New Mexico GB-98 General Building Contractor Exam: Practice Test & Licensing Guide

New Mexico's GB-98 general building contractor exam, two parts: Part 1 (GB-2 residential, 80 questions) and Part 2 (commercial, 100 questions) on concrete, masonry, metals, plan reading and OSHA. Open book, 75% on each part.

Questions
180
Time limit
8.916666666666666 hours
Passing score
75% per part

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Sitework, Footings, and Foundations

A 8-foot-deep trench with a 4-foot-wide bottom is cut in Type C soil and the sides are sloped at the maximum allowed slope of 1-1/2 horizontal to 1 vertical on both sides. What is the width of the trench at the top?

Requirements at a glance

AgencyNew Mexico Regulation and Licensing Department, Construction Industries Division (CID); exams by PSI
ExamPart 1: 80 questions, 225 minutes. Part 2: 100 questions, 310 minutes. 75% on each part, open book
Books allowedNMAC 14.7.2 and the 2021 IBC (Part 2), NMAC 14.7.3 and the 2021 IRC (Part 1), plus the listed commercial construction, concrete, steel and OSHA references
FeesExam fees are paid to PSI (see the exam details above); license fees are separate. Check CID for current license fees.
TimingTest within 6 months of becoming eligible. The exam fee and a passing score are each valid for 1 year.

Contractors applying to Construction Industries Division for a GB-98 general building (commercial) license. You must pass both parts; if you fail one, you retake only that part.

How to get licensed, step by step

  1. Apply to CID through PSI

    Candidates must be pre-approved before they can schedule. Submit your application and proof of qualifications through PSI's New Mexico construction page, or call PSI's approvals line at 877-663-9267.

    PSI: apply and schedule New Mexico exams (opens in a new tab)New Mexico Construction Industries Division (CID) (opens in a new tab)

  2. Get your references

    Buy the exact code editions in PSI's bulletin. Books must be bound; highlighting, underlining and permanent tabs are allowed, but no loose notes or Post-its.

    PSI Contractor Candidate Information Bulletin (opens in a new tab)New Mexico Administrative Code (NMAC) titles (opens in a new tab)

  3. Schedule and pay PSI

    After approval, contact PSI to schedule a seat and pay. Test sites include Albuquerque, Farmington, Las Cruces, Roswell and Santa Fe.

    PSI: apply and schedule New Mexico exams (opens in a new tab)

  4. Pass and finish your license

    You need 75%. You may not take the same exam more than twice in 30 days. Contractors also need the Business and Law exam; journeyman candidates take a hands-on practical exam too.

    New Mexico Construction Industries Division (CID) (opens in a new tab)PSI Contractor Candidate Information Bulletin (opens in a new tab)

How to prepare

  • Part 1 is the GB-2 exam. Part 2 adds metals, precast and post-tensioned concrete and steel deck and joist topics.
  • General code, plan reading and estimating is 27 of the 100 Part 2 questions; know IBC occupancy, construction type and egress tables.
  • You must pass both parts; if you fail one, you retake only that part.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IBC and the 2021 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • International Building Code (IBC), 2021, with NMAC 14.7.2Essential

    Commercial building code behind GB-98 Part 2.

    ICC store (opens in a new tab)

  • International Residential Code (IRC), 2021, with NMAC 14.7.3Essential

    Residential building code behind GB-2 and GB-98 Part 1.

    ICC store (opens in a new tab)

  • 29 CFR Part 1926 (OSHA construction standards)

    Listed for the building exams' OSHA safety questions.

Official reference list (as published by the testing agency)
  • New Mexico Commercial Building Code (NMAC 14.7.2), 2021
  • International Building Code (IBC), 2021
  • New Mexico Residential Building Code (NMAC 14.7.3), 2021 and IRC 2021 (Part 1)
  • Principles and Practices of Commercial Construction, Andres and Smith, 9th Edition, 2014
  • Design and Control of Concrete Mixtures, Kosmatka and Panarese, 17th Edition, 2021
  • Placing Reinforcing Bars, 9th Edition (CRSI)
  • Gypsum Construction Handbook, 7th Edition, 2014 (USG)
  • SDI Manual of Construction with Steel Deck, 2nd Edition; Steel Joist Institute Technical Digest No. 9
  • Carpentry and Building Construction (Feirer) and Modern Masonry (Kicklighter)
  • 29 CFR Part 1926 (OSHA construction standards)

What's on the exam

Official content outline from PSI, (number of questions per topic):

TopicQuestions
Sitework, Footings, and Foundations19
Concrete and Concrete Reinforcement24
Masonry16
Carpentry18
Metals10
Roofing16
Associated Trades22
General Code, Plan Reading, and Estimating41
OSHA Safety14

The parts are timed and scored separately, and you must pass each one. Our simulations score each part the same way and give you the combined time (535 minutes).

Exam day details

  • Administered by PSI, for the New Mexico Regulation and Licensing Department, Construction Industries Division (CID).
  • Fee: $269.06 for the two-part exam, paid to PSI (retake of one part $134.53). License and application fees are separate.
  • Part 1 is 80 questions in 225 minutes (the GB-2 exam); Part 2 is 100 questions in 310 minutes. 75% to pass each part.
  • Open book. Bring bound references; you may highlight, underline and index them with permanent tabs only. No loose papers, notes or Post-it tabs, and no writing in the books.
  • Get CID pre-approval through PSI first (PSI approvals line 877-663-9267). Once you are eligible you must test within 6 months, or reapply with the Division. Your exam fee is valid for 1 year and a passing score is valid for 1 year.
  • You may not take the same exam more than twice in a 30-day period; after two fails you must wait 30 days from your first attempt.
  • You also need the Business and Law exam. General code, plan reading and estimating is 41 of the 180 questions across both parts. Metals (10) appears only in Part 2.

Frequently asked questions

What's on the New Mexico GB-98 exam?

PSI's outlines combined, 180 questions across Parts 1 and 2: Sitework, Footings, and Foundations 19; Concrete and Concrete Reinforcement 24; Masonry 16; Carpentry 18; Metals 10; Roofing 16; Associated Trades 22; General Code, Plan Reading, and Estimating 41; OSHA Safety 14.

Which code editions does the New Mexico exam use?

PSI's bulletin pins the editions: for electrical, the 2020 NEC plus the New Mexico Electrical Code (NMAC 14.10.4); for plumbing and gas, the 2021 UPC and UMC plus the New Mexico plumbing and mechanical codes (NMAC 14.8.2 and 14.9.2); for building, the 2021 IRC or IBC plus NMAC 14.7.3 or 14.7.2. Code questions use only the listed edition.

Who gives the New Mexico contractor and journeyman exams?

PSI, for the Construction Industries Division (CID) of the Regulation and Licensing Department. CID pre-approves your application, then you schedule with PSI at a New Mexico test center (Albuquerque, Farmington, Las Cruces, Roswell or Santa Fe) or an approved center elsewhere.

Free questions with answers

Show all 10 free questions and answers
  1. A 8-foot-deep trench with a 4-foot-wide bottom is cut in Type C soil and the sides are sloped at the maximum allowed slope of 1-1/2 horizontal to 1 vertical on both sides. What is the width of the trench at the top?

    Answer: 28 feet

    Appendix B, Table B-1 allows 1-1/2H:1V for Type C. Horizontal run per side = 8 ft x 1.5 = 12 ft. Top width = 4 + 12 + 12 = 28 ft. Twenty-four forgets the bottom width, 20 uses the Type B slope of 1:1, and 16 uses the Type A slope of 3/4:1.

    Reference: 29 CFR 1926, Subpart P, Appendix B, Table B-1

  2. For a given cement content and aggregate, what happens to hardened concrete when the water-cement ratio is increased?

    Answer: Strength and durability decrease and permeability increases

    Strength and durability depend mainly on the water-cementitious materials ratio: more water per unit of cement makes a more porous paste that is weaker and more permeable. Extra water improves workability only, and it does not help hydration beyond what the cement can use.

    Reference: Design and Control of Concrete Mixtures, 17th Edition (PCA), Proportioning (water-cementitious materials ratio)

  3. A slump test on fresh concrete (ASTM C143) is used to check what property?

    Answer: Consistency, or how stiff or fluid the mix is

    The slump cone measures consistency: the cone is filled in three layers, rodded, lifted, and the drop in height of the concrete is measured. It does not measure strength (cylinders do), air content (pressure or volumetric meters do) or temperature (a thermometer does).

    Reference: Design and Control of Concrete Mixtures, 17th Edition (PCA), Testing and Inspecting Concrete (slump test)

  4. Of the ASTM C270 mortar types M, S, N and O, which has the highest compressive strength and is often specified for below-grade walls and retaining walls?

    Answer: Type M

    Mortar types in descending order of compressive strength are M, S, N and O (and K at the bottom). Type M is used where high strength and durability are needed, such as foundations, retaining walls and other masonry in contact with soil. IBC 2103.2.1 requires masonry mortar to conform to TMS 602.

    Reference: 2021 International Building Code, Section 2103.2.1

  5. What maximum riser height and minimum tread depth apply to stairs in a one-family dwelling under the New Mexico Residential Building Code amendments to IRC R311.7.5?

    Answer: 8 inches maximum riser and 9 inches minimum tread

    NMAC 14.7.3 deletes IRC R311.7.5.1 and R311.7.5.2 and substitutes a riser not more than 8 inches and a tread not less than 9 inches, with the largest riser or tread within a flight not exceeding the smallest by more than 3/8 inch. The unamended 2021 IRC gives 7-3/4 and 10 inches, and the IBC gives 7 and 11 inches.

    Reference: New Mexico Residential Building Code (NMAC 14.7.3), amending the 2021 IRC, NMAC 14.7.3, Sections R311.7.5.1 and R311.7.5.2

  6. What is the minimum number of anchor rods (anchor bolts) that every column base plate must have under OSHA's steel erection rules?

    Answer: Four

    29 CFR 1926.755(a)(1) requires every column to be anchored by a minimum of four anchor rods (anchor bolts). The anchor rods also have to be checked as part of the column's stability; erection may not begin until the concrete has reached the required strength under 1926.752(c).

    Reference: 29 CFR 1926, 1926.755(a)(1)

  7. What is the minimum roof slope for asphalt shingles under the 2021 IBC, and what extra is required between that slope and 4:12?

    Answer: 2 units vertical in 12 horizontal, with double underlayment between 2:12 and 4:12

    IBC 1507.2.2 permits asphalt shingles only on slopes of 2:12 or greater, and for slopes from 2:12 up to 4:12 a double underlayment application is required under 1507.1.1. At 4:12 and steeper one layer of underlayment is enough. Below 2:12 a low-slope membrane system must be used.

    Reference: 2021 International Building Code, Section 1507.2.2

  8. A fixed glass sidelite stands next to a swinging door. Under IBC 2406.4.2, when must that glazing be safety glazing?

    Answer: When its nearest vertical edge is within a 24-inch arc of the door edge and its bottom edge is less than 60 inches above the walking surface

    IBC 2406.4.2 treats glazing adjacent to a door as a hazardous location when the nearest vertical edge is within a 24-inch arc of the door's vertical edge in the closed position and the bottom edge is less than 60 inches above the walking surface. The 9-square-foot, 18-inch and 36-inch conditions describe large windows in 2406.4.3.

    Reference: 2021 International Building Code, Section 2406.4.2

  9. A supported scaffold must be able to support its own weight and at least how many times the maximum intended load?

    Answer: 4 times

    29 CFR 1926.451(a)(1) requires each scaffold and its components to support, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it. Suspension ropes have a higher requirement of 6 times the intended load.

    Reference: 29 CFR 1926, 1926.451(a)(1)

  10. A banquet room has 3,000 square feet of net floor area, set up with tables and chairs (unconcentrated assembly use). What occupant load applies under IBC Table 1004.5?

    Answer: 200 occupants

    Assembly without fixed seats and unconcentrated (tables and chairs) uses 15 square feet net per occupant: 3,000 / 15 = 200. The 429 figure uses the concentrated 7 sq ft factor (3,000 / 7), and 300 would come from 10 sq ft per person. Concentrated, chairs-only seating would give the larger load.

    Reference: 2021 International Building Code, Table 1004.5

Sources

Questions last verified November 2, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.