Nevada licensing exam

Nevada B General Building Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for Nevada's B General Building license: 80 questions on concrete, steel, carpentry, moisture protection, plan reading and estimating, with the 2018 IBC open book.

Questions
80
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Nevada One Call

An excavator strikes a buried gas line and gas is escaping. Under NRS 455.140, what must the excavator do?

Requirements at a glance

AgencyNevada State Contractors Board (NSCB); exams by PSI
Experience4 years as a journeyman, foreman, supervisor or contractor in the classification within the last 15 years (up to 3 years can be education)
Exams80 questions, 3 hours, 70%, plus the Construction Management Survey (business and law)
Books allowed2018 IBC, ACI 318 and ACI 530
Fees$95 per PSI exam ($140 for a trade exam plus the CMS), plus NSCB application and license fees and a bond

Qualifying individuals for a Nevada B General Building contractor license (commercial and residential buildings of any height).

How to get licensed, step by step

  1. Pick your classification

    Find the NSCB classification that covers your work, and name the qualifying individual (an owner or a qualified employee) with 4 years of experience in it.

    NSCB: License classifications (opens in a new tab)

  2. Apply to the NSCB

    Submit the application with your experience verification, financial statement and fingerprints. The Board sends you an exam eligibility notice once it accepts your qualifications.

    Nevada State Contractors Board (opens in a new tab)

  3. Schedule the CMS and B trade exam with PSI

    Book both exams with PSI. Bring the allowed references, tabbed. If you fail, wait 2 weeks; you get three attempts and must pass within 6 months of filing.

    Schedule with PSI (Nevada contractors) (opens in a new tab)PSI: Nevada "B" classification bulletin and outlines (opens in a new tab)

  4. Post your bond and get licensed

    After you pass, the Board sets your monetary limit and bond amount ($1,000 to $500,000). File the bond and pay the license fee to receive your license.

How to prepare

  • Bring the exact editions on PSI's outline. Nevada's trade exams use the 2017 NEC, the 2018 IBC/IRC and the 2018 UPC/UMC; a newer book gives some wrong answers.
  • Tab your books with permanent tabs before exam day. Sticky notes are removed at check-in, and you can't write in the books.
  • OSHA 1926 isn't allowed in the room, but every trade exam has a safety section from it. Learn the common numbers (fall protection at 6 ft, ladders 3 ft above the landing, trenches 5 ft).
  • Concrete, metals and plan reading/estimating are 36 of the 80 questions. Practice quantity takeoffs (cubic yards, block counts, rebar weight) and know IBC Chapters 19 (concrete) and 22 (steel).
  • Nevada One Call is 3 questions: know the notice period before digging and the color codes for markings.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Building Code (IBC), 2018 (allowed in the exam room)
  • ACI 318-11 or 318-14, Building Code Requirements for Structural Concrete (allowed in the exam room)
  • ACI 530/530.1-11 or -13, masonry structures (allowed in the exam room)
  • 29 CFR Part 1926, OSHA Construction (not allowed in the room)
  • Nevada One Call law and marking guidelines; SJI Technical Digest 9; PTI post-tensioning field fundamentals; Modern Masonry; Gypsum Construction Handbook (not allowed in the room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Sitework6
Concrete12
Masonry6
Metals12
Carpentry7
Thermal and Moisture Protection9
Doors and Windows4
Drywall and Finishes4
Safety5
Plan Reading and Estimating12
Nevada One Call3

Exam day details

  • Administered by PSI Services for the Nevada State Contractors Board (NSCB).
  • Fee: $95 to PSI for one exam, $140 for a trade exam plus the CMS. NSCB application and license fees are separate.
  • 80 questions in 3 hours; 56 correct (70%) to pass.
  • Open book: bring your own copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them; sticky notes are removed.
  • PSI may add up to 10 unscored trial questions, which count against your time.
  • If you fail, wait 2 weeks to retake. You get three attempts, and you must pass within 6 months of filing your application; a third failure voids the application.
  • Every Nevada contractor license needs both the Construction Management Survey (business and law) and the trade exam for the classification, plus 4 years of experience in the last 15.

Frequently asked questions

What's on the Nevada B General Building exam?

80 questions: concrete 12, metals 12, plan reading and estimating 12, thermal and moisture protection 9, carpentry 7, sitework 6, masonry 6, safety 5, doors and windows 4, drywall and finishes 4 and Nevada One Call 3.

What books can I bring to the Nevada B exam?

The 2018 IBC, ACI 318 (2011 or 2014) and ACI 530/530.1 (2011 or 2013). OSHA 1926 and the trade books on PSI's list can't be brought in, but questions are written from them.

B or B-2: which Nevada license do I need?

B-2 covers houses and other buildings up to three stories above ground and one below. Larger commercial buildings need the B General Building license.

Free questions with answers

Show all 10 free questions and answers
  1. An excavator strikes a buried gas line and gas is escaping. Under NRS 455.140, what must the excavator do?

    Answer: Notify the operator and minimize the hazard until the operator's personnel arrive

    NRS 455.140(2) requires anyone whose excavation damages a subsurface installation so that water, flammable, toxic or corrosive gas or liquid, or electricity escapes to notify the operator and minimize the hazard until the operator's personnel arrive. For any contact, exposure or damage, 455.140(1) also requires notifying the operator and allowing reasonable time for repairs before finishing the excavation in that area. Backfilling or self-repairing hides the damage.

    Reference: Nevada Revised Statutes, NRS 455.140

  2. No geotechnical report is required for a small building, and a column footing will bear on silty sand (SM). The column load is 54,000 pounds. Using IBC Table 1806.2 presumptive values, what minimum footing area is needed?

    Answer: 27 square feet

    IBC Table 1806.2 gives Class 4 materials (sand, silty sand, clayey sand, silty and clayey gravel: SW, SP, SM, SC, GM, GC) a presumptive vertical foundation pressure of 2,000 psf. Area = 54,000 ÷ 2,000 = 27 sq ft (about a 5'-3" square). 18 sq ft uses the 3,000 psf gravel value, and 36 sq ft uses the 1,500 psf clay value.

    Reference: 2018 International Building Code, Table 1806.2

  3. Under IBC 1907.1, what is the minimum thickness of a concrete floor slab supported directly on the ground, and what vapor retarder is normally required under it?

    Answer: 3-1/2 inches; 6-mil polyethylene with joints lapped at least 6 inches

    IBC 1907.1 requires slabs on ground to be at least 3-1/2 inches thick, with a 6-mil (0.006 in) polyethylene vapor retarder lapped at least 6 inches between the base course or subgrade and the slab, or an approved equivalent. Exceptions omit the retarder where moisture isn't a concern, such as detached unheated garages accessory to R-3 occupancies, driveways, walks and patios.

    Reference: 2018 International Building Code, Section 1907.1

  4. Under 29 CFR 1926.755(a)(1), at least how many anchor rods (anchor bolts) must each column have?

    Answer: 4

    1926.755(a)(1) requires all columns to be anchored by a minimum of 4 anchor rods, with column bases designed to resist a minimum 300-pound eccentric gravity load 18 inches from the extreme outer face of the column. Four rods keep the column stable before the frame is connected and braced.

    Reference: 29 CFR Part 1926, 1926.755(a)(1)

  5. A crew will build a 14-foot-high CMU wall with scaffolding on one side. Under 29 CFR 1926.706(a), how wide must the limited access zone be, and on which side?

    Answer: 18 feet, on the unscaffolded side

    1926.706(a) requires a limited access zone, set up before the wall is started, equal to the wall height plus 4 feet (14 + 4 = 18 feet), running the full length of the wall on the unscaffolded side. Only employees actively building the wall may enter, and the zone stays until the wall is adequately supported against overturning.

    Reference: 29 CFR Part 1926, 1926.706(a)

  6. An order calls for 60 pieces of 2×12 lumber, each 16 feet long. How many board feet is that (nominal dimensions)?

    Answer: 1,920 board feet

    Board feet = thickness (in) × width (in) × length (ft) ÷ 12. One piece: 2 × 12 × 16 ÷ 12 = 32 board feet. 60 pieces × 32 = 1,920 board feet. 960 uses a 1-inch thickness, 1,440 uses 12-foot lengths, and 2,880 uses 24-foot lengths.

    Reference: General trade practice, Lumber takeoff: board feet = T × W × L ÷ 12

  7. Under IBC 1507.2.2, asphalt shingles on a roof with a 3-in-12 slope require what underlayment?

    Answer: Double underlayment application

    IBC 1507.2.2 allows asphalt shingles on slopes of 2 in 12 or greater, and requires double underlayment for slopes from 2 in 12 up to 4 in 12. A 3-in-12 roof falls in that range. Underlayment is applied per 1507.1.1. Clay and concrete tile (1507.3.2) start at 2-1/2 in 12, with double underlayment up to 4 in 12.

    Reference: 2018 International Building Code, Section 1507.2.2

  8. A fixed sidelite next to an office entry door has its nearest edge 16 inches from the door edge and its bottom edge 20 inches above the floor. Under IBC 2406.4.2, is it a hazardous location requiring safety glazing?

    Answer: Yes, because it is within a 24-inch arc of the door edge and its bottom edge is below 60 inches

    IBC 2406.4.2 treats glazing as hazardous where the nearest vertical edge is within a 24-inch arc of either vertical edge of the closed door and the bottom exposed edge is less than 60 inches above the walking surface. Both conditions are met (16 in, 20 in). The 18-inch figure belongs to the large-window test in 2406.4.3.

    Reference: 2018 International Building Code, Section 2406.4.2

  9. Under IBC 2512.4, what temperature rules apply to cement plaster work?

    Answer: Apply only above 40°F (or keep the work above 40°F during application and for 48 hours after), and protect coats from freezing for at least 24 hours after set

    IBC 2512.4 requires cement plaster to be applied when the ambient temperature is above 40°F, unless the work is kept above 40°F during application and for 48 hours after, and each coat to be protected from freezing for at least 24 hours after set. Frozen plaster loses its bond and strength.

    Reference: 2018 International Building Code, Section 2512.4

  10. A one-story office building (Group B) has 9,000 square feet of gross floor area. Using IBC Table 1004.5, what is its design occupant load?

    Answer: 60

    IBC Table 1004.5 assigns business areas an occupant load factor of 150 gross square feet per occupant: 9,000 ÷ 150 = 60. 90 uses 100 sq ft per person (industrial or outpatient), and 45 uses 200 (commercial kitchens).

    Reference: 2018 International Building Code, Table 1004.5

Sources

Questions last verified October 22, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.