Massachusetts licensing exam

Massachusetts Journeyman Plumber Exam (Part 1, Written): Practice Test & Licensing Guide

Part 1 of the Massachusetts journeyman plumber exam: 80 questions in 160 minutes on gas piping, venting, drain, waste and vent, water supply and the plumbing and gas rules in 248 CMR. Closed book, 70% to pass.

Questions
80
Time limit
2.6666666666666665 hours
Passing score
70%
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10General Regulations, Inspections, and Permits

Under 248 CMR 3.04, a manufacturer submits a new fitting for Board product-acceptance. Which statement is correct?

Requirements at a glance

AgencyBoard of State Examiners of Plumbers and Gas Fitters (Division of Occupational Licensure); exams by PSI
LicenseJourneyman Plumber
FormatPart 1: 80 questions, 160 minutes, closed book, 70% to pass
Fees$80 PSI exam fee; the license fee in eLIPSE is $52 (journeyman, gas fitter, LP gas installer), $78 (master plumber) or $97 (master gas fitter)

Plumbing apprentices applying for a Massachusetts journeyman plumber license from the Board of State Examiners of Plumbers and Gas Fitters.

How to get licensed, step by step

  1. Apply to the Board

    Apply online through eLIPSE with your apprenticeship hours and education. The Board approves you, then PSI contacts you to schedule.

    Board of State Examiners of Plumbers and Gas Fitters (opens in a new tab)

  2. Schedule the journeyman plumber exam with PSI

    Test at a PSI site in Auburn, Boston, Fall River, Lawrence or West Springfield. Cancel at least 2 days ahead or you forfeit the fee.

    Schedule with PSI (Massachusetts plumbers and gas fitters) (opens in a new tab)

  3. Pass both parts

    Each part is scored separately at 70%. Retake within 12 months of approval; after six failed attempts you must petition the Board in writing.

    Schedule with PSI (Massachusetts plumbers and gas fitters) (opens in a new tab)

  4. Get licensed

    Pay the license fee in eLIPSE after you pass both parts.

    Board of State Examiners of Plumbers and Gas Fitters (opens in a new tab)

How to prepare

  • Both parts are closed book. Nothing is allowed in the room, so learn the code rules and numbers rather than where to find them.
  • The editions are 248 CMR 3.00, 4.00, 5.00 and 11.00 (2021), 10.00 (2023 plumbing code), NFPA 54 (2012) and NFPA 58 (2011).
  • Gas piping, equipment and appliances (21), drain, waste and vent (13) and venting (12) are 46 of the 80 questions.
  • Part 2 is a separate written exam (isometric analysis 20, trade calculations 5, gas piping 7, gas venting 8). Practice fixture-unit and pipe-sizing math for it.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • 248 CMR 3.00 (2021), 4.00 (2021), 5.00 (2021), 6.00 (2014 amendments to NFPA 58), 7.00 (2014) and 11.00 (2021)
  • 248 CMR 10.00 to 10.23: Massachusetts Uniform State Plumbing Code (2023)
  • NFPA 54 National Fuel Gas Code (2012) and NFPA 58 Liquefied Petroleum Gas Code (2011)
  • MGL Chapter 142: Supervision of Plumbing, and the general provisions governing plumbing and gas work

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
General Regulations, Inspections, and Permits9
Gas Piping, Equipment, and Appliances21
Venting12
Traps and Cleanouts2
Fixtures, Equipment, and Clearances2
Water Heaters3
Piping, Valves, and Controls3
Water Supply6
Hangers and Supports2
Drain, Waste, and Vent13
Separators, Interceptors, and Grease Traps5
Joints and Connections2

Exam day details

  • Administered by PSI Services for the Massachusetts Board of State Examiners of Plumbers and Gas Fitters.
  • Fee: $80 PSI exam fee (retakes pay again, non-refundable). Board application and the license fee ($52 for journeyman) are separate.
  • 80 questions in 160 minutes; 70% to pass. This is Part 1 (Written). Part 2 (40 questions on isometric analysis, trade calculations, gas piping and gas venting) has its own practice exam, shared with master plumber applicants.
  • Closed book and two parts. Each part is scored on its own and you must pass both. Nothing is allowed in the exam room, and a silent non-programmable calculator is the only aid.
  • If you fail, retake within 12 months of your application approval date. After six failed attempts you must petition the Board in writing before more attempts.
  • The references are 248 CMR 3.00, 4.00, 5.00 and 11.00 (2021), 6.00 (2014 NFPA 58 amendments), 7.00 (2014 large gas equipment), 10.00 (Uniform State Plumbing Code, 2023), NFPA 54 (2012), NFPA 58 (2011), and MGL c.142.
  • Apply to the Board through the eLIPSE portal. After you pass both parts, pay the license fee in eLIPSE. Exams are at PSI sites in Auburn, Boston, Fall River, Lawrence and West Springfield.

Frequently asked questions

What is on the Massachusetts journeyman plumber exam?

Part 1 has 80 questions: gas piping, equipment and appliances 21, drain, waste and vent 13, venting 12, general regulations, inspections and permits 9, water supply 6, separators, interceptors and grease traps 5, water heaters 3, piping, valves and controls 3, and smaller sections for traps, fixtures, hangers and joints.

Is the Massachusetts plumber exam open book?

No. Both parts are closed book, so you need to know the code rules without looking them up.

How many parts are there?

Two. Each is scored separately at 70%, and if you fail one you retake only that part.

Free questions with answers

Show all 10 free questions and answers
  1. Under 248 CMR 3.04, a manufacturer submits a new fitting for Board product-acceptance. Which statement is correct?

    Answer: Only products and materials listed as Product-accepted by the Board may be used

    248 CMR 3.04(1) allows only Board-listed Product-accepted products and materials in plumbing and gas fitting work. No product under a request may be installed before the Board votes to grant it, each item or model number needs its own acceptance, and permanent approvals granted in the past are null and void.

    Reference: 248 CMR 3.00 (2021), 248 CMR 3.04(1)

  2. What is the test pressure requirement for undiluted LP gas piping located upstream of the second-stage regulator?

    Answer: Not less than 1.5 times the maximum operating pressure of the piping

    248 CMR 5.08(1)(a)4 requires LP piping upstream of the second-stage regulator to be tested to not less than 1.5 times its maximum operating pressure, measured with a device that reads in increments of not more than one tenth psig.

    Reference: 248 CMR 5.00 (2021), Amendments to NFPA 54, 248 CMR 5.08(1)(a)4

  3. How must a single-wall metal vent connector be fastened at each joint, and at the draft hood outlet or flue collar, under 248 CMR 5.12(9)?

    Answer: With at least three corrosion-resistant fastening devices

    Replacement section 12.11.6 requires single-wall metal connector joints, and connections to flue collars or draft hood outlets, to be fastened with no fewer than three corrosion-resistant fastening devices. Listed vent connector material is instead assembled per the manufacturer's instructions, or other approved means may be used.

    Reference: 248 CMR 5.00 (2021), Amendments to NFPA 54, 248 CMR 5.12(9) (NFPA 54 12.11.6)

  4. What is the minimum uniform pitch for horizontal drainage piping 3 inches in diameter or smaller under 248 CMR 10.05(2)?

    Answer: 1/4 inch per foot

    Horizontal drainage piping of 3 inches or smaller needs a minimum uniform pitch of 1/4 inch per foot, and larger piping needs 1/8 inch per foot. A lesser pitch is allowed only if a Massachusetts PE designs the system for a discharge velocity of at least 2 feet per second.

    Reference: 248 CMR 10.00, Uniform State Plumbing Code (2023), 248 CMR 10.05(2)(b)

  5. Which trap type is prohibited by 248 CMR 10.08(2)(c)?

    Answer: A bell trap

    Prohibited traps are those depending on moving parts for the seal, bell traps, crown vented traps, separate fixture traps that depend on interior partitions for the seal, and full S traps.

    Reference: 248 CMR 10.00, Uniform State Plumbing Code (2023), 248 CMR 10.08(2)(c)

  6. What is the maximum distance from a grease interceptor installed inside a building to the most remote fixture it serves under 248 CMR 10.09(1)(b)2.f?

    Answer: 25 feet

    Interceptors located inside must be not more than 25 feet from the most remote fixture served. If an exterior interceptor or trap is installed within 25 feet of that fixture, an inside interceptor is not required.

    Reference: 248 CMR 10.00, Uniform State Plumbing Code (2023), 248 CMR 10.09(1)(b)2.f

  7. Which of the following is a prohibited valve or connection on a water supply line under 248 CMR 10.14(3)(l)?

    Answer: A saddle valve

    Saddle valves are prohibited, and no water supply line may be tapped, burned, welded or drilled, except with Board Product-accepted mechanical devices designed to penetrate piping for specific joining methods.

    Reference: 248 CMR 10.00, Uniform State Plumbing Code (2023), 248 CMR 10.14(3)(l)

  8. Where must the temperature and pressure relief valve be located on a vertical tank-type water heater under 248 CMR 10.14(6)(f)2?

    Answer: In a tapping within 12 inches of the top, with no fittings between valve and tank

    A T&P valve goes in a tapping directly in or on the tank within 12 inches of the top of a vertical tank (6 inches for a horizontal tank), with no fittings except a bushing, or in the hot outlet as close to the top of the tank as possible and never more than five inches from the top. The discharge is full size, non-ferrous or rated tubing, with no shutoff, to a fixture or within twelve inches of the floor.

    Reference: 248 CMR 10.00, Uniform State Plumbing Code (2023), 248 CMR 10.14(6)(f)2.b

  9. Where must the full-port main control valve be installed on a building water supply under 248 CMR 10.14(3)(b)?

    Answer: On the discharge side of each water meter, full-port

    A full-port main control valve goes in the water supply main on the discharge side of each water meter, or on the incoming service where there is no meter, and it may be no smaller than the service pipe. A draw-off valve is installed upstream of that valve on the discharge side of each meter.

    Reference: 248 CMR 10.00, Uniform State Plumbing Code (2023), 248 CMR 10.14(3)(b)

  10. Under 248 CMR 10.10(4)(b), what is the minimum drain size for a shower with a single 2.0 GPM shower head?

    Answer: 1-1/2 inches

    A shower with one 2.0 GPM head needs at least a 1-1/2 inch drain. Multiple heads operating together need 2 inches up to 10 GPM, 3 inches up to 20 GPM and 4 inches up to 50 GPM.

    Reference: 248 CMR 10.00, Uniform State Plumbing Code (2023), 248 CMR 10.10(4)(b)

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.