The Minnesota DLI manufactured home installer exam: 90 questions on HUD installation standards (24 CFR 3285), Minnesota Rules 1350 and Statutes 327B. Open book, 5.5 hours, 70% to pass.

Questions
90
Time limit
5.5 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Federal and State Standards, Rules and Regulations

Under 24 CFR 3285.2(b), which situation requires the installation design to be prepared and certified by a professional engineer or registered architect?

Requirements at a glance

AgencyMinnesota Department of Labor and Industry (DLI)
ExperienceThe business is licensed; one qualifying person (owner, general partner, officer or managing employee) must pass the exam
Exam90 questions (about 50 scored on the outline), 5.5 hours, 70% to pass
Books allowedNone of your own: DLI supplies the references listed in its exam guide and a calculator
Fees$50 per personal-license exam (Minn. Stat. 326B.092), plus application and license fees

Manufactured home installation businesses: the owner, partner, officer or managing employee who qualifies the DLI license must pass this exam.

How to get licensed, step by step

  1. Apply to DLI

    Send DLI your manufactured home installer license application. The license also requires a $2,500 surety bond and liability and workers' compensation certificates; the license fee is $180.

    Minnesota Department of Labor and Industry (DLI) (opens in a new tab)DLI: manufactured home installer license (opens in a new tab)

  2. Schedule your exam

    After DLI approves your application, you schedule the exam in DLI's iMS system. DLI gives exams at its St. Paul office (Tuesday to Thursday) and at outstate sites including Duluth, Mankato, Rochester and St. Cloud.

    DLI: license exam schedule (opens in a new tab)

  3. Take the exam

    You have 5.5 hours and need 70%. The exam is open book with DLI-supplied references; no personal books, notes or electronic devices.

    DLI: manufactured home installer license (opens in a new tab)DLI Residential Examination Guide (PDF) (opens in a new tab)

  4. Results and retakes

    DLI mails results in about 2 weeks. If you fail, wait 30 days after receiving results before reapplying.

    DLI: license exam schedule (opens in a new tab)

How to prepare

  • Learn the HUD Model Manufactured Home Installation Standards (24 CFR 3285): site preparation, foundations and piers, anchoring, multi-section connections, utilities and skirting, plus Minnesota Rules 1350 and Statutes 327B.
  • DLI's content outline has six areas (federal and state rules, placement and site preparation, stabilizing, multi-section connections, site utilities and skirting). Only about 50 of the 90 questions are scored on that outline; the rest cover business and law.
  • Every DLI exam is open book, but with DLI-supplied references only: a code book without tabs, the DLI laws-and-rules booklet and a desk calculator. You cannot bring your own books, so practice finding answers fast rather than relying on tabs.
  • DLI publishes no topic weights, so our topic split is an estimate. Several versions of each exam are in use, and some questions ask for more than one answer or the choice that does not apply.
  • Drill the 24 CFR 3285 installation standards: pier and footing spacing, anchoring, multi-section connections and utility testing.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the HUD installation standards. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • HUD Manufactured Home Construction and Safety Standards (24 CFR 3280), Manufactured Home Procedural and Enforcement Regulations (24 CFR 3282) and Model Manufactured Home Installation Standards (24 CFR 3285)
  • Minnesota Rules chapter 1350 (manufactured homes) and Minnesota Statutes chapter 327B, plus Rules 1300, 1303, 1315 and 4714 and the 2006 IRC for filling and compaction, as listed in the DLI exam guide

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Federal and State Standards, Rules and Regulations8
Placement and Site Preparation8
Stabilizing System8
Multi-Section Connections and Alternate Construction10
Site Utilities Installation and Testing10
Skirting and Perimeter Enclosure and Ventilation6

Exam day details

  • Administered by the Minnesota Department of Labor and Industry (DLI), which gives its own exams.
  • Fee: $50 per personal-license exam (Minn. Stat. 326B.092). Application and license fees are separate.
  • 90 questions in 5.5 hours; 70% to pass. DLI's content outline covers 50 scored questions; the rest cover business, law and technical topics DLI does not itemize.
  • The license is held by the business: one qualifying person (owner, general partner, officer or managing employee) must pass the exam. DLI lists a $180 license fee and a $2,500 surety bond.
  • DLI publishes the outline but no topic weights, so our topic split of the 50 scored questions is an estimate. The section-to-code reference pairing in DLI's guide is printed misaligned, so we followed 24 CFR 3285 and Rules 1350 for each outline area.
  • Open book with DLI-supplied references: you get the code book (without tabs), the DLI laws-and-rules booklet and a desk calculator. You cannot bring your own books, notes or electronic devices.
  • DLI gives the exam at its St. Paul office and outstate sites, scheduled after DLI approves your application. The time limit is 5.5 hours; the passing score is 70%.
  • Results are mailed in about 2 weeks. If you fail, wait 30 days after receiving results before reapplying.
  • Some questions ask you to pick more than one answer (the question says how many) or the one choice that does not apply. Several versions of each exam are in use.

Note: DLI's guide (06/2020) prints the outline but no topic weights, so our split is an estimate. Questions follow 24 CFR 3285, 3280 and 3282 and Minnesota Rules 1350; Rules 1315 and the 2006 IRC that DLI cites were not on file.

Frequently asked questions

How many questions are on the Minnesota manufactured home installer exam?

90 questions in 5.5 hours; 70% to pass. About 50 are scored on DLI's content outline.

Which standards are tested?

The HUD standards in 24 CFR 3280, 3282 and 3285, Minnesota Rules 1350 and Statutes 327B, plus the other rules DLI lists in its guide.

Who takes the exam?

The business holds the license; one qualifying person (owner, general partner, officer or managing employee) must pass.

Free questions with answers

Show all 10 free questions and answers
  1. Under 24 CFR 3285.2(b), which situation requires the installation design to be prepared and certified by a professional engineer or registered architect?

    Answer: An alternative foundation system, such as a basement or perimeter support foundation, is used

    Section 3285.2(b)(2) requires a professional engineer or registered architect when an alternative foundation or anchoring system is used, including basement and perimeter support designs. Following the manufacturer's approved tables as written does not trigger that requirement.

    Reference: 24 CFR Part 3285 (Model Manufactured Home Installation Standards), Section 3285.2(b)(2)

  2. Which person may verify an installation as an inspector under the HUD installation program, considering 24 CFR 3286.511?

    Answer: An ICC-certified inspector with no financial interest in the sale beyond the inspection fee

    Section 3286.511(a)(5) lists ICC-certified inspectors as qualified, but (b) requires the inspector to be independent of the manufacturer, retailer, installer and anyone else with a monetary interest in the sale other than the inspection fee. The other choices fail that independence test.

    Reference: 24 CFR Part 3286 (Manufactured Home Installation Program), Section 3286.511(a)(5) and (b)

  3. A torque probe reads 300 inch-pounds at the depth of the planned ground anchor helix. Using the Table to 24 CFR 3285.202, which soil classification and allowable bearing pressure apply?

    Answer: Class 4A, 1,000 psf

    The table lists torque probe values of 276-350 inch-pounds for Class 4A (1,000 psf). Class 3 is 351-550 inch-pounds, Class 4B is 175-275, and Class 2 is more than 550. A reading of 300 therefore falls in Class 4A.

    Reference: 24 CFR Part 3285 (Model Manufactured Home Installation Standards), Table to Section 3285.202

  4. The soil at a home site appears to be peat or uncompacted fill. Who must determine the soil classification and maximum allowable bearing capacity under 24 CFR 3285.202(f)?

    Answer: A registered professional geologist, engineer or architect

    Section 3285.202(f) requires a registered professional geologist, registered professional engineer or registered architect to classify soil that appears to be peat, organic clay or uncompacted fill, or that has unusual conditions. The 1,500 psf default does not apply to such soil.

    Reference: 24 CFR Part 3285 (Model Manufactured Home Installation Standards), Section 3285.202(f)

  5. Under Minnesota Rules 1350.2700, subpart 5, a site-built concrete block frame pier will be 48 inches high. It is not a listed or engineer-designed support, and the home is not elevated as described in subpart 6. What is the minimum construction the rule requires?

    Answer: Double blocks, interlocked, capped with a 4 x 16 x 16 inch solid concrete block or equivalent

    Minn. R. 1350.2700, subp. 5 allows single-stacked 8 x 16 inch blocks with a 2 x 8 x 16 inch cap only for piers under 40 inches. Piers from 40 to 80 inches (and corner piers over three blocks high) must be double blocked, interlocked and capped with a 4 x 16 x 16 inch solid concrete block or equivalent (item B). Mortar and reinforcing bars are required only over 80 inches (item C). The federal standard reaches the same result for a 48-inch pier: 24 CFR 3285.306(b) requires double interlocked blocks from 36 to 67 inches.

    Reference: Minnesota Rules, chapter 1350, Minn. R. 1350.2700, subp. 5; 24 CFR 3285.306(b)

  6. What does 24 CFR 3285.303(c)(2) require for multi-section manufactured homes?

    Answer: Center beam or mating wall support

    Section 3285.303(c)(2) says center beam/mating wall support is required for multi-section homes, with designs consistent with Tables 2 and 3 to 3285.303 and Figures A, B and C to 3285.310.

    Reference: 24 CFR Part 3285 (Model Manufactured Home Installation Standards), Section 3285.303(c)(2)

  7. Before the exterior close-up of a multi-section home is complete, a gap of one inch remains between structural elements at the mate-line. Under 24 CFR 3285.802(c), which condition applies?

    Answer: The sections must touch, the gasket must seal, and the gap must be shimmed and closed before close-up

    Section 3285.802(c) allows gaps not exceeding one inch before close-up only if the gaps are closed before close-up is completed, the sections are in contact, and the mating gasket provides a proper seal. Such gaps must be shimmed with dimensional lumber, and longer fasteners are used to reach the receiving member.

    Reference: 24 CFR Part 3285 (Model Manufactured Home Installation Standards), Section 3285.802(c)(1)-(3)

  8. At what local water supply pressure does 24 CFR 3285.603(b) require a pressure-reducing valve to be installed for the home?

    Answer: Above 80 psi

    Section 3285.603(b) says that when the local water supply pressure to the manufactured home exceeds 80 psi, a pressure-reducing valve must be installed.

    Reference: 24 CFR Part 3285 (Model Manufactured Home Installation Standards), Section 3285.603(b)

  9. During factory construction under 24 CFR 3280.612(a), the water distribution system is pressure tested with air or water at what pressure and for how long?

    Answer: 80 psi, plus or minus 5 psi, for 15 minutes without loss of pressure

    Section 3280.612(a) (factory construction standard) requires all water piping to be subjected to air or water at 80 psi plus or minus 5 psi for 15 minutes with no loss of pressure, using water from a potable source. The on-site test is different: 3285.603(e) refers to the piping manufacturer's testing instructions, and Minn. R. 1350.3400, subp. 1 requires the piping to be proved airtight at not less than its minimum working pressure.

    Reference: 24 CFR Part 3280 (Manufactured Home Construction and Safety Standards), Section 3280.612(a)

  10. How does 24 CFR 3285.5 define skirting?

    Answer: A weather-resistant material enclosing the perimeter under the living area, from the bottom of the home to grade

    Section 3285.5 defines skirting as a weather-resistant material used to enclose the perimeter, under the living area of the home, from the bottom of the manufactured home to grade.

    Reference: 24 CFR Part 3285 (Model Manufactured Home Installation Standards), Section 3285.5 (Skirting)

Sources

Questions last verified November 9, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.