Requirements at a glance
| Agency | Board of State Examiners of Plumbers and Gas Fitters (Division of Occupational Licensure); exams by PSI |
|---|---|
| License | Master Gas Fitter |
| Format | Part 1: 60 questions, 120 minutes; Part 2: 20 questions, 80 minutes, closed book, 70% to pass |
| Fees | $80 PSI exam fee; the license fee in eLIPSE is $52 (journeyman, gas fitter, LP gas installer), $78 (master plumber) or $97 (master gas fitter) |
Journeyman gas fitters applying for a Massachusetts master gas fitter license from the Board of State Examiners of Plumbers and Gas Fitters.
Official links
How to get licensed, step by step
Apply to the Board
Apply online through eLIPSE with your apprenticeship hours and education. The Board approves you, then PSI contacts you to schedule.
Board of State Examiners of Plumbers and Gas Fitters (opens in a new tab)
Schedule the master gas fitter exam with PSI
Test at a PSI site in Auburn, Boston, Fall River, Lawrence or West Springfield. Cancel at least 2 days ahead or you forfeit the fee.
Schedule with PSI (Massachusetts plumbers and gas fitters) (opens in a new tab)
Pass both parts
Each part is scored separately at 70%. Retake within 12 months of approval; after six failed attempts you must petition the Board in writing.
Schedule with PSI (Massachusetts plumbers and gas fitters) (opens in a new tab)
Get licensed
Pay the license fee in eLIPSE after you pass both parts.
Board of State Examiners of Plumbers and Gas Fitters (opens in a new tab)
How to prepare
- Both parts are closed book. Nothing is allowed in the room, so learn the code rules and numbers rather than where to find them.
- The editions are 248 CMR 3.00, 4.00, 5.00 and 11.00 (2021), 10.00 (2023 plumbing code), NFPA 54 (2012) and NFPA 58 (2011).
- Part 1 is gas piping, equipment and appliances (38), venting (15) and general regulations (7). Part 2 is gas piping (7), gas venting (8) and combustion, dilution and ventilation air (5).
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
248 CMR 3.00 to 11.00: Massachusetts plumbing and gas rulesEssential
Not allowed in the exam room (closed book). The core of both plumbing and gas exams: Uniform State Plumbing Code (10.00, 2023), Fuel Gas Code (4.00 and 5.00, 2021), 6.00, 7.00 and 11.00.
Massachusetts regulations (Cornell LII, free to read) (opens in a new tab)
NFPA 54 (2012) and NFPA 58 (2011)
Not allowed in the exam room (closed book). Model gas codes behind 248 CMR 4.00, 5.00 and 8.00.
MGL Chapter 142: Supervision of Plumbing
Not allowed in the exam room. Licensing, permits and the water heater rules.
Massachusetts General Laws (free to read) (opens in a new tab)
Official reference list (as published by the testing agency)
- 248 CMR 3.00 (2021), 4.00 (2021), 5.00 (2021), 6.00 (2014 amendments to NFPA 58), 7.00 (2014) and 11.00 (2021)
- NFPA 54 National Fuel Gas Code (2012) and NFPA 58 Liquefied Petroleum Gas Code (2011)
- MGL Chapter 142: Supervision of Plumbing, and the general provisions governing plumbing and gas work
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Regulations, Inspections, and Permits | 7 | |
| Gas Piping, Equipment, and Appliances | 38 | |
| Venting | 15 | |
| Gas Piping (Part 2) | 7 | |
| Gas Venting (Part 2) | 8 | |
| Combustion, Dilution, and Ventilation Air | 5 |
Exam day details
- Administered by PSI Services for the Massachusetts Board of State Examiners of Plumbers and Gas Fitters.
- Fee: $80 PSI exam fee (retakes pay again, non-refundable). Board application and the license fee ($97 for master gas fitter) are separate.
- Our practice exam combines the two parts: Part 1 is 60 questions in 120 minutes and Part 2 is 20 questions in 80 minutes (gas piping 7, gas venting 8, combustion, dilution and ventilation air 5). Each part needs 70%.
- Closed book and two parts. Each part is scored on its own and you must pass both. Nothing is allowed in the exam room, and a silent non-programmable calculator is the only aid.
- If you fail, retake within 12 months of your application approval date. After six failed attempts you must petition the Board in writing before more attempts.
- The references are 248 CMR 3.00, 4.00, 5.00 and 11.00 (2021), 6.00 (2014 NFPA 58 amendments), 7.00 (2014 large gas equipment), 10.00 (Uniform State Plumbing Code, 2023), NFPA 54 (2012), NFPA 58 (2011), and MGL c.142.
- Apply to the Board through the eLIPSE portal. After you pass both parts, pay the license fee in eLIPSE. Exams are at PSI sites in Auburn, Boston, Fall River, Lawrence and West Springfield.
Frequently asked questions
What is on the master gas fitter exam?
Part 1 has 60 questions: gas piping, equipment and appliances 38, venting 15, and general regulations, inspections and permits 7. Part 2 has 20: gas piping 7, gas venting 8, and combustion, dilution and ventilation air 5.
Is it open book?
No. Both parts are closed book.
How does it differ from the journeyman exam?
The outline and counts are the same as the journeyman exam; the license carries more responsibility (a business with a regular place of business).
Free questions with answers
Show all 10 free questions and answers
Natural gas piping (inlet pressure under 2 psi, 0.3 in. w.c. design drop) is sized by the longest length method. The most remote appliance is 60 ft of pipe from the meter and the trunk section from the meter carries 240 cfh. The Schedule 40 table shows these capacities at 60 ft: 3/4 in = 104 cfh, 1 in = 195 cfh, 1-1/4 in = 400 cfh, 1-1/2 in = 600 cfh. What is the smallest nominal size for the trunk section?
Answer: 1-1/4 in
Under the longest length method every section is sized with the length from the point of delivery to the most remote outlet (60 ft) and the load that section carries (240 cfh). 1 in carries only 195 cfh at 60 ft, which is short of 240, so the next size, 1-1/4 in (400 cfh), is the smallest that works. 1-1/2 in would work but is larger than necessary, and 3/4 in carries only 104 cfh.
Reference: NFPA 54 (2012) National Fuel Gas Code, Chapter 6, Pipe Sizing, longest length method and Schedule 40 metallic pipe table (natural gas, under 2 psi, 0.3 in. w.c. drop; matches IFGC 2012 Table 402.4(1))
A fan-assisted Category I furnace rated 100,000 Btu/h is connected directly to a Type B double-wall vent with a total height of 10 ft and a lateral of 5 ft. The single-appliance vent table shows (FAN Min / FAN Max / NAT Max in thousands of Btu/h): 3 in = 23 / 57 / 40; 4 in = 32 / 113 / 77; 5 in = 41 / 187 / 124. What is the smallest vent diameter that can be used?
Answer: 4 in
For a fan-assisted appliance use the FAN Min and FAN Max columns. The 100 (thousand) Btu/h input must fall between them: 3 in tops out at 57, so it is too small; 4 in covers 32 to 113, so 100 fits. 5 in also works but is not the smallest, and its larger size is not needed. Using the NAT Max column (77) would wrongly push you to 5 in.
Reference: NFPA 54 (2012) National Fuel Gas Code, Chapter 13, Sizing of Category I Venting Systems, Type B double-wall gas vent table for a single appliance connected directly to the vent (matches IFGC 2012 Table 504.2(1))
A natural draft water heater with a draft hood is rated 100,000 Btu/h and connects directly to a Type B double-wall vent 10 ft tall with a 5 ft lateral. The table lists (FAN Min / FAN Max / NAT Max in thousands of Btu/h): 3 in = 23 / 57 / 40; 4 in = 32 / 113 / 77; 5 in = 41 / 187 / 124. What is the smallest vent diameter?
Answer: 5 in
A draft hood appliance is natural draft, so only the NAT Max column applies. 4 in is limited to 77 thousand Btu/h, which is below 100, so it fails; 5 in allows 124 and is the smallest that works. The same 100,000 Btu/h fan-assisted appliance could use 4 in, which is why the column must match the appliance type.
Reference: NFPA 54 (2012) National Fuel Gas Code, Chapter 13, Sizing of Category I Venting Systems, Type B double-wall gas vent table for a single appliance connected directly to the vent (matches IFGC 2012 Table 504.2(1))
A utility room holds a furnace rated 80,000 Btu/h and an atmospheric water heater rated 40,000 Btu/h. Using the standard method for indoor combustion air (50 cubic feet per 1,000 Btu/h of appliance input), what is the minimum room volume?
Answer: 6,000 cubic feet
The required volume is the sum for all appliances in the space: (80,000 + 40,000) / 1,000 x 50 = 120 x 50 = 6,000 cubic feet. 4,000 counts only the furnace (80 x 50). 3,600 uses 30 cubic feet per 1,000 Btu/h, a figure for large equipment under 248 CMR 7.02, and 12,000 doubles the correct factor.
Reference: NFPA 54 (2012) National Fuel Gas Code, Chapter 9, Appliance, Equipment, and Accessory Installation, Section 9.3, Air for Combustion and Ventilation, indoor combustion air, standard method (matches IFGC 2012 Section 304.5.1)
Which of these must hold a gas fitting business license under 248 CMR 3.03(1)(a)?
Answer: A limited liability company that employs journeyman gas fitters
Corporations, LLCs, partnerships and similar entities that have plumbing or gas fitting employees must keep a business license. Individuals practicing under their own name or a DBA do not need one, and an apprentice is licensed as an apprentice, not as a business. The business license is issued to a master and is not transferable.
Reference: 248 CMR 3.00: General Provisions Governing the Conduct of Plumbing and Gas Fitting Work, 248 CMR 3.03(1)(a)
The master gas fitter who is licensee of record for a licensed business withdraws and no other master takes over. Under 248 CMR 3.03(1)(e)1, how long may the business keep operating while a new application is pending?
Answer: A new application must be filed within 15 days, and the business may not operate after 60 days or on denial, whichever is first
The withdrawing licensee must notify the Board in writing and return the licenses. If every other person doing the work is validly licensed, the business may continue as long as a licensed master files a new business license application within 15 days of the withdrawal. The business may not continue to operate after 60 days, or if the Board denies the application, whichever comes first.
Reference: 248 CMR 3.00: General Provisions Governing the Conduct of Plumbing and Gas Fitting Work, 248 CMR 3.03(1)(e)1.b
A gas-fired water heating unit has two separate combustion chambers rated 350,000 Btu/h each (700,000 Btu/h total) and is not covered by NFPA 85 or 86. Which requirement set applies to the installation?
Answer: NFPA 54 as modified by 248 CMR 5.00, because each chamber is under 400,000 Btu/h
The 248 CMR 7.00 threshold is more than 400,000 Btu/h per combustion chamber, not total input. Each chamber here is 350,000 Btu/h, so the unit stays under NFPA 54 as modified by 248 CMR 5.00. NFPA 85 applies only to boilers of 12,500,000 Btu/h or more (and certain steam generators), and NFPA 58 is the LP-gas code.
Reference: 248 CMR 4.00: Massachusetts Fuel Gas Code, 248 CMR 4.03(5) and 7.01 (definition of Equipment)
Under 248 CMR 4.03(3), what minimum fuel input makes a gas-fired boiler subject to NFPA 85?
Answer: 12,500,000 Btu/h
The Board adopts NFPA 85 for boilers with a fuel input of 3.7 MWt (12.5 million Btu/h) or greater, and for fuel gas fired steam generators recovering heat from combustion turbines at any input. 400,000 Btu/h per combustion chamber is the point where 248 CMR 7.00 begins, and 1,000,000 and 5,000,000 Btu/h are thresholds for gas train and safety shutoff valve requirements inside 248 CMR 7.03.
Reference: 248 CMR 4.00: Massachusetts Fuel Gas Code, 248 CMR 4.03(3)(a)
A boiler room holds two pieces of large equipment: a water heater with a draft hood rated 1,000,000 Btu/h and a boiler rated 1,500,000 Btu/h connected directly to the chimney without neutralizing air openings. Using the minimum air factors of 248 CMR 7.02(2)(a)2 at standard conditions, how many cubic feet of air per hour must be available at full input?
Answer: 48,000 cubic feet
Apply each factor to its own equipment: draft hood equipment needs 30 cubic feet per 1,000 Btu (1,000 x 30 = 30,000) and equipment connected directly to a chimney without neutralizing openings needs 12 cubic feet per 1,000 Btu (1,500 x 12 = 18,000). Total = 30,000 + 18,000 = 48,000 cubic feet. 57,000 swaps the factors (1,500 x 30 + 1,000 x 12), 75,000 applies 30 to the whole 2,500,000 Btu/h, and 30,000 applies 12 to the whole input.
Reference: 248 CMR 7.00: Large Gas Utilization Equipment, 248 CMR 7.02(2)(a)2
What is the minimum distance from a building opening or air intake to the end of a gas pressure regulator vent line that terminates outside, under 248 CMR 5.09(5)(c)?
Answer: Four feet
Vent lines that end outside a building must be no less than four feet from any building opening or air intake and ten feet from forced air intakes. The 18 inch figure is the minimum height above a roof when the vent penetrates it.
Reference: 248 CMR 5.00: Amendments to NFPA 54, 248 CMR 5.09(5), 9.1.19.1(c)
Sources
- PSI: Massachusetts Plumbers and Gas Fitters Candidate Information Bulletin (10/3/2025) (opens in a new tab)
- Massachusetts Board of State Examiners of Plumbers and Gas Fitters (opens in a new tab)
- 248 CMR (Plumbers and Gas Fitters), Cornell LII (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.