Requirements at a glance
| Who requires it | Class A general contractor licenses in Denver, PPRBD, Larimer, Jefferson and Boulder counties, Aurora, Fort Collins, Centennial and other ICC jurisdictions |
|---|---|
| Exam | 90 questions, 4 hours, open book |
| Books allowed | 2021 IBC and ICC's Concrete Manual |
| Fee | $120 per attempt (Pearson VUE), plus your jurisdiction's license fee |
Class A (commercial, any size) general contractor qualifiers in cities and counties that license contractors with ICC exams, including Denver, Colorado Springs (PPRBD), Larimer, Jefferson and Boulder counties, Aurora and Fort Collins.
Official links
How to get certified, step by step
Check your jurisdiction's requirement
Find your license class on your city or county's contractor page and note the exact ICC exam ID. The letter shows the code year (G = 2018, T = 2021), and from December 1, 2026 the T-series ID also shows whether you need 70% or 75%.
Denver: contractor licenses and supervisor certificates (opens in a new tab)Pikes Peak Regional Building Department: contractor licensing (opens in a new tab)
Register with ICC
Create an ICC account, buy the exam from ICC's catalog, then schedule with Pearson VUE at a test center or online.
Bring the right code books
Open book: 2021 IBC and ICC's Concrete Manual. Tabs and highlighting are allowed; loose notes aren't.
ICC 2021 National Contractor/Trades bulletin (PDF) (opens in a new tab)
Pass and apply
Results are immediate. Submit your passing score with your license application, insurance and fees. If you fail, wait 10 days to retake.
How to prepare
- Tab your code book by chapter before exam day; most questions are lookups, and 4 hours goes fast.
- Building planning (occupancy, construction types, allowable area, egress) and structural systems are 70% of the exam: know IBC Chapters 3, 5, 6, 10, 16–23 well.
- Practice allowable height and area lookups in Tables 504.3, 504.4 and 506.2.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2021 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 International Building Code (IBC)Essential
The main reference for exams 11 and 12.
ICC store (opens in a new tab)Read free (opens in a new tab)
Concrete Manual: Concrete Quality and Field Practices (based on the 2021 IBC and ACI 318-19)
Allowed for exams 11 and 12: mix design, placing, curing, testing and inspection.
Official reference list (as published by the testing agency)
- International Building Code (IBC), 2021
- Concrete Manual: Concrete Quality and Field Practices, based on the 2021 IBC and ACI 318-19 (ICC)
What's on the exam
Official content outline from International Code Council (ICC), delivered by Pearson VUE (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Permits and General Regulations | 15 | |
| Building Planning and Life Safety | 35 | |
| Structural Systems | 35 | |
| Building Envelope | 15 |
The outline totals 100; the other items on the 90-question exam are unscored or unassigned.
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE.
- Fee: $120 per attempt (Pearson VUE). Your city or county license fee is separate.
- 90 multiple-choice questions in 4 hours, open book.
- Exam IDs show the code year: F = 2015 codes (retired December 1, 2026), G = 2018, T = 2021. Our questions use the 2021 codes; check which edition your jurisdiction requires.
- From December 1, 2026 the 2021 (T-series) exams come in 70% and 75% passing versions, and each jurisdiction picks one. ICC has historically used a scaled 75.
- Open book: bring the listed references. Four-option multiple choice, no penalty for guessing. Results are immediate, and you wait 10 days to retake.
Frequently asked questions
Which code edition should I study for the ICC 11 exam?
Whichever edition your jurisdiction requires. ICC now offers the exam on the 2021 codes (T11) and the 2018 codes (G11); the 2015 version (F11) retires December 1, 2026. Our questions use the 2021 IBC.
What's on the ICC General Building Contractor exam?
90 questions: building planning and life safety (35%) and structural systems (35%) make up most of it, plus permits and general regulations (15%) and the building envelope (15%).
Which Colorado cities use the ICC 11 exam?
Denver (Class A), Pikes Peak Regional Building Department (B-A), Larimer, Jefferson and Boulder counties, Aurora, Fort Collins and Centennial all list exam 11 for their Class A or commercial general contractor license.
Free questions with answers
Show all 10 free questions and answers
A contractor pulls a building permit for a retail tenant finish but the owner delays the start. Under the 2021 IBC, the permit becomes invalid if work on the site is not commenced within how many days after issuance?
Answer: 180 days
IBC Section 105.5 says a permit becomes invalid if the authorized work is not started within 180 days after issuance, or if work is suspended or abandoned for 180 days after it starts. The building official may grant written extensions of up to 180 days each when the request is in writing and justifiable cause is shown. 90 days is the extension period for an abandoned permit application (Section 105.3.2), not for an issued permit.
Reference: 2021 International Building Code, Section 105.5
A one-story office floor has 12,000 sq ft of gross floor area used entirely as business areas. Using IBC Table 1004.5, what is the design occupant load?
Answer: 80 occupants
IBC Table 1004.5 assigns business areas an occupant load factor of 150 sq ft gross per occupant. Per Section 1004.5, 12,000 / 150 = 80 occupants. 120 comes from the 100 gross industrial factor, 200 from the 60 gross mercantile factor and 40 from the 300 gross storage factor.
Reference: 2021 International Building Code, Section 1004.5 and Table 1004.5
A one-story, nonsprinklered Group B building of Type VB construction has 50% of its perimeter on open space at least 30 feet wide; the rest of the perimeter has less than 20 feet of open space. Using IBC Table 506.2, Table 506.3.3 and Equation 5-1, what is the allowable area?
Answer: 13,500 sq ft
Table 506.2 gives Group B, Type VB, NS: At = 9,000 sq ft. Table 506.3.3 gives a frontage increase factor If = 0.50 for 50 to less than 75 percent of the perimeter with open space of 30 feet or greater. Equation 5-1: Aa = At + (NS x If) = 9,000 + (9,000 x 0.50) = 9,000 + 4,500 = 13,500 sq ft. 11,250 comes from using the 0.25 factor for the 25 to 50 percent row, and 9,000 ignores frontage altogether.
Reference: 2021 International Building Code, Section 506.2.1, Equation 5-1; Tables 506.2 and 506.3.3
A new 4,000 sq ft restaurant (Group A-2) is on the level of exit discharge and has an occupant load of 130. Under IBC Section 903.2.1.2, is an automatic sprinkler system required?
Answer: Yes, because the occupant load is 100 or more
IBC Section 903.2.1.2 requires sprinklers for Group A-2 where any one condition is met: the fire area exceeds 5,000 sq ft, the fire area has an occupant load of 100 or more, or the fire area is on a floor other than the level of exit discharge. The area condition is not met, but 130 occupants meets the occupant load condition. The conditions are alternatives, so one is enough.
Reference: 2021 International Building Code, Section 903.2.1.2
A contractor is building a 60-foot-high building 20 feet from the lot line along a public sidewalk. Using IBC Table 3306.1, what type of pedestrian protection is required?
Answer: A barrier
For construction more than 8 feet high, IBC Table 3306.1 bases protection on the distance to the lot line compared with the height of construction. One-fourth of 60 feet is 15 feet and one-half is 30 feet. At 20 feet, the site is between one-fourth and one-half of the height, so a barrier is required. A covered walkway is needed only when the distance is less than 5 feet or no more than one-fourth of the height, and no protection is needed beyond one-half of the height.
Reference: 2021 International Building Code, Section 3306.1 and Table 3306.1
An office building assigned to Seismic Design Category D will be supported on shallow foundations. Using IBC Table 1808.8.1, what is the minimum specified compressive strength of the foundation concrete?
Answer: 3,000 psi
IBC Table 1808.8.1 requires 3,000 psi for foundations of structures in Seismic Design Category D, E or F (item 2b), except Group R or U light-frame buildings two stories or less, which may use 2,500 psi (item 2a). An office building is neither R nor U, so 3,000 psi applies. 2,500 psi applies to Seismic Design Categories A, B and C, and 4,000 psi applies to certain piles and drilled shafts.
Reference: 2021 International Building Code, Section 1808.8.1 and Table 1808.8.1
A balcony serves a private guest room in a hotel. Using IBC Table 1607.1, what minimum uniform live load must the balcony be designed for?
Answer: 60 psf
IBC Table 1607.1, item 5, requires balconies and decks to be designed for 1.5 times the live load of the area served, but not more than 100 psf. Item 26 lists hotel private rooms and the corridors serving them at 40 psf. So 1.5 x 40 = 60 psf. 40 psf forgets the 1.5 multiplier, and 100 psf is only the cap.
Reference: 2021 International Building Code, Table 1607.1, items 5 and 26
An electrician will bore holes through single 2x4 studs (actual depth 3 1/2 inches) in a bearing wall. Under IBC Section 2308.5.10, what is the largest hole diameter allowed?
Answer: 1.4 inches
IBC Section 2308.5.10 limits bored holes in studs to 40 percent of stud depth: 0.40 x 3.5 = 1.4 inches. The edge of the hole must be at least 5/8 inch from the stud edge. 60 percent (2.1 inches) is allowed only in nonbearing partitions, or where studs are doubled and no more than two successive doubled studs are bored.
Reference: 2021 International Building Code, Section 2308.5.10
Under IBC Section 1507.2.2, what is the minimum roof slope for asphalt shingles, and over what slope range is double underlayment required?
Answer: 2:12 minimum; double underlayment from 2:12 up to 4:12
IBC Section 1507.2.2 allows asphalt shingles only on slopes of 2:12 (17 percent) or steeper. From 2:12 up to 4:12 (33 percent), double underlayment is required per Section 1507.1.1. Clay and concrete tile (Section 1507.3.2) use a different minimum of 2 1/2:12.
Reference: 2021 International Building Code, Section 1507.2.2
A rooftop equipment curb penetrates a sloped roof and measures 42 inches wide perpendicular to the slope. Under IBC Section 1503.5, what is required on the ridge (upslope) side of the penetration?
Answer: A cricket or saddle
IBC Section 1503.5 requires a cricket or saddle on the ridge side of any chimney or penetration more than 30 inches wide, measured perpendicular to the slope. The cricket or saddle covering must be sheet metal or the same material as the roof covering. A 42-inch-wide curb exceeds the 30-inch threshold. Unit skylights flashed per the manufacturer's instructions are exempt.
Reference: 2021 International Building Code, Section 1503.5
Sources
- ICC: 2021 National Contractor/Trades bulletin (T-series, Oct 2026) (opens in a new tab)
- ICC: 2018 National Contractor/Trades bulletin (G-series) (opens in a new tab)
- ICC: 2015 National Contractor/Trades bulletin (F-series, retiring 12/1/2026) (opens in a new tab)
Questions last verified October 21, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.