Requirements at a glance
| Who takes it | The qualifying individual on every new Nevada contractor license |
|---|---|
| Format | 60 scored + 3 unscored questions, 126 minutes, 75% (45) to pass |
| Book allowed | Construction Business and Law Manual for Nevada (PSI) |
| Fee | $95 alone, or $140 with your trade exam |
The qualifying individual on every new Nevada contractor license, in every classification, unless the Board waives it.
Official links
How to get licensed, step by step
Get the manual
Buy the Construction Business and Law Manual for Nevada from PSI and tab it: licensing, liens, taxes, labor law and financial statements.
PSI online store (Construction Business and Law Manual for Nevada) (opens in a new tab)
Learn Nevada's contractor law
Most licensing and lien questions come from NRS 624 and NRS 108. Read the sections on monetary limits, bonds, the Residential Recovery Fund and lien deadlines.
NRS Chapter 624 (Contractors) (opens in a new tab)NRS Chapter 108 (mechanics' liens) (opens in a new tab)
Schedule with PSI
Once the Board approves you to test, schedule the CMS with your trade exam. You need 75%, higher than the trade exams.
Schedule with PSI (Nevada contractors) (opens in a new tab)PSI: Nevada "C" classification bulletin and outlines (opens in a new tab)
How to prepare
- Financial management is the biggest section (12 of 60): practice markup vs. margin, current and quick ratios, break-even and job-cost math.
- Know the lien deadlines: notice of right to lien, recording the lien, and the time to sue to foreclose.
- The pass mark is 75%, so you can miss only 15 questions. Take our timed practice exams until you're comfortably above that.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the Construction Business and Law Manual for Nevada. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Construction Business and Law Manual for Nevada (PSI)Essential
The only book allowed for the CMS exam. Tab the licensing, lien law, tax and labor law chapters.
PSI online store (Construction Business and Law Manual for Nevada) (opens in a new tab)
Nevada contractor and lien law: NRS 624, NAC 624 and NRS 108
Free online. Licensing and lien questions come from these chapters.
Official reference list (as published by the testing agency)
- Construction Business and Law Manual for Nevada, PSI (allowed in the exam room)
- NRS and NAC Chapter 624 (contractors), NRS 108 (mechanics' liens) and the other Nevada and federal laws the manual summarizes
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Licensing | 10 | |
| Estimating and Bidding | 7 | |
| Lien Law | 3 | |
| Financial Management | 12 | |
| Tax Laws | 5 | |
| Labor Laws | 5 | |
| Project Management | 3 | |
| Contracts | 6 | |
| Risk Management | 4 | |
| Environmental and Safety | 5 |
Exam day details
- Administered by PSI Services for the Nevada State Contractors Board (NSCB).
- Fee: $95 to PSI for one exam, $140 for a trade exam plus the CMS. NSCB application and license fees are separate.
- 60 scored questions plus 3 unscored ones in 126 minutes. You need 45 correct (75%), a higher bar than the trade exams.
- Open book with the Construction Business and Law Manual for Nevada. You may highlight and add permanent tabs beforehand, but not write in it.
- Open book: bring your own copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them; sticky notes are removed.
- PSI may add up to 10 unscored trial questions, which count against your time.
- If you fail, wait 2 weeks to retake. You get three attempts, and you must pass within 6 months of filing your application; a third failure voids the application.
- Every Nevada contractor license needs both the Construction Management Survey (business and law) and the trade exam for the classification, plus 4 years of experience in the last 15.
Frequently asked questions
What's on the Nevada CMS exam?
60 scored questions: financial management 12, licensing 10, estimating and bidding 7, contracts 6, tax laws 5, labor laws 5, environmental and safety 5, risk management 4, lien law 3 and project management 3.
What book do I need for the Nevada business and law exam?
The Construction Business and Law Manual for Nevada, sold by PSI. It's the only reference allowed in the room.
Do I have to take the CMS if I already passed a trade exam?
Yes. Nevada requires both the CMS and the trade exam for your classification. The Board can waive exams for applicants licensed in an endorsing state or who passed an accepted NASCLA exam.
Free questions with answers
Show all 10 free questions and answers
An applicant for a Nevada C-3 carpentry license has worked 6 years as a carpentry foreman. How much of that experience must fall within the 15 years before the application is filed?
Answer: At least 4 years
NRS 624.260(6) requires at least 4 years of experience as a journeyman, foreman, supervising employee or contractor in the specific classification within the 15 years immediately before the application is filed. Three years is the most that approved college or training programs can substitute for, not the experience minimum. The applicant's 6 years only need to include 4 qualifying years within that window.
Reference: Nevada Revised Statutes, NRS 624.260(6)
A licensed C-4 painting contractor is asked to replace a damaged section of a homeowner's fence for $700. The job needs no building permit. Under NRS 624.220(4)(b), may the painter do it?
Answer: Yes; work outside the classification under $1,000 (labor and materials) that needs no permit is allowed, unless it is plumbing, electrical, refrigeration or air-conditioning work
NRS 624.220(4)(b) lets a licensed contractor do work of a type outside its classification if the value is less than $1,000 including labor and materials and no permit is required. The exception never covers work of a type done by plumbing, electrical, refrigeration or air-conditioning contractors. The $500 figure in NRS 624.031(6) relates to splitting a larger project to evade licensing, not to this rule.
Reference: Nevada Revised Statutes, NRS 624.220(4)(b)
A drywall subcontractor first delivers board to a commercial job on May 1 and sends the owner a notice of right to lien on June 20. For which work does the notice preserve lien rights?
Answer: Work performed in the 31 days before June 20 and all work after it until completion
Under NRS 108.245(6), a claimant who must give a notice of right to lien has lien rights for work and materials furnished in the 31 days before the notice is given and anything furnished afterward until the work of improvement is complete. Here that means work from May 20 onward; board delivered May 1 to May 19 is not lienable, which is why the notice should go out early. The 90-day figure is the deadline to record the lien itself (NRS 108.226(1)(a)). The sub must also send a copy of the notice to the prime contractor.
Reference: Nevada Revised Statutes, NRS 108.245(6)
A contractor's balance sheet shows cash $90,000, accounts receivable $87,000, materials inventory $59,000 and current liabilities $118,000. What is the current ratio?
Answer: 2.0 to 1
Current ratio = current assets ÷ current liabilities. Current assets = $90,000 + $87,000 + $59,000 = $236,000, and $236,000 ÷ $118,000 = 2.0, so 2.0 to 1. 1.5 to 1 is the quick (acid-test) ratio, which leaves out inventory: ($90,000 + $87,000) ÷ $118,000 = 1.5. 0.5 to 1 is the ratio inverted.
Reference: General business practice, Financial ratios: current ratio
A slab on grade is 40 ft by 60 ft and 4 inches thick. With a 5% waste allowance, about how many cubic yards of concrete should be ordered?
Answer: 31.1 cubic yards
Volume = 40 ft × 60 ft × (4 ÷ 12) ft = 800 cubic feet. 800 ÷ 27 = 29.6 cubic yards. Add 5% waste: 29.6 × 1.05 ≈ 31.1 cubic yards. 29.6 leaves out the waste allowance, and 88.9 divides by 9 instead of 27.
Reference: General business practice, Quantity takeoff: concrete volume
For 2026 wages, what is the combined employer-plus-employee rate of social security and Medicare (FICA) tax on an employee's wages below the social security wage base?
Answer: 15.3%
IRS Publication 15 gives a social security rate of 6.2% each for employer and employee and a Medicare rate of 1.45% each. Each side pays 6.2% + 1.45% = 7.65%, so together 15.3%. 7.65% is only one side's share, and 12.4% is social security alone for both sides. The employer withholds the employee's share and pays a matching amount.
Reference: IRS Publication 15 (2026), Social security and Medicare taxes
A Nevada laborer earning less than 1-1/2 times the state minimum wage works a regular 8-hour schedule. On Tuesday they work 10 hours; their week totals 38 hours. Under NRS 608.018, how much overtime is owed for the week?
Answer: 2 hours at 1-1/2 times the regular rate
NRS 608.018(1) requires 1-1/2 times the regular rate for an employee paid less than 1-1/2 times the minimum wage who works more than 40 hours in a week or more than 8 hours in a workday (unless they've agreed to a 4-day, 10-hour schedule). Tuesday's 2 hours past 8 are overtime even though the week totals only 38. Nevada's daily overtime rule is stricter than the federal FLSA, which looks only at the 40-hour week.
Reference: Nevada Revised Statutes, NRS 608.018(1)
A prime contractor's written subcontract has a payment schedule saying the sub is paid on the 30th of the month after billing. The prime is paid by the owner for the sub's work on the 8th. Under NRS 624.624, when is payment to the sub due?
Answer: Within 10 days after the prime is paid (the 18th), because that is earlier
With a written schedule, NRS 624.624(1)(a) requires payment on the scheduled date or within 10 days after the higher-tiered contractor receives payment for the work, whichever is earlier. Being paid on the 8th makes the 18th earlier than the 30th. The 45-days-after-the-25th rule in NRS 624.626 is the point at which a sub may stop work even under a pay-if-paid clause.
Reference: Nevada Revised Statutes, NRS 624.624(1)(a)
Under NRS 618.983, within how many days after being hired must a non-supervisory construction worker in Nevada obtain an OSHA-10 completion card?
Answer: 15 days
NRS 618.983(1) requires a construction worker other than a supervisory employee to obtain an OSHA-10 completion card within 15 days after the hire date. A supervisory employee must obtain an OSHA-30 card within the same 15 days (618.983(2)). The 90-day figure is from the written safety program law (NRS 618.383).
Reference: Nevada Revised Statutes, NRS 618.983(1)
Which insurance policy covers a building under construction against damage from fire, wind or theft of installed materials before the owner takes possession?
Answer: Builder's risk
Builder's risk (course of construction) insurance covers physical loss or damage to the work itself, including materials on site, during construction. Commercial general liability covers bodily injury and property damage to third parties caused by the contractor's operations, not damage to the project being built. Workers' compensation covers employee injuries.
Reference: General business practice, Insurance: builder's risk
Sources
- PSI: Nevada Contractors "C" Classification Candidate Information Bulletin (3/25/2026) (opens in a new tab)
- PSI: Nevada Contractors "B" Classification Candidate Information Bulletin (3/25/2026) (opens in a new tab)
- Nevada State Contractors Board: License examinations (opens in a new tab)
- NRS Chapter 624 (Contractors) (opens in a new tab)
Questions last verified October 22, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.