New Mexico licensing exam

New Mexico MM-1 Plumbing Contractor Exam: Practice Test & Licensing Guide

New Mexico's MM-1 plumbing contractor exam: 100 questions on drainage, waste and vents, water supply, backflow, storm drainage, fixtures, traps and isometrics, from the 2021 UPC and New Mexico plumbing code. Open book, 75% to pass.

Questions
100
Time limit
4.166666666666667 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Drainage, Waste, and Vents

A 4-inch horizontal building drain cannot be laid at 1/4 inch per foot because of the structure's geometry. The AHJ approves a reduced slope. What is the least slope the UPC allows for this pipe?

Requirements at a glance

AgencyNew Mexico Regulation and Licensing Department, Construction Industries Division (CID); exams by PSI
Exam100 questions, 250 minutes, 75% to pass, open book
Books allowed2021 UPC and UMC, NMAC 14.8.2 and 14.9.2, and IPT's Pipe Trades Handbook (2016)
FeesExam fees are paid to PSI (see the exam details above); license fees are separate. Check CID for current license fees.
TimingTest within 6 months of becoming eligible. The exam fee and a passing score are each valid for 1 year.

Contractors applying to Construction Industries Division for an MM-1 plumbing license. You also need the Business and Law exam.

How to get licensed, step by step

  1. Apply to CID through PSI

    Candidates must be pre-approved before they can schedule. Submit your application and proof of qualifications through PSI's New Mexico construction page, or call PSI's approvals line at 877-663-9267.

    PSI: apply and schedule New Mexico exams (opens in a new tab)New Mexico Construction Industries Division (CID) (opens in a new tab)

  2. Get your references

    Buy the exact code editions in PSI's bulletin. Books must be bound; highlighting, underlining and permanent tabs are allowed, but no loose notes or Post-its.

    PSI Contractor Candidate Information Bulletin (opens in a new tab)New Mexico Administrative Code (NMAC) titles (opens in a new tab)

  3. Schedule and pay PSI

    After approval, contact PSI to schedule a seat and pay. Test sites include Albuquerque, Farmington, Las Cruces, Roswell and Santa Fe.

    PSI: apply and schedule New Mexico exams (opens in a new tab)

  4. Pass and finish your license

    You need 75%. You may not take the same exam more than twice in 30 days. Contractors also need the Business and Law exam; journeyman candidates take a hands-on practical exam too.

    New Mexico Construction Industries Division (CID) (opens in a new tab)PSI Contractor Candidate Information Bulletin (opens in a new tab)

How to prepare

  • Drainage, waste and vents is 25 of the 100 questions; tab UPC Chapters 7 and 9 and the DFU and sizing tables.
  • Isometric analysis (10), backflow prevention (9) and septic and sewer (6, from NMAC 20.7.3) are easy to overlook.
  • You also need the Business and Law exam.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Uniform Plumbing Code (UPC), 2021 (IAPMO)Essential

    The main plumbing code for the exam, with the New Mexico plumbing code (NMAC 14.8.2).

    IAPMO (opens in a new tab)

  • Uniform Mechanical Code (UMC), 2021 (IAPMO)

    Gas piping, combustion air and venting for the gas fitter exams; the main code for MM-3 HVAC and pipe fitter; the plumbing exams list it too.

    IAPMO (opens in a new tab)

  • IPT's Pipe Trades Handbook, Robert A. Lee, 2016

    Listed as an allowed reference for the plumbing, gas fitter, HVAC and pipe fitter exams.

Official reference list (as published by the testing agency)
  • Uniform Plumbing Code (UPC), 2021 (IAPMO)
  • New Mexico Plumbing Code (NMAC 14.8.2)
  • Uniform Mechanical Code (UMC), 2021 (IAPMO)
  • New Mexico Mechanical Code (NMAC 14.9.2)
  • IPT's Pipe Trades Handbook, Robert A. Lee, 2016
  • New Mexico Liquid Waste Disposal Regulations (NMAC 20.7.3), 2005
  • NFPA 30A, 2015 or earlier

What's on the exam

Official content outline from PSI, (number of questions per topic):

TopicQuestions
Drainage, Waste, and Vents25
Water Supply Systems10
Backflow Prevention9
Storm Drainage Systems6
Plumbing Fixtures, including Water Heaters and Accessibility10
General Knowledge and General Regulations15
Interceptors and Traps9
Isometric Analysis10
Septic and Sewer6

Exam day details

  • Administered by PSI, for the New Mexico Regulation and Licensing Department, Construction Industries Division (CID).
  • Fee: $68.88 per exam, paid to PSI. License and application fees are separate.
  • 100 questions in 250 minutes; 75% to pass (75 points).
  • Open book. Bring bound references; you may highlight, underline and index them with permanent tabs only. No loose papers, notes or Post-it tabs, and no writing in the books.
  • PSI's bulletin lists the New Mexico plumbing and mechanical codes as the 2015 NMAC text alongside the 2021 UPC and UMC. Confirm the current NMAC parts before you buy.
  • Get CID pre-approval through PSI first (PSI approvals line 877-663-9267). Once you are eligible you must test within 6 months, or reapply with the Division. Your exam fee is valid for 1 year and a passing score is valid for 1 year.
  • You may not take the same exam more than twice in a 30-day period; after two fails you must wait 30 days from your first attempt.
  • Drainage, waste and vents is 25 of the 100 questions.

Frequently asked questions

What's on the New Mexico MM-1 plumbing exam?

PSI's outline, 100 questions: Drainage, Waste, and Vents 25; Water Supply Systems 10; Backflow Prevention 9; Storm Drainage Systems 6; Plumbing Fixtures, including Water Heaters and Accessibility 10; General Knowledge and General Regulations 15; Interceptors and Traps 9; Isometric Analysis 10; Septic and Sewer 6.

Which code editions does the New Mexico exam use?

PSI's bulletin pins the editions: for electrical, the 2020 NEC plus the New Mexico Electrical Code (NMAC 14.10.4); for plumbing and gas, the 2021 UPC and UMC plus the New Mexico plumbing and mechanical codes (NMAC 14.8.2 and 14.9.2); for building, the 2021 IRC or IBC plus NMAC 14.7.3 or 14.7.2. Code questions use only the listed edition.

Who gives the New Mexico contractor and journeyman exams?

PSI, for the Construction Industries Division (CID) of the Regulation and Licensing Department. CID pre-approves your application, then you schedule with PSI at a New Mexico test center (Albuquerque, Farmington, Las Cruces, Roswell or Santa Fe) or an approved center elsewhere.

Free questions with answers

Show all 10 free questions and answers
  1. A 4-inch horizontal building drain cannot be laid at 1/4 inch per foot because of the structure's geometry. The AHJ approves a reduced slope. What is the least slope the UPC allows for this pipe?

    Answer: 1/8 inch per foot

    UPC 708.1 allows pipe 4 inches or larger to be laid at not less than 1/8 inch per foot only where a 1/4 inch slope is impractical and the AHJ approves. 1/16 inch per foot is below the minimum for any size. Adding a cleanout does not change the slope requirement.

    Reference: 2021 Uniform Plumbing Code, 708.1

  2. A new potable water system is being disinfected using the UPC method with chlorine. Which dose and contact time meet the code when a 24-hour period is chosen?

    Answer: At least 50 parts per million chlorine, held for 24 hours

    UPC 609.9 requires disinfection with chlorine at 50 ppm for 24 hours, or 200 ppm for 3 hours. After the contact time, the system is flushed until the residual equals the normal supply. The other combinations of strength and time do not match the section.

    Reference: 2021 Uniform Plumbing Code, 609.10

  3. How must an exterior hose bibb (sillcock) on a house be protected against backflow?

    Answer: With a hose-connection vacuum breaker (ASSE 1011) or integral breaker

    UPC 603.5.7 requires hose bibbs to have a listed backflow device (a hose-connection vacuum breaker, ASSE 1011, or an integral type) because a hose left in a bucket or pool can be a cross-connection. A gate valve only isolates the line, and a PRV or swing check does not prevent backsiphonage.

    Reference: 2021 Uniform Plumbing Code, 603.5.7

  4. Rain falls on a pitched roof. Which area is used to size roof drains and leaders for that roof?

    Answer: The horizontal projection of the roof area

    Rain falls vertically, so the catchment is the horizontal projection of the roof, not the longer sloped surface. Storm drainage sizing in the UPC uses horizontal projected area (with added allowance for adjacent walls that shed water onto the roof). Walls alone or the attic footprint do not determine the load.

    Reference: 2021 Uniform Plumbing Code, General trade practice: UPC Chapter 11 and Appendix D sizing

  5. How many compartments must a septic tank have under New Mexico's liquid waste rules, and how is the capacity divided?

    Answer: At least two compartments, with the inlet compartment holding two-thirds of the total liquid capacity

    NMAC 20.7.3.502(B) requires septic tanks to have a minimum of two compartments, with the inlet compartment 2/3 of total liquid capacity (and not less than 500 gallons) and the second compartment 1/3. Equal halves or thirds do not match the rule.

    Reference: NMAC 20.7.3 (Liquid Waste Disposal and Treatment), 20.7.3.502(B)

  6. What is the maximum vertical distance permitted from a lavatory's waste outlet down to the weir of its trap?

    Answer: 24 inches

    UPC 1001.2 limits the vertical distance between a fixture outlet and the trap weir to 24 inches. A longer drop gives the water a long free fall and promotes siphonage of the seal. Twelve inches is more restrictive than the code, and 36 and 48 exceed it.

    Reference: 2021 Uniform Plumbing Code, 1001.2

  7. An isometric shows a 2-inch drain with a 45-degree offset that moves the line over 12 inches. About how long is the pipe between the two 45-degree fittings (center to center)? (Travel = offset x 1.414.)

    Answer: 17 inches

    For a 45-degree offset the travel (the diagonal piece) is the offset times 1.414: 12 x 1.414 = 16.97, about 17 inches. 12 inches ignores the diagonal, 24 inches doubles the offset, and 8-1/2 inches divides instead of multiplying. Fitting take-off then reduces the cut length.

    Reference: 2021 Uniform Plumbing Code, General trade practice: 45-degree offset travel

  8. A contractor lays out a site-built shower compartment. What minimum interior floor area does the UPC require?

    Answer: 1,024 square inches that can hold a 30-inch circle

    UPC 408.6 requires a shower compartment to have a finished interior of at least 1,024 square inches and to be capable of encompassing a 30-inch circle. The other options are not UPC values.

    Reference: 2021 Uniform Plumbing Code, 408.6

  9. What percentage of grade does a drain with a slope of 1/4 inch per foot represent (rounded)?

    Answer: About 2 percent

    Percent grade = rise/run x 100 = (0.25 in / 12 in) x 100 = 2.08, about 2 percent. Four percent would be 1/2 inch per foot. The NM septic rule also lists 1/4 inch per foot as 2%.

    Reference: 2021 Uniform Plumbing Code, General trade practice: slope conversion

  10. What must be marked on plumbing pipe, fittings and fixtures under the UPC?

    Answer: The maker's name or mark and the standard met

    UPC 301.2.1 requires each pipe, fitting, trap, fixture, material and device used in a plumbing system to be marked with the manufacturer's name or trademark and the standard to which it is made, so the inspector can verify approval.

    Reference: 2021 Uniform Plumbing Code, 301.2.1

Sources

Questions last verified November 2, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.