New Mexico licensing exam

New Mexico Journeyman Pipe Fitter Exam: Practice Test & Licensing Guide

New Mexico's journeyman pipe fitter exam (JPF): 50 questions on general knowledge, piping assembly and installation, and pipe welding, from the 2021 UMC and the Pipe Trades Handbook. Open book, 75% to pass.

Questions
50
Time limit
2 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Knowledge

A steel line must jog over by 18 inches using two 45° elbows. Using the standard 45° offset constant of 1.414, what is the center-to-center travel between the two elbows (to the nearest 1/16 inch)?

Requirements at a glance

AgencyNew Mexico Regulation and Licensing Department, Construction Industries Division (CID); exams by PSI
Exam50 questions, 120 minutes, 75% to pass, open book
Books allowed2021 UMC, NMAC 14.9.2 and 14.8.2, and IPT's Pipe Trades Handbook (2016)
FeesExam fees are paid to PSI (see the exam details above); license fees are separate. Check CID for current license fees.
TimingTest within 6 months of becoming eligible. The exam fee and a passing score are each valid for 1 year.

Pipe fitters applying to Construction Industries Division for a journeyman pipe fitter certificate.

How to get licensed, step by step

  1. Apply to CID through PSI

    Candidates must be pre-approved before they can schedule. Submit your application and proof of qualifications through PSI's New Mexico construction page, or call PSI's approvals line at 877-663-9267.

    PSI: apply and schedule New Mexico exams (opens in a new tab)New Mexico Construction Industries Division (CID) (opens in a new tab)

  2. Get your references

    Buy the exact code editions in PSI's bulletin. Books must be bound; highlighting, underlining and permanent tabs are allowed, but no loose notes or Post-its.

    PSI Journeyman Candidate Information Bulletin (opens in a new tab)New Mexico Administrative Code (NMAC) titles (opens in a new tab)

  3. Schedule and pay PSI

    After approval, contact PSI to schedule a seat and pay. Test sites include Albuquerque, Farmington, Las Cruces, Roswell and Santa Fe.

    PSI: apply and schedule New Mexico exams (opens in a new tab)

  4. Pass and finish your license

    You need 75%. You may not take the same exam more than twice in 30 days. Contractors also need the Business and Law exam; journeyman candidates take a hands-on practical exam too.

    New Mexico Construction Industries Division (CID) (opens in a new tab)PSI Journeyman Candidate Information Bulletin (opens in a new tab)

How to prepare

  • General knowledge (22) and piping, assembly and installation (21) are most of the exam; the Pipe Trades Handbook covers pipe math, fittings, offsets and supports.
  • Pipe welding is 7 questions. PSI lists no separate welding text, so expect trade-knowledge questions and use the handbook for reference.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Uniform Mechanical Code (UMC), 2021 (IAPMO)

    Gas piping, combustion air and venting for the gas fitter exams; the main code for MM-3 HVAC and pipe fitter; the plumbing exams list it too.

    IAPMO (opens in a new tab)

  • IPT's Pipe Trades Handbook, Robert A. Lee, 2016

    Listed as an allowed reference for the plumbing, gas fitter, HVAC and pipe fitter exams.

Official reference list (as published by the testing agency)
  • Uniform Mechanical Code (UMC), 2021 (IAPMO)
  • New Mexico Mechanical Code (NMAC 14.9.2)
  • New Mexico Plumbing Code (NMAC 14.8.2)
  • IPT's Pipe Trades Handbook, Robert A. Lee, 2016

What's on the exam

Official content outline from PSI, (number of questions per topic):

TopicQuestions
General Knowledge22
Piping, Assembly and Installation21
Pipe Welding7

Exam day details

  • Administered by PSI, for the New Mexico Regulation and Licensing Department, Construction Industries Division (CID).
  • Fee: $68.88 per exam, paid to PSI. License and application fees are separate.
  • 50 questions in 120 minutes; 75% to pass (38 points).
  • Open book. Bring bound references; you may highlight, underline and index them with permanent tabs only. No loose papers, notes or Post-it tabs, and no writing in the books.
  • PSI's journeyman bulletin lists no practical exam for the pipe fitter certificate.
  • Get CID pre-approval through PSI first (PSI approvals line 877-663-9267). Once you are eligible you must test within 6 months, or reapply with the Division. Your exam fee is valid for 1 year and a passing score is valid for 1 year.
  • You may not take the same exam more than twice in a 30-day period; after two fails you must wait 30 days from your first attempt.
  • General knowledge (22) and piping, assembly and installation (21) are 43 of the 50 questions; pipe welding is 7.

Frequently asked questions

What's on the New Mexico journeyman pipe fitter exam?

PSI's outline, 50 questions: General Knowledge 22; Piping, Assembly and Installation 21; Pipe Welding 7.

Which books can I bring to the pipe fitter exam?

PSI lists the 2021 Uniform Mechanical Code, the New Mexico mechanical and plumbing codes (NMAC 14.9.2 and 14.8.2) and IPT's Pipe Trades Handbook (Lee, 2016). It is open book.

Who gives the New Mexico contractor and journeyman exams?

PSI, for the Construction Industries Division (CID) of the Regulation and Licensing Department. CID pre-approves your application, then you schedule with PSI at a New Mexico test center (Albuquerque, Farmington, Las Cruces, Roswell or Santa Fe) or an approved center elsewhere.

Free questions with answers

Show all 10 free questions and answers
  1. A steel line must jog over by 18 inches using two 45° elbows. Using the standard 45° offset constant of 1.414, what is the center-to-center travel between the two elbows (to the nearest 1/16 inch)?

    Answer: 25-7/16 inches

    For 45° fittings, travel = offset x 1.414. 18 x 1.414 = 25.45 in., about 25-7/16 in. Dividing by 1.414 instead of multiplying gives 12.73 in., and 1.732 is not the 45° constant (18 x 1.732 = 31.18 in.). The travel can never equal the offset unless the fittings are 90°.

    Reference: IPT's Pipe Trades Handbook (Lee, 2016), Pipe fitting math: offset constants for 45° fittings

  2. A rolling offset has a roll of 12 inches and a set (rise) of 16 inches. What is the true offset that the fittings must make up?

    Answer: 20 inches

    The roll and set are at right angles, so the true offset is the hypotenuse: sqrt(12² + 16²) = sqrt(144 + 256) = sqrt(400) = 20 in. Adding the two sides (28 in.) ignores the right-triangle relationship; 14 in. is just their average. The travel is then found by multiplying the true offset by the fitting constant.

    Reference: IPT's Pipe Trades Handbook (Lee, 2016), Pipe fitting math: rolling offsets (true offset)

  3. Under the UMC, how long must the test pressure on new hydronic system piping be held with no perceptible drop?

    Answer: At least 30 minutes

    UMC 1205.2 requires the test pressure to be held for not less than 30 minutes with no perceptible drop, in the presence of the Authority Having Jurisdiction. New Mexico's amendment (NMAC 14.9.2.20) replaces only the first sentence (the pressure), so the 30-minute hold still applies. 15 minutes is a common gas-piping figure, not the hydronic rule.

    Reference: 2021 Uniform Mechanical Code, Section 1205.2

  4. A fitter is testing a new PEX radiant floor loop installed under the UMC. Which test medium is NOT permitted for this piping?

    Answer: Air

    UMC 1205.2 allows hydronic piping to be tested with water or air, except that plastic pipe shall not be tested with air. PEX is plastic, so an air test is prohibited; stored energy in compressed air makes a plastic failure dangerous. New Mexico's amendment changes only the test pressure sentence, not this restriction.

    Reference: 2021 Uniform Mechanical Code, Section 1205.2

  5. Using UMC Table 313.6, what is the minimum hanger rod size for a 6-inch steel pipe?

    Answer: 1/2 inch

    Table 313.6 sets minimum rod sizes by pipe size: 1/2 to 4 in. pipe, 3/8 in. rod; 5 to 8 in. pipe, 1/2 in. rod; 10 to 12 in. pipe, 5/8 in. rod. A 6-inch pipe falls in the 5 to 8 in. row, so 1/2 in. 3/8 in. is the row for 4 in. and smaller, and 5/8 in. starts at 10 in.

    Reference: 2021 Uniform Mechanical Code, Table 313.6

  6. On a construction site, oxygen cylinders in storage must be kept apart from acetylene cylinders. Which arrangement meets 29 CFR 1926.350?

    Answer: At least 20 feet apart, or a noncombustible barrier at least 5 feet high rated at least 1/2 hour

    29 CFR 1926.350(a)(10) requires stored oxygen cylinders to be separated from fuel-gas cylinders or combustibles (especially oil or grease) by at least 20 feet, or by a noncombustible barrier at least 5 feet high with a fire-resistance rating of at least one-half hour. The other distances and barrier ratings are not in the rule.

    Reference: OSHA Safety and Health Regulations for Construction (29 CFR 1926), 29 CFR 1926.350(a)(10)

  7. A relief-valve discharge pipe on a hydronic boiler is run outside the building. Under the UMC, where must the end of the pipe terminate?

    Answer: Not more than 2 feet and not less than 6 inches above the ground, pointing down

    UMC 1206.2(3) lets the full-size discharge go by gravity through an air gap into the drainage system or outside, with the end of the pipe not more than 2 feet and not less than 6 inches above the ground and pointing downward. The discharge line may have no valves, obstructions or caps (1206.2), so a capped end or a roof termination is not allowed.

    Reference: 2021 Uniform Mechanical Code, Section 1206.2

  8. In pipe welding test positions, what does the 6G position describe?

    Answer: Pipe fixed with its axis inclined at 45° and not rotated

    6G is the pipe fixed at a 45° incline, so the welder goes through flat, vertical, horizontal and overhead in one joint; it is the most demanding position. 1G is horizontal and rolled, 2G is a vertical pipe axis with a horizontal weld, and 5G is horizontal fixed.

    Reference: Pipe welding practice, Pipe welding positions (1G, 2G, 5G, 6G)

  9. Snow and ice melt tubing is to be embedded in an 8-inch-thick structural concrete slab. Under the UMC, what is the largest tube outside dimension allowed?

    Answer: About 2.67 inches (one-third of the slab thickness)

    UMC 1220.4.2 limits tubes in a structural slab to an outside dimension no larger than one-third of the overall slab thickness: 8 / 3 = 2.67 inches. The same section requires at least 2 inches of concrete over the top of the tubing, which is a cover rule, not a size limit. One-half and one-sixth are not fractions used in the section.

    Reference: 2021 Uniform Mechanical Code, Section 1220.4.2

  10. So that it can be closed quickly in an emergency, how far may the valve on a fuel gas cylinder be opened under OSHA construction rules?

    Answer: No more than 1-1/2 turns

    29 CFR 1926.350(d)(2) requires cylinder valves to be opened slowly and, for quick closing, fuel gas cylinder valves shall not be opened more than 1-1/2 turns; a special wrench, where needed, stays on the valve stem. Fully open then backed off is the common practice for oxygen, not fuel gas. 1/2 and 3 turns are not the OSHA figure.

    Reference: OSHA Safety and Health Regulations for Construction (29 CFR 1926), 29 CFR 1926.350(d)(2)

Sources

Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.