Requirements at a glance
| Who requires it | Class B contractor licenses in Denver, PPRBD, Larimer, Jefferson and Boulder counties, Aurora and Fort Collins |
|---|---|
| Exam | 80 questions, 4 hours, open book |
| Books allowed | 2021 IBC, 2021 IRC and ICC's Concrete Manual |
| Fee | $120 per attempt (Pearson VUE), plus your jurisdiction's license fee |
Class B general contractor qualifiers (commercial buildings up to a set height or area, and residential) in jurisdictions that use ICC exams, such as Denver, PPRBD, Larimer, Jefferson and Boulder counties, Aurora and Fort Collins.
Official links
How to get certified, step by step
Check your jurisdiction's requirement
Find your license class on your city or county's contractor page and note the exact ICC exam ID. The letter shows the code year (G = 2018, T = 2021), and from December 1, 2026 the T-series ID also shows whether you need 70% or 75%.
Denver: contractor licenses and supervisor certificates (opens in a new tab)Pikes Peak Regional Building Department: contractor licensing (opens in a new tab)
Register with ICC
Create an ICC account, buy the exam from ICC's catalog, then schedule with Pearson VUE at a test center or online.
Bring the right code books
Open book: 2021 IBC, 2021 IRC and ICC's Concrete Manual. Tabs and highlighting are allowed; loose notes aren't.
ICC 2021 National Contractor/Trades bulletin (PDF) (opens in a new tab)
Pass and apply
Results are immediate. Submit your passing score with your license application, insurance and fees. If you fail, wait 10 days to retake.
How to prepare
- Tab your code book by chapter before exam day; most questions are lookups, and 4 hours goes fast.
- Expect to switch between the IBC and IRC; tab both.
- The trade-systems section covers mechanical, plumbing and electrical basics in the IRC.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2021 IBC and the 2021 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 International Building Code (IBC)Essential
The main reference for exams 11 and 12.
ICC store (opens in a new tab)Read free (opens in a new tab)
2021 International Residential Code (IRC)Essential
The reference for exam 13 and part of exam 12.
ICC store (opens in a new tab)Read free (opens in a new tab)
Concrete Manual: Concrete Quality and Field Practices (based on the 2021 IBC and ACI 318-19)
Allowed for exams 11 and 12: mix design, placing, curing, testing and inspection.
Official reference list (as published by the testing agency)
- International Building Code (IBC), 2021
- International Residential Code (IRC), 2021
- Concrete Manual: Concrete Quality and Field Practices, based on the 2021 IBC and ACI 318-19 (ICC)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Permits and General Regulations | 15 | |
| Building Planning and Life Safety | 35 | |
| Structural Systems | 35 | |
| Building Envelope | 15 | |
| Trade Systems | 10 |
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE.
- Fee: $120 per attempt (Pearson VUE). Your city or county license fee is separate.
- 80 multiple-choice questions in 4 hours, open book.
- ICC's 2021 outline lists these five areas but its percentages add up to 110%, so our topic mix is scaled from them.
- Exam IDs show the code year: F = 2015 codes (retired December 1, 2026), G = 2018, T = 2021. Our questions use the 2021 codes; check which edition your jurisdiction requires.
- From December 1, 2026 the 2021 (T-series) exams come in 70% and 75% passing versions, and each jurisdiction picks one. ICC has historically used a scaled 75.
- Open book: bring the listed references. Four-option multiple choice, no penalty for guessing. Results are immediate, and you wait 10 days to retake.
Frequently asked questions
What's the difference between the ICC 11 and 12 exams?
Exam 12 (Class B) uses both the IBC and the IRC and adds a trade-systems section (mechanical, electrical and plumbing). Exam 11 (Class A) is IBC only and covers larger commercial buildings.
Which code edition should I study?
The one your jurisdiction lists: T12 (2021 codes) or G12 (2018 codes). F12 (2015) retires December 1, 2026. Our questions use the 2021 IBC and IRC.
Free questions with answers
Show all 10 free questions and answers
You filed a permit application for a small office building 170 days ago, but the owner has not responded to plan-review comments. Under IBC Section 105.3.2, what happens if nothing changes, and what extension can the building official grant?
Answer: It is abandoned at 180 days; extensions of up to 90 days each may be granted
IBC Section 105.3.2 deems an application abandoned 180 days after filing unless it has been pursued in good faith or a permit has been issued. The building official may grant one or more extensions of not more than 90 days each, requested in writing with justifiable cause shown. The 180-day extension figure belongs to issued permits under Section 105.5, not to applications.
Reference: 2021 International Building Code, Section 105.3.2
A restaurant dining room has 3,150 sq ft of net floor area furnished with loose tables and chairs. Using IBC Table 1004.5, what is the occupant load of the dining room?
Answer: 210 occupants
Table 1004.5 assigns assembly without fixed seats, unconcentrated (tables and chairs), 15 sq ft net per occupant: 3,150 / 15 = 210 occupants. Using the concentrated (chairs only) factor of 7 net gives 450, and the standing-space factor of 5 net gives 630. The 53 result comes from wrongly using the mercantile factor of 60 gross (3,150 / 60 = 52.5, rounded up).
Reference: 2021 International Building Code, Table 1004.5
A wood-framed Type VB office building (Group B) will have an NFPA 13 sprinkler system throughout. Using IBC Table 504.3, what is its maximum allowable height above grade plane?
Answer: 60 feet
Table 504.3 gives Groups A, B, E, F, M, S and U in Type VB a height of 40 feet nonsprinklered (NS) and 60 feet sprinklered (S). 50 feet and 70 feet are the NS and S values for Type VA. The sprinkler increase is already built into the S row; don't add another 20 feet.
Reference: 2021 International Building Code, Table 504.3
A second-floor bedroom has a casement window as its emergency escape and rescue opening. In normal operation it opens to a net clear width of 22 inches and a net clear height of 34 inches, with the sill 40 inches above the floor. Does it meet IRC Section R310.2?
Answer: No; the net clear opening is only about 5.19 sq ft
Net clear area = 22 x 34 = 748 sq in; 748 / 144 = 5.19 sq ft. Section R310.2.1 requires at least 5.7 sq ft; only grade-floor openings may use 5.0 sq ft. The dimensions pass Section R310.2.2 (24-inch minimum height, 20-inch minimum width), and the 40-inch sill passes the 44-inch maximum in Section R310.2.3. Meeting each dimension does not guarantee the area. The 24-inch figure is the minimum height, not width.
Reference: 2021 International Residential Code, Sections R310.2.1 through R310.2.3
A column in a one-story commercial building delivers 54,000 lb to a square spread footing. No geotechnical report was required, and the soil is silty sand (SM). Using the presumptive values in IBC Table 1806.2, what is the minimum footing bearing area?
Answer: 27 sq ft
Silty sand (SM) is Class 4 in Table 1806.2, with a presumptive vertical foundation pressure of 2,000 psf. Required area = 54,000 / 2,000 = 27 sq ft (about 5 ft 3 in square). Using 3,000 psf (Class 3 gravels) gives 18 sq ft; using 1,500 psf (Class 5 clays and silts) gives 36 sq ft; using 4,000 psf (sedimentary rock) gives 13.5 sq ft.
Reference: 2021 International Building Code, Section 1806.2, Table 1806.2
Your foundation crew is setting 1/2-inch anchor bolts in a poured concrete stem wall for a house. Under IRC Section R403.1.6, how far must the bolts extend into the concrete, and where must they sit in the sill plate?
Answer: At least 7 inches, in the middle third of the plate width
Section R403.1.6 requires anchor bolts to extend at least 7 inches into concrete or grouted masonry cells and to be located in the middle third of the width of the plate, with a nut and washer tightened on each bolt. Bolts near either edge can split the plate. The 7-inch embedment is a minimum; deeper is fine but not required.
Reference: 2021 International Residential Code, Section R403.1.6
A deck designed for a 40 psf live load needs No. 2 Southern pine joists at 16 inches on center to span 13 feet between the ledger and the beam (no cantilever). Using IRC Table R507.6, what is the smallest joist size that works?
Answer: 2x10
Table R507.6, 40 psf live load, Southern pine, 16-inch spacing: 2x6 spans 9-0, 2x8 spans 11-10, 2x10 spans 14-0 and 2x12 spans 16-6. A 13-foot span exceeds the 2x8 limit, so 2x10 is the smallest size that works. The 2x12 also works but is not the smallest. Reading the 12-inch column (2x8 at 13-1) is a common mistake when the joists are actually at 16 inches.
Reference: 2021 International Residential Code, Section R507.6, Table R507.6
A fixed glass sidelite in a new house is in the same plane as the front door, 14 inches from the door edge, with its bottom edge 30 inches above the floor. There is no intervening wall. Under IRC Section R308.4.2, is it a hazardous location requiring safety glazing?
Answer: Yes, because it is within 24 inches of the door and its bottom edge is under 60 inches
Section R308.4.2 makes glazing in a fixed or operable panel adjacent to a door a hazardous location where its bottom exposed edge is less than 60 inches above the floor and it is within 24 inches of either side of the door in the plane of the closed door. Here it is 14 inches away with a 30-inch bottom edge, so safety glazing is required. The 18-inch and 9 sq ft tests belong to Section R308.4.3 (glazing in windows), not glazing next to doors.
Reference: 2021 International Residential Code, Section R308.4.2
An owner wants wood shingles on a porch roof with a 2 1/2:12 slope. Under IRC Section R905.7.2, may wood shingles be installed?
Answer: No; wood shingles require a slope of at least 3:12
Section R905.7.2 requires wood shingles to be installed on slopes of 3:12 or greater, so a 2 1/2:12 porch roof is too flat. Double underlayment lets asphalt shingles go down to 2:12 and lets clay or concrete tile go down to 2 1/2:12, but it is not an option for wood shingles. A low-slope covering would be needed instead.
Reference: 2021 International Residential Code, Section R905.7.2
A plumber is running underground gas piping to a house and a separate line to a gas grill on the patio. Under IRC Section G2415.12, what are the minimum burial depths?
Answer: 12 inches for the main line; 8 inches for the grill line
Section G2415.12 (IFGC 404.12) requires underground gas piping to be at least 12 inches below grade. Section G2415.12.1 allows individual lines to outdoor lights, grills and other outdoor appliances to be at least 8 inches below finished grade, provided the installation is approved and not susceptible to physical damage. 18 inches and 6 inches are not the IRC values for gas piping.
Reference: 2021 International Residential Code, Sections G2415.12 and G2415.12.1
Sources
- ICC: 2021 National Contractor/Trades bulletin (T-series, Oct 2026) (opens in a new tab)
- ICC: 2018 National Contractor/Trades bulletin (G-series) (opens in a new tab)
Questions last verified October 21, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.