| Agency | New Mexico Regulation and Licensing Department, Construction Industries Division (CID); exams by PSI |
|---|---|
| Exam | 80 questions, 225 minutes, 75% to pass, open book |
| Books allowed | NMAC 14.7.3 (2021), 2021 IRC and IECC, plus the listed concrete, roofing, truss, carpentry and masonry texts and 29 CFR 1926 |
| Fees | Exam fees are paid to PSI (see the exam details above); license fees are separate. Check CID for current license fees. |
| Timing | Test within 6 months of becoming eligible. The exam fee and a passing score are each valid for 1 year. |
Contractors applying to Construction Industries Division for a GB-2 residential building license. GB-2 is also Part 1 of the GB-98 general building exam.
Official links
How to get licensed, step by step
Apply to CID through PSI
Candidates must be pre-approved before they can schedule. Submit your application and proof of qualifications through PSI's New Mexico construction page, or call PSI's approvals line at 877-663-9267.
PSI: apply and schedule New Mexico exams (opens in a new tab)New Mexico Construction Industries Division (CID) (opens in a new tab)
Get your references
Buy the exact code editions in PSI's bulletin. Books must be bound; highlighting, underlining and permanent tabs are allowed, but no loose notes or Post-its.
PSI Contractor Candidate Information Bulletin (opens in a new tab)New Mexico Administrative Code (NMAC) titles (opens in a new tab)
Schedule and pay PSI
After approval, contact PSI to schedule a seat and pay. Test sites include Albuquerque, Farmington, Las Cruces, Roswell and Santa Fe.
PSI: apply and schedule New Mexico exams (opens in a new tab)
Pass and finish your license
You need 75%. You may not take the same exam more than twice in 30 days. Contractors also need the Business and Law exam; journeyman candidates take a hands-on practical exam too.
New Mexico Construction Industries Division (CID) (opens in a new tab)PSI Contractor Candidate Information Bulletin (opens in a new tab)
How to prepare
- General code, plan reading and estimating (14), carpentry (12) and associated trades (12) are the biggest sections.
- Tab IRC Chapters 3 to 8 and the roofing and concrete references; estimating questions need quick takeoff math.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2021 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Residential Code (IRC), 2021, with NMAC 14.7.3Essential
Residential building code behind GB-2 and GB-98 Part 1.
29 CFR Part 1926 (OSHA construction standards)
Listed for the building exams' OSHA safety questions.
Official reference list (as published by the testing agency)
- New Mexico Residential Building Code (NMAC 14.7.3), 2021
- International Residential Code (IRC), 2021
- International Energy Conservation Code (IECC), 2021
- The Contractor's Guide to Quality Concrete Construction, 3rd Edition (ACI)
- Roofing Construction and Estimating, Daniel Atcheson, 2022
- BCSI: Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses, 2018
- Carpentry and Building Construction, Feirer (2010 or 2016)
- Modern Masonry, Kicklighter, 8th Edition, 2015
- Pipe and Excavation Contracting, Dave Roberts, 2011
- 29 CFR Part 1926 (OSHA construction standards)
What's on the exam
Official content outline from PSI, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Sitework, Footings, and Foundations | 9 | |
| Concrete and Concrete Reinforcement | 9 | |
| Masonry | 6 | |
| Carpentry | 12 | |
| Roofing | 10 | |
| Associated Trades | 12 | |
| General Code, Plan Reading, and Estimating | 14 | |
| OSHA Safety | 8 |
Exam day details
- Administered by PSI, for the New Mexico Regulation and Licensing Department, Construction Industries Division (CID).
- Fee: $134.53, paid to PSI. License and application fees are separate.
- 80 questions in 225 minutes; 75% to pass (60 points).
- Open book. Bring bound references; you may highlight, underline and index them with permanent tabs only. No loose papers, notes or Post-it tabs, and no writing in the books.
- Get CID pre-approval through PSI first (PSI approvals line 877-663-9267). Once you are eligible you must test within 6 months, or reapply with the Division. Your exam fee is valid for 1 year and a passing score is valid for 1 year.
- You may not take the same exam more than twice in a 30-day period; after two fails you must wait 30 days from your first attempt.
- You also need the Business and Law exam. General code, plan reading and estimating (14), carpentry (12) and associated trades (12) are the biggest sections.
Frequently asked questions
What's on the New Mexico GB-2 exam?
PSI's outline, 80 questions: Sitework, Footings, and Foundations 9; Concrete and Concrete Reinforcement 9; Masonry 6; Carpentry 12; Roofing 10; Associated Trades 12; General Code, Plan Reading, and Estimating 14; OSHA Safety 8.
Which code editions does the New Mexico exam use?
PSI's bulletin pins the editions: for electrical, the 2020 NEC plus the New Mexico Electrical Code (NMAC 14.10.4); for plumbing and gas, the 2021 UPC and UMC plus the New Mexico plumbing and mechanical codes (NMAC 14.8.2 and 14.9.2); for building, the 2021 IRC or IBC plus NMAC 14.7.3 or 14.7.2. Code questions use only the listed edition.
Who gives the New Mexico contractor and journeyman exams?
PSI, for the Construction Industries Division (CID) of the Regulation and Licensing Department. CID pre-approves your application, then you schedule with PSI at a New Mexico test center (Albuquerque, Farmington, Las Cruces, Roswell or Santa Fe) or an approved center elsewhere.
Free questions with answers
Show all 10 free questions and answers
A crew forms a continuous footing 16 inches wide and 8 inches thick under a 10-inch concrete foundation wall centered on the footing. What is the projection on each side, and does it meet the 2021 IRC limit on projection?
Answer: 3 inches; yes, it is not less than 2 inches and not more than the 8-inch thickness
Projection P = (16 - 10) / 2 = 3 inches per side. Section R403.1.1 requires the projection to be at least 2 inches and no more than the footing thickness (8 inches here), so 3 inches complies. The projection is a maximum tied to thickness, not a minimum equal to it.
Reference: 2021 International Residential Code, Section R403.1.1
Under the 2021 IRC, what is the minimum thickness of a concrete slab-on-ground floor (non-expansive soil)?
Answer: 3 1/2 inches
Section R506.1 requires slab-on-ground floors to be at least 3 1/2 inches thick. Slabs on expansive soils must be designed under Section R403.1.8 instead. Four inches is the common nominal thickness but not the code minimum.
Reference: 2021 International Residential Code, Section R506.1
Unless the drawings say otherwise, what is the standard thickness of head and bed mortar joints in residential masonry under Section R606.3.1?
Answer: 3/8 inch
Section R606.3.1 sets head and bed joints at 3/8 inch unless the project drawings say otherwise. The starting bed joint over the foundation may vary from 1/4 inch to 3/4 inch to level up the first course.
Reference: 2021 International Residential Code, Section R606.3.1
A nominal 2x10 floor joist (actual depth 9 1/4 inches) must be notched away from the ends and outside the middle third of the span. What is the maximum notch depth under Section R502.8.1?
Answer: About 1.5 inches (1/6 of the depth)
Notches in solid lumber joists may not exceed one-sixth of the member depth: 9.25 / 6 = 1.54 inches. They may not be longer than one-third of the depth and cannot be in the middle third of the span. One-quarter applies only to notches at the ends of the member.
Reference: 2021 International Residential Code, Section R502.8.1
How far must end joints in the double top plate of a wood-framed wall be offset from one another, per Section R602.3.2?
Answer: At least 24 inches
Section R602.3.2 requires double top plates to overlap at corners and intersections and requires end joints to be offset at least 24 inches. Joints in plates need not occur over studs.
Reference: 2021 International Residential Code, Section R602.3.2
A hip-and-valley roof has a flat-plan area of 1,200 square feet and an 8:12 slope. What is the slope multiplier, and about how many squares of shingles are needed (before waste)?
Answer: 1.202; about 14.4 squares
Multiplier = sqrt(8^2 + 12^2) / 12 = 14.42 / 12 = 1.202. Roof area = 1,200 x 1.202 = 1,442 sq ft = 14.4 squares. The 1.118 multiplier is for 6:12 and 1.414 is for 12:12; 12.0 squares ignores the slope.
Reference: Roofing Construction and Estimating (Atcheson), 2022, Roof area from footprint and slope multiplier
In a living room, receptacles must be placed so that no point along the floor line of any wall space is more than what distance from an outlet?
Answer: 6 feet
NEC 210.52(A)(1) requires that no point measured horizontally along the floor line of any wall space be more than 6 feet from a receptacle outlet, which works out to receptacles about every 12 feet along a continuous wall. NM deletes IRC Chapters 34-43 (14.7.3.23 NMAC) and uses the NEC through 14.10.4 NMAC, so the IRC Chapter 39 number is not the New Mexico reference. Wall spaces 2 feet or wider are counted.
Reference: NFPA 70, National Electrical Code, 2020 (adopted by NMAC 14.10.4), Section 210.52(A)(1)
A kitchen counter wall is 12 inches or wider. Section E3901.4.1 requires receptacles so that no point along the counter wall line is more than what distance from an outlet?
Answer: 24 inches
Section E3901.4.1 requires an outlet at each wall countertop 12 inches or wider, positioned so no point on the wall line is farther than 24 inches measured horizontally from an outlet. The 6-foot rule is for general wall spaces in living areas, not kitchen counters.
Reference: NFPA 70, National Electrical Code, 2020 (adopted by NMAC 14.10.4), Section 210.52(C)(1)
A bedroom is 12 feet by 15 feet. Using Section R303.1, what aggregate glazing area and openable area are the minimum for natural light and ventilation?
Answer: 14.4 sq ft glazing; 7.2 sq ft openable
Floor area = 12 x 15 = 180 square feet. Glazing must be at least 8 percent: 180 x 0.08 = 14.4 sq ft. Openable area must be at least 4 percent: 180 x 0.04 = 7.2 sq ft. Reversing the percentages gives the third choice.
Reference: 2021 International Residential Code, Section R303.1
A trench is 6 feet deep and workers are in it. Under 29 CFR 1926.651(c)(2), how close must a ladder, stairway or ramp be to the workers?
Answer: Within 25 feet of lateral travel
Where trench excavations are 4 feet or more in depth, a stairway, ladder, ramp or other safe means of egress must be located so that no more than 25 feet of lateral travel is required for employees. Distances of 50 or 100 feet are incorrect.
Reference: 29 CFR Part 1926, 1926.651(c)(2)
Sources
- PSI: New Mexico Contractor Candidate Information Bulletin (updated 4/3/2026) (opens in a new tab)
- New Mexico Construction Industries Division: Exams (opens in a new tab)
- PSI: New Mexico Construction Industries exams (opens in a new tab)
Questions last verified November 2, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.