Requirements at a glance
| Agency | Nevada State Contractors Board (NSCB); exams by PSI |
|---|---|
| Experience | 4 years as a journeyman, foreman, supervisor or contractor in the classification within the last 15 years (up to 3 years can be education) |
| Exams | 60 questions, 2 hours, 70%, plus the Construction Management Survey (business and law) |
| Books allowed | 2018 IBC and ACI 318 |
| Fees | $95 per PSI exam ($140 for a trade exam plus the CMS), plus NSCB application and license fees and a bond |
Qualifying individuals for a Nevada C-5 Concrete license (placing, finishing, forming, reinforcing, sealing, sawing and coring concrete).
Official links
How to get licensed, step by step
Pick your classification
Find the NSCB classification that covers your work, and name the qualifying individual (an owner or a qualified employee) with 4 years of experience in it.
Apply to the NSCB
Submit the application with your experience verification, financial statement and fingerprints. The Board sends you an exam eligibility notice once it accepts your qualifications.
Schedule the CMS and C-5 trade exam with PSI
Book both exams with PSI. Bring the allowed references, tabbed. If you fail, wait 2 weeks; you get three attempts and must pass within 6 months of filing.
Schedule with PSI (Nevada contractors) (opens in a new tab)PSI: Nevada "C" classification bulletin and outlines (opens in a new tab)
Post your bond and get licensed
After you pass, the Board sets your monetary limit and bond amount ($1,000 to $500,000). File the bond and pay the license fee to receive your license.
How to prepare
- Bring the exact editions on PSI's outline. Nevada's trade exams use the 2017 NEC, the 2018 IBC/IRC and the 2018 UPC/UMC; a newer book gives some wrong answers.
- Tab your books with permanent tabs before exam day. Sticky notes are removed at check-in, and you can't write in the books.
- OSHA 1926 isn't allowed in the room, but every trade exam has a safety section from it. Learn the common numbers (fall protection at 6 ft, ladders 3 ft above the landing, trenches 5 ft).
- Formwork (12) and cutting (10) are almost 40% of the exam and come mostly from references you can't bring in: form pressure, shoring and sawcut joint timing and spacing.
- Tab IBC Chapter 19 and ACI 318 cover, curing and testing sections for the concrete and reinforcement questions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Building Code (IBC)Essential
Allowed in the exam room. The base for commercial construction questions.
ICC store (opens in a new tab)Read free (opens in a new tab)
ACI 318: Building Code Requirements for Structural Concrete (2011 or 2014)
Allowed in the room for concrete questions.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Not allowed in the room, but every Nevada trade exam has safety questions written from it: fall protection, scaffolds, ladders, excavations.
Official reference list (as published by the testing agency)
- International Building Code (IBC), 2018 (allowed in the exam room)
- ACI 318-11 or 318-14, Building Code Requirements for Structural Concrete (allowed in the exam room)
- 29 CFR Part 1926, OSHA Construction (not allowed in the room)
- ACI SP-4 Formwork for Concrete; Contractor's Guide to Quality Concrete Construction; Pipe and Excavation Contracting; Concrete Construction sawcutting articles (not allowed in the room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Safety | 6 | |
| Concrete-Earthwork | 7 | |
| Concrete | 15 | |
| Concrete-Reinforcement | 10 | |
| Concrete-Formwork | 12 | |
| Concrete-Cutting | 10 |
Exam day details
- Administered by PSI Services for the Nevada State Contractors Board (NSCB).
- Fee: $95 to PSI for one exam, $140 for a trade exam plus the CMS. NSCB application and license fees are separate.
- 60 questions in 2 hours; 42 correct (70%) to pass.
- Open book: bring your own copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them; sticky notes are removed.
- PSI may add up to 10 unscored trial questions, which count against your time.
- If you fail, wait 2 weeks to retake. You get three attempts, and you must pass within 6 months of filing your application; a third failure voids the application.
- Every Nevada contractor license needs both the Construction Management Survey (business and law) and the trade exam for the classification, plus 4 years of experience in the last 15.
Frequently asked questions
What's on the Nevada C-5 concrete exam?
60 questions: concrete 15, formwork 12, reinforcement 10, cutting 10, earthwork 7 and safety 6.
What books can I bring to the C-5 exam?
The 2018 IBC and ACI 318 (2011 or 2014). Formwork, sawcutting and OSHA questions come from references you can't bring in.
Do I also need the business and law exam?
Yes. Every Nevada contractor license also needs the Construction Management Survey (CMS) business and law exam.
Free questions with answers
Show all 10 free questions and answers
A C-5 contractor is pouring the interior slab-on-ground for a new retail store. Under IBC 1907.1, what is the minimum thickness of a concrete floor slab supported directly on the ground?
Answer: 3-1/2 inches
IBC 1907.1 sets the minimum thickness of concrete floor slabs supported directly on the ground at 3-1/2 inches. The same section requires a 6-mil polyethylene vapor retarder with joints lapped at least 6 inches between the base course or subgrade and the slab, unless an exception applies. 4 inches is a common specification, not the code minimum.
Reference: 2018 International Building Code, Section 1907.1
During an elevated structural slab pour that requires special inspection, which task in IBC Table 1705.3 must the special inspector perform continuously?
Answer: Making strength-test cylinders and testing slump, air and temperature
IBC Table 1705.3, Item 6 (fabricate specimens for strength tests and perform slump, air content and temperature tests at placement) is a continuous special inspection, as is Item 7 (inspecting placement). Verifying the design mix (Item 5), curing (Item 8) and cast-in anchors (Item 3) are periodic. Look for the X in the Continuous column of the table.
Reference: 2018 International Building Code, Table 1705.3, Item 6
No specific design is provided for the continuous concrete footing under the bearing walls of a two-story light-frame building (two floors supported). Using IBC Table 1809.7, what footing size is permitted?
Answer: 15 in. wide x 6 in. thick
IBC Table 1809.7 lists prescriptive footings for light-frame walls: 1 floor, 12 in. wide x 6 in. thick; 2 floors, 15 in. x 6 in.; 3 floors, 18 in. x 8 in. A roof may be supported in addition to the stated floors. Depth must still meet 1809.4 (at least 12 in. below undisturbed ground) and frost protection under 1809.5.
Reference: 2018 International Building Code, Table 1809.7
A crane is flying a 2-yard concrete bucket to a column form. Under 29 CFR 1926.701, which rule applies to the crew?
Answer: No employee may work under the bucket while it is raised or lowered
29 CFR 1926.701(e)(1) prohibits employees from working under concrete buckets while they are being elevated or lowered into position, and 1926.701(e)(2) requires routing elevated buckets so no employee, or the fewest employees, are exposed. 1926.701(d) prohibits riding concrete buckets under any condition. Hard hats do not make working under a suspended load acceptable.
Reference: 29 CFR Part 1926, 1926.701(d) and (e)
A prescriptive concrete basement wall under IBC 1807.1.6.2 uses No. 6 vertical bars. What minimum concrete cover is required from the outside (soil) face of the wall?
Answer: 2 inches
IBC 1807.1.6.2 requires cover from the outside face of not less than 1-1/2 inches for No. 5 bars and smaller and 2 inches for larger bars, so No. 6 bars need 2 inches. Cover from the inside face must be at least 3/4 inch. 3 inches is the ACI 318 value for concrete cast directly against earth, which a formed wall is not.
Reference: 2018 International Building Code, Section 1807.1.6.2
Ironworkers have tied a 24-ft-tall column cage that will stand on its own for two days before the column forms are set. Under 29 CFR 1926.703(d)(1), what is required?
Answer: It must be supported so it cannot overturn or collapse
29 CFR 1926.703(d)(1) requires reinforcing steel for walls, piers, columns and similar vertical structures to be adequately supported to prevent overturning and collapse. Tall cages are top-heavy and can fall in wind or when bumped, so guying or bracing is needed. Signs and keep-out distances do not satisfy the requirement.
Reference: 29 CFR Part 1926, 1926.703(d)(1)
A 14-ft-tall wall form is filled so fast that the concrete is still fully fluid at the bottom. Assuming full liquid head pressure for normal-weight concrete at 150 lb/cu ft, what is the lateral pressure at the bottom of the form?
Answer: 2,100 psf
Full liquid head pressure = unit weight x depth = 150 x 14 = 2,100 psf at the bottom, dropping to zero at the top; this is the maximum lateral pressure fresh concrete can exert. 1,050 psf is the average pressure over the height, 874 psf uses the unit weight of water (62.4 x 14), and 4,200 psf doubles the result. Forms designed for this pressure meet the 1926.703(a)(1) duty to resist all reasonably anticipated lateral loads.
Reference: General trade practice, Formwork design: lateral pressure of fresh concrete, full liquid head (w x h)
The specifications for a suspended slab say nothing about when forms may be stripped. Under 29 CFR 1926.703(e)(1), what is an acceptable basis for deciding the slab can support itself?
Answer: Results of an appropriate ASTM compressive strength test
29 CFR 1926.703(e)(1) allows forms and shores (other than slab-on-grade and slip forms) to be removed only when the employer determines the concrete has gained enough strength to support its weight and superimposed loads, based on either (i) removal conditions in the plans and specifications that have been followed, or (ii) proper testing with an appropriate ASTM compressive-strength method. Time alone, tapping or scratching are not listed bases.
Reference: 29 CFR Part 1926, 1926.703(e)(1)(ii)
A contractor is laying out sawcut contraction joints in a 5-inch-thick slab on grade. Using NRMCA's guideline that maximum joint spacing be 24 to 36 times the slab thickness, what spacing range results?
Answer: 10 to 15 feet
24 x 5 in. = 120 in. = 10 ft and 36 x 5 in. = 180 in. = 15 ft, so 10 to 15 ft. NRMCA CIP 6 also recommends limiting joint spacing to a maximum of 15 ft and keeping panels square or nearly so. '24 to 36 feet' forgets to multiply by the thickness and convert inches to feet.
Reference: NRMCA Concrete in Practice, CIP 6 - Joints in Concrete Slabs on Grade (How to construct joints, item a)
An operator will spend 6 hours of a shift cutting a curb outdoors with a handheld power saw that has an integrated water feed. Under 29 CFR 1926.1153 Table 1, what respiratory protection is required?
Answer: A respirator with an APF of at least 10
Table 1, row (ii), handheld power saws: use a saw with an integrated water system that continuously feeds the blade. Outdoors, no respirator is needed for 4 hours or less per shift, but more than 4 hours requires APF 10. Indoors or in an enclosed area, APF 10 is required for any duration. Six hours outdoors is over 4 hours, so APF 10.
Reference: 29 CFR Part 1926, 1926.1153(c)(1), Table 1, row (ii)
Sources
- PSI: Nevada Contractors "C" Classification Candidate Information Bulletin (3/25/2026) (opens in a new tab)
- Nevada State Contractors Board: License examinations (opens in a new tab)
Questions last verified October 23, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.