Which code editions does the New Mexico exam use?

PSI's bulletin pins the editions: for electrical, the 2020 NEC plus the New Mexico Electrical Code (NMAC 14.10.4); for plumbing and gas, the 2021 UPC and UMC plus the New Mexico plumbing and mechanical codes (NMAC 14.8.2 and 14.9.2); for building, the 2021 IRC or IBC plus NMAC 14.7.3 or 14.7.2. Code questions use only the listed edition.

Who gives the New Mexico contractor and journeyman exams?

PSI, for the Construction Industries Division (CID) of the Regulation and Licensing Department. CID pre-approves your application, then you schedule with PSI at a New Mexico test center (Albuquerque, Farmington, Las Cruces, Roswell or Santa Fe) or an approved center elsewhere.

Free questions with answers

Show all 10 free questions and answers
  1. A new 3 inch steel gas line 40 feet long, designed to operate at 0.5 psi, is being placed in operation. Using Table 1313.6.1, how must the air in this line be handled?

    Answer: It must first be displaced with an inert gas, then with fuel gas discharged outdoors

    Table 1313.6.1 lists 3 inch to under 4 inch pipe longer than 30 feet, so a 40 foot run meets the criteria even though the pressure is low. Section 1313.6.1.2 then requires the air to be displaced first with an inert gas, followed by fuel gas, with discharge outdoors per Section 1313.6.1.3. Indoor purging under Section 1313.6.2 applies only when the pressure is 2 psig or less AND no section meets the table's size and length criteria.

    Reference: 2021 Uniform Mechanical Code, Table 1313.6.1; Section 1313.6.1.2

  2. Which of these installations is outside the coverage of UMC Chapter 13, Fuel Gas Piping?

    Answer: Oxygen-fuel gas cutting and welding systems in a fab shop

    Section 1302.3 lists applications the chapter does not cover, and item (4) is oxygen-fuel gas cutting and welding systems. Natural gas piping from the point of delivery to appliance connections is the core of Chapter 13 (Section 1302.1), and Section 1301.1 covers undiluted propane up to 10 psi.

    Reference: 2021 Uniform Mechanical Code, Section 1302.3

  3. Gas service to a vacant house was shut off at the meter by the utility. Who may turn the gas back on under Section 1305.1?

    Answer: An authorized agent or employee of the serving gas supplier

    Section 1305.1 makes it unlawful for anyone except an authorized agent or employee of the company supplying gas to those premises to turn on or reconnect gas service where service is not being rendered. A gas fitting license or ownership of the property does not give that authority.

    Reference: 2021 Uniform Mechanical Code, Section 1305.1

  4. A designer in Albuquerque specifies Type L copper pipe for a natural gas line because the local gas has very low hydrogen sulfide. Under New Mexico's amendment to UMC Section 1308.5.2.2, is copper pipe allowed?

    Answer: No, copper and copper alloy pipe shall not be used

    NMAC 14.9.2.21(A) deletes UMC 1308.5.2.2 and substitutes a flat rule: copper and copper alloy pipe shall not be used. The 0.3 grain hydrogen sulfide limit is the deleted model-code text, so it does not open the door in New Mexico. The plumbing code amendment (NMAC 14.8.2.22(A)) bans copper and brass pipe the same way.

    Reference: NMAC 14.9.2 (New Mexico Mechanical Code), amending 2021 UMC, 14.9.2.21 NMAC (A), amending UMC Section 1308.5.2.2

  5. A system's longest run from the meter is 80 feet. A branch serving a 70 cfh appliance is 45 feet from the meter to its outlet. Using the branch length method and Table 1315.2(1) (natural gas, under 2 psi, 0.5 in. w.c. drop), what size is that branch?

    Answer: 1/2 inch, from the 50 foot row

    Under the branch length method (Section 1315.1.2), branch piping is sized by the length from the point of delivery to the most remote outlet in that branch, here 45 feet. Section 1315.4 says to use the next longer row when the exact length is not shown, so use 50 feet, where 1/2 inch carries 72 cfh (enough for 70). The 80 foot row (1/2 inch = 56 cfh) would apply under the longest length method, and the 40 foot row rounds down, which is not allowed.

    Reference: 2021 Uniform Mechanical Code, Section 1315.1.2; Section 1315.4; Table 1315.2(1)

  6. An older, leaky house has a measured infiltration rate of 0.90 ACH. For a 60,000 Btu/h fan-assisted furnace, what volume does the known air infiltration rate method require?

    Answer: 1,500 cubic feet

    Section 701.4.2(3) says an infiltration rate greater than 0.60 ACH shall not be used in the equations, so use 0.60. Equation 701.4.2(2): 15 / 0.60 x 60 = 1,500 cubic feet. Using 0.90 gives 1,000 cubic feet (not allowed), 2,100 uses the non-fan-assisted factor of 21, and 3,000 is the standard 50 cubic feet per 1,000 Btu/h.

    Reference: 2021 Uniform Mechanical Code, Section 701.4.2; Equation 701.4.2(2)

  7. A power-vented (mechanical draft, not direct vent) water heater terminates through a side wall at the same height as an operable window. How far horizontally from the window must the vent terminal be?

    Answer: At least 4 feet

    Section 802.8.1 requires a mechanical draft venting system, other than direct vent, to terminate at least 4 feet below, 4 feet horizontally from, or 1 foot above any door, operable window or gravity air inlet. Beside the window, that means 4 feet horizontally. The 1 foot figure applies only when the terminal is above the opening, and the bottom of the terminal must also be 12 inches above grade.

    Reference: 2021 Uniform Mechanical Code, Section 802.8.1

  8. A commercial building is supplied with 2 psi gas, but a new rooftop unit's rating plate calls for 7 in. w.c. inlet pressure. What does Section 902.14 require?

    Answer: A gas appliance pressure regulator ahead of the appliance

    Section 902.14 requires a gas appliance pressure regulator wherever the supply pressure is higher than the appliance's design pressure or varies beyond its design limits. Upsizing the pipe does not reduce static pressure, and an appliance control valve is not designed to hold back 2 psi. Look in Chapter 9, Section 902.0 General, for the regulator rules.

    Reference: 2021 Uniform Mechanical Code, Section 902.14

  9. An appliance pressure regulator needs atmospheric venting and has no vent-limiting means. Where may its vent line NOT terminate under Section 902.15?

    Answer: Into the appliance flue or exhaust system

    Section 902.15 lets regulator vents run outdoors (protected from water, insects and debris) or, where the vent is integral to the appliance, into the combustion chamber adjacent to a continuous pilot. Item (4) says a regulator shall never be vented to the appliance flue or exhaust system. The combustion-chamber option is allowed, so it is not the answer.

    Reference: 2021 Uniform Mechanical Code, Section 902.15

  10. A service tech wants a ball valve between a boiler and its pressure relief valve so the relief valve can be changed without draining the system. What does Section 904.6 allow?

    Answer: No shutoff valve between the relief valve and boiler

    Section 904.6 requires listed or approved ASME relief or safety valves and says a shutoff valve shall not be placed between the relief valve and the boiler, or on the discharge pipe between the valve and the atmosphere. There is no locked-open, full-port or low-pressure exception in this section. A closed valve there would disable the relief valve entirely.

    Reference: 2021 Uniform Mechanical Code, Section 904.6

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.