New Mexico licensing exam

New Mexico Business and Law Exam: Practice Test & Licensing Guide

New Mexico's required Business and Law exam for contractors: 50 questions on licensing, bidding, contracts, taxes, labor law, liens and risk, from the NASCLA guide and state law. Open book, 75% to pass.

Questions
50
Time limit
2.1666666666666665 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Licensing Requirements

A 17-year-old owns 60 percent of a new LLC that wants a New Mexico contractor license. What is the result under the CID license rule?

Requirements at a glance

AgencyNew Mexico Regulation and Licensing Department, Construction Industries Division (CID); exams by PSI
Exam50 questions, 130 minutes, 75% to pass, open book
Books allowedNASCLA Contractors Guide to Business, Law and Project Management (Basic, 14th ed.), the NM Construction Industries Licensing Act (NMSA 60-13) and NMAC 14.6.3
FeesExam fees are paid to PSI (see the exam details above); license fees are separate. Check CID for current license fees.
TimingTest within 6 months of becoming eligible. The exam fee and a passing score are each valid for 1 year.

Every new New Mexico contractor candidate (GB-2, GB-98, EE-98, MM and other trade classifications). You must pass it within 1 year of passing your trade exam, or take an approved Business and Law course instead.

How to get licensed, step by step

  1. Apply to CID through PSI

    Candidates must be pre-approved before they can schedule. Submit your application and proof of qualifications through PSI's New Mexico construction page, or call PSI's approvals line at 877-663-9267.

    PSI: apply and schedule New Mexico exams (opens in a new tab)New Mexico Construction Industries Division (CID) (opens in a new tab)

  2. Get your references

    Buy the exact code editions in PSI's bulletin. Books must be bound; highlighting, underlining and permanent tabs are allowed, but no loose notes or Post-its.

    PSI Contractor Candidate Information Bulletin (opens in a new tab)New Mexico Administrative Code (NMAC) titles (opens in a new tab)

  3. Schedule and pay PSI

    After approval, contact PSI to schedule a seat and pay. Test sites include Albuquerque, Farmington, Las Cruces, Roswell and Santa Fe.

    PSI: apply and schedule New Mexico exams (opens in a new tab)

  4. Pass and finish your license

    You need 75%. You may not take the same exam more than twice in 30 days. Contractors also need the Business and Law exam; journeyman candidates take a hands-on practical exam too.

    New Mexico Construction Industries Division (CID) (opens in a new tab)PSI Contractor Candidate Information Bulletin (opens in a new tab)

How to prepare

  • Licensing requirements, business organization and financial management, and contracts are 8 questions each: nearly half the exam.
  • Tab the NASCLA chapters on liens, contracts and taxes, and know where the Licensing Act and NMAC 14.6.3 sit.
  • If you pass your trade exam but fail Business and Law, you must pass Business and Law within 1 year of the trade pass date.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NASCLA guide. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th EditionEssential

    The main text for the Business and Law exam.

    NASCLA (opens in a new tab)

Official reference list (as published by the testing agency)
  • NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th Edition
  • New Mexico Construction Industries Licensing Act (NMSA Chapter 60, Article 13)
  • New Mexico Contractor's License Requirement (NMAC 14.6.3)

What's on the exam

Official content outline from PSI, (number of questions per topic):

TopicQuestions
Licensing Requirements8
Estimating and Bidding5
Business Organization and Financial Management8
Tax Laws5
Labor Laws4
Project Management and Lien Law5
Contracts8
Risk Management4
Environmental and Safety3

Exam day details

  • Administered by PSI, for the New Mexico Regulation and Licensing Department, Construction Industries Division (CID).
  • Fee: $68.88 per exam, paid to PSI. License and application fees are separate.
  • 50 questions in 130 minutes; 75% to pass (38 points).
  • Open book. Bring bound references; you may highlight, underline and index them with permanent tabs only. No loose papers, notes or Post-it tabs, and no writing in the books.
  • Get CID pre-approval through PSI first (PSI approvals line 877-663-9267). Once you are eligible you must test within 6 months, or reapply with the Division. Your exam fee is valid for 1 year and a passing score is valid for 1 year.
  • You may not take the same exam more than twice in a 30-day period; after two fails you must wait 30 days from your first attempt.
  • Licensing requirements (8), business organization and financial management (8) and contracts (8) are nearly half the exam.

Frequently asked questions

What's on the New Mexico Business and Law exam?

PSI's outline, 50 questions: Licensing Requirements 8; Estimating and Bidding 5; Business Organization and Financial Management 8; Tax Laws 5; Labor Laws 4; Project Management and Lien Law 5; Contracts 8; Risk Management 4; Environmental and Safety 3.

Who gives the New Mexico contractor and journeyman exams?

PSI, for the Construction Industries Division (CID) of the Regulation and Licensing Department. CID pre-approves your application, then you schedule with PSI at a New Mexico test center (Albuquerque, Farmington, Las Cruces, Roswell or Santa Fe) or an approved center elsewhere.

Can I skip the Business and Law exam?

Not by default. PSI's bulletin says you must pass the Business and Law exam or take an approved Business and Law course. If you pass your trade exam but fail Business and Law, you must pass Business and Law within 1 year of the trade pass date.

Free questions with answers

Show all 10 free questions and answers
  1. A 17-year-old owns 60 percent of a new LLC that wants a New Mexico contractor license. What is the result under the CID license rule?

    Answer: The entity is ineligible because a majority owner is 17 or younger

    A business entity, the majority of which is owned by an individual 17 years of age or younger, is not eligible for licensure. A separate adult qualifying party does not cure the ownership problem, and the rule contains no co-signer or waiting-period exception.

    Reference: New Mexico Contractor's License Requirement, NMAC 14.6.3, 14.6.3.8(A)(2)

  2. A contractor marks up all job costs by 40 percent. What gross profit margin on selling price does that produce, rounded to the nearest whole percent?

    Answer: 29 percent

    For a $100 cost, a 40 percent markup gives a $140 price and $40 profit. Margin = $40 / $140 = 28.6 percent, about 29 percent. Margin on price is always lower than markup on cost.

    Reference: General construction business practice (NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th ed.), Markup on cost versus margin on selling price

  3. Which set of factors does the IRS use to decide whether a worker is an employee or an independent contractor?

    Answer: Behavioral control, financial control and the type of relationship

    IRS common-law guidance groups the evidence into behavioral control, financial control and the relationship of the parties. Misclassifying employees as contractors can cost the business back payroll taxes and penalties.

    Reference: IRS Publication 15-A, Employer's Supplemental Tax Guide, Section 2, Who Are Employees

  4. What is the main disadvantage of operating a contracting business as a sole proprietorship?

    Answer: The owner is personally liable for all business debts and claims

    A sole proprietorship is not a separate legal entity, so the owner's personal assets are exposed to business debts, judgments and claims. Profits are reported on the owner's own return, which is a tax advantage rather than a drawback.

    Reference: General construction business practice (NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th ed.), Forms of business organization: sole proprietorship

  5. A contractor's current assets are $420,000 and current liabilities are $280,000. What is the current ratio?

    Answer: 1.5

    Current ratio = current assets / current liabilities = $420,000 / $280,000 = 1.5. Inverting the fraction gives 0.67. A ratio above 1.0 means the company can cover its short-term obligations from short-term assets.

    Reference: General construction business practice (NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th ed.), Financial ratios: current ratio

  6. A non-exempt carpenter earns $26.00 per hour and works 46 hours in one workweek. Under the FLSA, what is the gross pay for the week?

    Answer: $1,274.00

    Regular pay is 40 x $26.00 = $1,040. Overtime is 6 hours at 1.5 x $26.00 = $39.00 per hour = $234. Total = $1,274.00. $1,196.00 pays all 46 hours at straight time, and $1,326.00 pays all 6 extra hours at double time (2 x $26 = $52).

    Reference: Fair Labor Standards Act, 29 U.S.C., Section 207(a)(1)

  7. What does a mechanics' lien give an unpaid contractor, subcontractor or supplier?

    Answer: A claim against the improved property, enforceable to collect payment

    A mechanics' lien is a statutory security interest in the real property that was improved. If the claim is not paid, the claimant may foreclose the lien to collect. It is not a claim on unrelated assets, and the surety on a payment bond is a separate remedy.

    Reference: General construction business practice (NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th ed.), Lien law: purpose of a mechanics' lien

  8. What is a change order?

    Answer: A written amendment adjusting the scope, price or time of the contract

    A change order is the signed document that formally changes the contract sum, time or work. Doing extra work on a verbal request without one is a common source of unpaid claims. A request to clarify the drawings is an RFI, not a change order.

    Reference: General construction business practice (NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th ed.), Change orders

  9. A contractor's experience modification rate (EMR) for workers' compensation is 0.85. What does this indicate?

    Answer: Better-than-average claims history, with discounted premiums

    An EMR of 1.00 is average. Below 1.00 means fewer or smaller losses than expected for its class and a premium credit (about 15 percent here). Above 1.00 means worse-than-average experience and a surcharge.

    Reference: General construction business practice (NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th ed.), Insurance: workers' compensation experience modification

  10. At what depth or greater does an excavation generally require a protective system such as sloping, shoring or a shield?

    Answer: 5 feet

    Protective systems are required for excavations 5 feet deep or more, unless the excavation is made entirely in stable rock. A competent person must still inspect excavations, and a trench 4 feet or deeper needs a means of egress within 25 feet of workers.

    Reference: Safety and Health Regulations for Construction, 29 CFR Part 1926, Section 1926.652(a)(1)

Sources

Questions last verified November 2, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.