Requirements at a glance
| Agency | Nevada State Contractors Board (NSCB); exams by PSI |
|---|---|
| Experience | 4 years as a journeyman, foreman, supervisor or contractor in the classification within the last 15 years (up to 3 years can be education) |
| Exams | 55 questions, 2 hours, 70%, closed book, plus the Construction Management Survey (business and law) |
| Books allowed | None (closed book) |
| Fees | $95 per PSI exam ($140 for a trade exam plus the CMS), plus NSCB application and license fees and a bond |
Qualifying individuals for a Nevada C-4 Painting and Decorating license (paints, coatings, wallcoverings, drywall, metal studs and acoustical tile).
Official links
How to get licensed, step by step
Pick your classification
Find the NSCB classification that covers your work, and name the qualifying individual (an owner or a qualified employee) with 4 years of experience in it.
Apply to the NSCB
Submit the application with your experience verification, financial statement and fingerprints. The Board sends you an exam eligibility notice once it accepts your qualifications.
Schedule the CMS and C-4 trade exam with PSI
Book both exams with PSI. Bring the allowed references, tabbed. If you fail, wait 2 weeks; you get three attempts and must pass within 6 months of filing.
Schedule with PSI (Nevada contractors) (opens in a new tab)PSI: Nevada "C" classification bulletin and outlines (opens in a new tab)
Post your bond and get licensed
After you pass, the Board sets your monetary limit and bond amount ($1,000 to $500,000). File the bond and pay the license fee to receive your license.
How to prepare
- Bring the exact editions on PSI's outline. Nevada's trade exams use the 2017 NEC, the 2018 IBC/IRC and the 2018 UPC/UMC; a newer book gives some wrong answers.
- Tab your books with permanent tabs before exam day. Sticky notes are removed at check-in, and you can't write in the books.
- OSHA 1926 isn't allowed in the room, but every trade exam has a safety section from it. Learn the common numbers (fall protection at 6 ft, ladders 3 ft above the landing, trenches 5 ft).
- Surface preparation is the biggest section (12): cleaning, sanding, priming and moisture checks before coating.
- Know OSHA spray-finishing, ladder and respirator basics and the EPA lead rules for pre-1978 homes.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Not allowed in the room, but every Nevada trade exam has safety questions written from it: fall protection, scaffolds, ladders, excavations.
Official reference list (as published by the testing agency)
- Painting & Decorating Craftsman's Manual and Textbook, PDCA (not allowed in the room)
- 29 CFR Part 1926, OSHA Construction (not allowed in the room)
- Gypsum Construction Handbook, 7th ed., USG (not allowed in the room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Materials | 8 | |
| Surface Preparation | 12 | |
| Application | 7 | |
| Tools | 6 | |
| Problems and Prevention | 4 | |
| Safety | 5 | |
| Drywall | 5 | |
| Color | 3 | |
| Sheet Metal | 5 |
Exam day details
- Administered by PSI Services for the Nevada State Contractors Board (NSCB).
- Fee: $95 to PSI for one exam, $140 for a trade exam plus the CMS. NSCB application and license fees are separate.
- 55 questions in 2 hours; 39 correct (70%) to pass.
- Closed book: no references are allowed in the room.
- PSI may add up to 10 unscored trial questions, which count against your time.
- If you fail, wait 2 weeks to retake. You get three attempts, and you must pass within 6 months of filing your application; a third failure voids the application.
- Every Nevada contractor license needs both the Construction Management Survey (business and law) and the trade exam for the classification, plus 4 years of experience in the last 15.
Frequently asked questions
Is the Nevada C-4 painting exam open book?
No. Unlike most Nevada trade exams, C-4 is closed book, so you need to know coatings, surface preparation and safety rules from memory.
What's on the Nevada C-4 exam?
55 questions: surface preparation 12, materials 8, application 7, tools 6, safety 5, drywall 5, sheet metal 5, problems and prevention 4 and color 3.
Do painters need EPA lead certification in Nevada?
Yes, for paid work that disturbs paint in pre-1978 homes and child-occupied facilities: the firm must be EPA lead-safe certified with a certified renovator. That's separate from the NSCB license.
Free questions with answers
Show all 10 free questions and answers
A crew is scraping the exterior siding of a 1965 house under the EPA Renovation, Repair and Painting (RRP) rule. How far beyond the perimeter of the surfaces being worked must the ground be covered with plastic sheeting, unless the property line prevents it?
Answer: 10 feet
40 CFR 745.85(a)(2)(ii)(C) requires the ground to be covered with impermeable sheeting extending 10 feet beyond the work perimeter, or farther if needed to collect falling debris. Six feet is the interior floor-covering distance in 745.85(a)(2)(i)(D). Twenty feet is the distance within which exterior doors and windows must be closed in 745.85(a)(2)(ii)(A).
Reference: 40 CFR Part 745 (EPA Lead RRP Rule), 40 CFR 745.85(a)(2)(ii)(C)
Which list orders common architectural paint sheens from lowest gloss to highest gloss?
Answer: Flat, eggshell, satin, semi-gloss
Sheen rises from flat (matte) to eggshell, then satin, semi-gloss and gloss. Higher sheens contain more binder relative to pigment, which makes them easier to wash but quicker to show surface flaws. Eggshell sits just above flat, and satin sits between eggshell and semi-gloss.
Reference: General trade practice, Sheen levels (flat through gloss)
Interior trim has an old, hard, high-gloss alkyd enamel and will be repainted with latex. What preparation gives the new coat the best adhesion?
Answer: Clean, degloss, then use a bonding primer
Hard glossy films give a new coat no profile to grip. Sherwin-Williams' Problem Solver says to wash off contamination, sand glossy surfaces dull, and use a bonding primer if the surface is still hard and slick. Painting straight over gloss is a classic cause of peeling. Open-flame softening is a fire hazard and, on pre-1978 work, is prohibited by the RRP rule.
Reference: Sherwin-Williams Problem Solver (painting contractors), Peeling - Over Hard, Slick Surfaces
A 14 ft × 12 ft bedroom has 8-ft walls, one 3 ft × 7 ft door and two 3 ft × 5 ft windows. The walls (only) get two coats of paint covering 350 sq ft per gallon. About how many gallons are needed?
Answer: 2.1 gal
Perimeter = 2 × (14 + 12) = 52 ft. Wall area = 52 × 8 = 416 sq ft. Openings = 21 (door) + 2 × 15 (windows) = 51 sq ft, so net = 365 sq ft. Two coats = 730 sq ft ÷ 350 = about 2.1 gallons. 2.4 gal skips the deductions (832 ÷ 350). 1.0 gal is one coat. 3.0 gal mistakenly adds two coats of the 168 sq ft ceiling.
Reference: General trade practice, Estimating paint quantity: area ÷ spreading rate × coats
An airless spray tip is stamped "517." Under the common tip-numbering system, what does this mean?
Answer: 10-inch fan, 0.017-inch orifice
Graco explains that the first digit, multiplied by 2, gives the fan width in inches when sprayed 12 inches from the surface (5 × 2 = 10 inches), and the last two digits give the orifice size in thousandths of an inch (0.017 inch). Reading the first digit directly as the fan width forgets to double it. A 0.170-inch orifice is ten times too large. A 317 tip has the same orifice but a 6-inch fan, so it lays down a heavier film than a 517.
Reference: Graco: Choosing & Understanding Airless Spray Tips, Tip Selection: Understand The Numbers
A painter sets up an extension ladder with a working length of 20 feet to the top support point. How far from the wall should the foot of the ladder be placed to meet OSHA's angle rule?
Answer: 5 feet
29 CFR 1926.1053(b)(5)(i) requires non-self-supporting ladders to be set so the horizontal distance from the top support to the foot is about one-quarter of the working length: 20 ÷ 4 = 5 feet (the 4:1 rule). 2.5 feet is the 1/8 ratio, which applies only to wood job-made ladders with spliced side rails (b)(5)(ii). When the ladder is used to reach an upper landing, the rails must also extend at least 3 feet above it (b)(1).
Reference: 29 CFR Part 1926 (OSHA Construction), 29 CFR 1926.1053(b)(5)(i)
Fresh paint on exterior siding has dried with a wrinkled, rippled surface. What usually causes wrinkling?
Answer: Paint applied too heavily
Sherwin-Williams' Problem Solver lists paint applied too heavily as the first cause of wrinkling: the surface skins over while the soft paint underneath stays uncured. Very hot or cool, damp conditions, dew on uncured paint, and recoating before the first coat has cured do the same thing. Repair by scraping or sanding smooth, priming bare spots and reapplying at the label spreading rate. Thin films and porous surfaces cause poor hide or flashing, not wrinkles.
Reference: Sherwin-Williams Problem Solver (painting contractors), Wrinkling
Gypsum board is being installed as a horizontal diaphragm ceiling under IBC 2508.6. What is the maximum fastener spacing at all supports, including perimeter blocking?
Answer: 7 inches on center
IBC 2508.6.4 limits fasteners in gypsum board diaphragm ceilings to 7 inches on center at all supports, including perimeter blocking, and no more than 3/8 inch from edges and ends. Other diaphragm rules: boards run perpendicular to framing with end joints staggered off the same joist (2508.6.2), perimeter blocking is at least 2x6 laid flat (2508.6.3), and the aspect ratio is limited to 1-1/2:1 (2508.6.1). 12 and 16 inches are typical non-diaphragm screw spacings on ceilings and walls.
Reference: 2018 International Building Code, Section 2508.6.4
A decorator lightens a deep blue by adding white to it. In color terms, what is the result called?
Answer: A tint
Adding white to a hue makes a tint, which is lighter in value. Adding black makes a shade, and adding gray makes a tone, both of which darken or soften the color. A complement is the hue opposite on the color wheel.
Reference: General trade practice, Tints, shades and tones
A crew is hanging gypsum board on 25-gauge (18-mil) non-structural steel studs. Which drywall screw type is made for this framing?
Answer: Type S
Type S screws have a sharp point and fine threads that pierce and hold in light-gauge steel studs. They are covered by ASTM C1002, which IBC Table 2506.2 lists for steel screws. Heavier steel framing uses self-drilling Type S-12 screws (ASTM C954). Type W has coarse threads for wood framing, and Type G attaches gypsum to gypsum. Type X is a fire-rated board, not a screw.
Reference: 2018 International Building Code, Table 2506.2 (steel screws ASTM C954; C1002)
Sources
- PSI: Nevada Contractors "C" Classification Candidate Information Bulletin (3/25/2026) (opens in a new tab)
- Nevada State Contractors Board: License examinations (opens in a new tab)
Questions last verified October 23, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.