Massachusetts Systems Contractor Exam (Part 1): Practice Test & Licensing Guide

Part 1 of the Massachusetts systems contractor exam: 70 questions in 180 minutes on advanced electrical theory, NEC alarm requirements, intrusion detection and notification, and fire detection and notification. Open book, 70% (49) to pass.

Questions
70
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Advanced Elec Knowledge and Elec Theory

A supervised 24 VDC control circuit has a total series resistance of 800 ohms. How much current flows when the circuit is energized?

Requirements at a glance

AgencyBoard of State Examiners of Electricians (Division of Occupational Licensure); exams by PSI
LicenseSystems Contractor
FormatPart 1: 70 questions, 180 minutes, open book, 70% to pass
ExamsPart 1 (70 questions, 180 minutes), then Part 2 Business and Law (50 questions, 120 minutes)
Fees$80 to PSI for Part 1 and $55 for Part 2, plus the Board application and license fee

Massachusetts Systems Technicians with one year of experience applying for a Systems Contractor license from the Board of State Examiners of Electricians.

How to get licensed, step by step

  1. Apply to the Board

    Apply through the Board with your education and work hours, a CORI authorization and a 15-hour code update certificate. Review takes up to 30 days. Approval lasts 12 months.

    Board of State Examiners of Electricians (opens in a new tab)

  2. Schedule the systems contractor exam with PSI

    PSI emails an exam confirmation notice after approval. Test at a PSI site in Auburn, Boston, Fall River, Lawrence or West Springfield. Cancel at least 2 days ahead.

    Schedule with PSI (Massachusetts electricians) (opens in a new tab)

  3. Pass both parts

    Each part is scored separately at 70%. If you fail one, retake only that part, up to 6 times within a year of approval.

    Schedule with PSI (Massachusetts electricians) (opens in a new tab)

  4. Get licensed

    Your scores go to the Division of Occupational Licensure. Pay the license fee in the eLIPSE portal to get your license.

    Board of State Examiners of Electricians (opens in a new tab)

How to prepare

  • Massachusetts adopted the 2026 NEC with state amendments (527 CMR 12.00) effective 4/24/2026. The PSI bulletin names no NEC year and adds code items about seven months after adoption, so check the bulletin for your test date.
  • Bring the NEC, the Massachusetts amendments and NFPA 72. Highlighting, underlining and margin notes are allowed before the exam; only a silent, non-programmable calculator is allowed.
  • Fire detection and notification is 31 of 70 questions, with NEC alarm requirements (15) and intrusion detection and notification (15) next.
  • Part 2 is the same Business and Law exam master electricians take.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • NFPA 70: National Electrical Code (NEC), edition adopted by the BoardEssential

    Allowed in the exam room. Massachusetts adopted the 2026 edition with state amendments effective 4/24/2026; confirm the tested edition in your PSI bulletin.

    NFPA store (opens in a new tab)Free online access (opens in a new tab)

  • NFPA 72: National Fire Alarm and Signaling Code

    Allowed in the exam room. Alarm systems are 6 questions on each electrician Part 1, and it is the core reference for the systems exams.

  • 527 CMR 12.00: Massachusetts Electrical Code (state amendments to the NEC)

    Allowed in the exam room. The Massachusetts amendments to the NEC.

Official reference list (as published by the testing agency)
  • Massachusetts Electrical Code, 527 CMR 12.00 (state amendments to the NEC)
  • National Electrical Code (NFPA 70), the edition adopted by the Board
  • NFPA 72 National Fire Alarm and Signaling Code
  • Ugly's Electrical References, American Electricians' Handbook, Fire Alarm Signaling Systems Handbook and alarm technician manuals (listed by PSI as sources, not allowed in the exam room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Advanced Elec Knowledge and Elec Theory9
NEC Alarm Requirements15
Intrusion Detection and Notification15
Fire Detection and Notification31

Exam day details

  • Administered by PSI Services for the Massachusetts Board of State Examiners of Electricians.
  • Fee: $80 to PSI for Part 1 and $55 for Part 2. Board application and license fees are separate.
  • 70 questions in 180 minutes; 70% (49) to pass. Part 2 is the Business and Law exam, which has its own practice exam.
  • Open book and two parts. Each part is scored on its own and you must pass both. Journeyman Part 2 is the Applied exam; Master Part 2 is Business and Law.
  • If you fail a part, you can retake just that part up to 6 times within 1 year of your application approval date. Application approval lasts 12 months. Under 237 CMR 14.02 (amended 11/21/2025), after 3 failed attempts the Board requires proof of a Board-approved exam review or prep course, and after 6 you must repeat the required education hours.
  • Allowed in the exam room: the adopted NEC, the Massachusetts amendments (527 CMR 12.00), NFPA 72, the Board's rules (237 CMR) and the listed Massachusetts laws. Highlighting and underlining are allowed, and so are handwritten notes in the margins before the exam; only a silent, non-programmable calculator is allowed.
  • Exams are scheduled daily at PSI sites in Auburn, Boston, Fall River, Lawrence and West Springfield. Cancel at least 2 days ahead or you forfeit the fee.
  • The Board approves your application first (high school diploma, 600 hours of journeyman education, 4 years and 8,000 hours of work, a CORI check and a 15-hour code update certificate; masters need a 150-hour master course and 1 year as a Massachusetts journeyman). Applications take up to 30 days.
  • Security system installers also need a Security Clearance Certificate (S-License), per the PSI bulletin.

Note: 527 CMR 12.00 adopted the 2026 NEC with Massachusetts amendments, effective 4/24/2026. The PSI bulletin (effective 9/30/2026) names no NEC year, but says new code items can be added seven months after a code takes effect, which is about late November 2026. Our questions follow the 2026 NEC; check your PSI bulletin for the edition on your test date.

Frequently asked questions

What is on the Systems Contractor Part 1 exam?

70 questions: fire detection and notification 31, NEC alarm requirements 15, intrusion detection and notification 15, and advanced electrical knowledge and theory 9.

What is Part 2?

Business and Law: 50 questions in 120 minutes, the same exam master electricians take.

Is it open book?

Yes. Bring 527 CMR 12.00, the NEC and NFPA 72.

Free questions with answers

Show all 10 free questions and answers
  1. A supervised 24 VDC control circuit has a total series resistance of 800 ohms. How much current flows when the circuit is energized?

    Answer: 30 mA

    I = V / R = 24 / 800 = 0.030 A, or 30 mA. Inverting the ratio (800 / 24 = 33.3) and multiplying (24 x 800 = 19,200, misread as 19.2) are the two usual mistakes; neither is a current from Ohm's law.

    Reference: Ohm's law and basic circuit analysis, I = V/R, series circuit

  2. NEC Chapter 9, Table 8 lists 14 AWG solid uncoated copper at 3.07 ohms per 1000 ft at 75 C. Using the equation in Note 2 to Table 8 (alpha for copper is 0.00323), what is the resistance per 1000 ft at 30 C?

    Answer: 2.62 ohms

    Note 2 gives R2 = R1 [1 + alpha (T2 - 75)]. With T2 = 30 C: 1 + 0.00323 x (30 - 75) = 1 - 0.1454 = 0.8546, so R2 = 3.07 x 0.8546 = 2.62 ohms. Cooler copper has lower resistance. Using +45 (T2 - 30 reversed) gives 3.51, and leaving the table value unchanged ignores the temperature difference.

    Reference: 2026 National Electrical Code (NFPA 70), Chapter 9, Table 8, Note 2

  3. A fire alarm branch-circuit disconnecting means must have red identification. What condition does 760.121(B)(4) place on that red identification?

    Answer: It must not damage the overcurrent device or obscure the manufacturer's markings

    760.121(B)(4) (and 760.41(B) for non-power-limited circuits) requires the disconnecting means to have red identification, be accessible only to qualified personnel and be identified as FIRE ALARM CIRCUIT, and states that the red identification shall not damage the overcurrent protective devices or obscure the manufacturer's markings. The code does not require a factory red handle, a reflective label of a set size or factory application.

    Reference: 2026 National Electrical Code (NFPA 70), 760.121(B)(4)

  4. A fire alarm control panel is to be fed from a dedicated 120 V branch circuit. Which statement about that circuit is correct?

    Answer: It must not be supplied through a GFCI or AFCI device

    760.121(B) requires that the branch circuit supply no other loads and not be supplied through ground-fault circuit interrupters or arc-fault circuit interrupters, so a nuisance trip cannot silently disable the panel. The location of the overcurrent device must be permanently identified at the control unit.

    Reference: 2026 National Electrical Code (NFPA 70), 760.121(B)(1)-(3)

  5. What is the smallest conductor size permitted in a multiconductor power-limited fire alarm cable on the load side of the PLFA power source?

    Answer: 26 AWG

    In the 2026 NEC the PLFA conductor-size rule moved from 760.142 to 722.171(B)(2): conductors in a multiconductor cable shall not be smaller than 26 AWG, and single conductors not smaller than 18 AWG. 26 AWG conductors are allowed only where spliced with a listed connector suitable for 26 AWG to 24 AWG or larger conductors that are terminated on equipment, or where terminated on equipment listed for 26 AWG. 18 AWG is the single-conductor minimum, not the cable minimum.

    Reference: 2026 National Electrical Code (NFPA 70), 722.171(B)(2) (formerly 760.142)

  6. A non-sprinklered warehouse office wing needs manual fire alarm boxes. Besides boxes at each exit, what additional rule applies under 907.4.2.1?

    Answer: Travel distance to the nearest box must not exceed 200 feet

    In buildings not protected by an automatic sprinkler system under 903.3.1.1 or 903.3.1.2, 907.4.2.1 requires additional manual boxes so the distance of travel to the nearest box does not exceed 200 feet (60,960 mm). The rule is a travel-distance limit, not a spacing or area ratio.

    Reference: 2021 International Building Code as amended by 780 CMR 10th ed., 907.4.2.1

  7. What are the maximum zone limits for a fire alarm zone on one floor under 907.6.4?

    Answer: 22,500 square feet, and no more than 300 feet in any direction

    907.6.4 requires each floor to be zoned separately, with a zone not exceeding 22,500 sq ft and a length not exceeding 300 feet in any direction (sprinkler zones are limited by NFPA 13). Zoning feeds the annunciator required by 907.6.4.1.

    Reference: 2021 International Building Code as amended by 780 CMR 10th ed., 907.6.4

  8. A designer is laying out NAC circuits for an employee work area that currently has only audible appliances. What does 907.5.2.3.1 require for the circuits?

    Answer: At least 20 percent spare capacity for future visible appliances

    907.5.2.3.1, Exception: where employee work areas have audible alarm coverage, the notification appliance circuits serving them must initially be designed with not less than 20 percent spare capacity so visible appliances can be added later for hearing-impaired employees. The 5 percent and 50 percent figures are not in this rule, and the exception exists precisely because employee areas may later need visible appliances.

    Reference: 2021 International Building Code as amended by 780 CMR 10th ed., 907.5.2.3.1 Exception

  9. A security contractor installs an electric lock on an egress door that uses a motion sensor on the egress side to release it. Under 1010.2.12, where must the manual unlocking device be?

    Answer: 40 to 48 in. above the floor and within 5 ft of the door, marked "PUSH TO EXIT"

    1010.2.12 (sensor release of electrically locked egress doors) requires a manual unlocking device 40 to 48 inches above the floor, within 5 feet of the secured doors, readily accessible and identified by a sign reading "PUSH TO EXIT." The sensor must be on the egress side and detect an approaching occupant.

    Reference: 2021 International Building Code as amended by 780 CMR 10th ed., 1010.2.12

  10. A delayed egress lock is on a door in a sprinklered building and the sprinkler system activates. What must the delay electronics do under 1010.2.13.1?

    Answer: Deactivate so free egress is immediate

    1010.2.13.1 requires the delay electronics to deactivate upon actuation of the automatic sprinkler system or automatic fire detection system, and also on loss of power to the lock, allowing immediate free egress. It also must be capable of deactivation at the fire command center.

    Reference: 2021 International Building Code as amended by 780 CMR 10th ed., 1010.2.13.1